Google Groups no longer supports new Usenet posts or subscriptions. Historical content remains viewable.
Dismiss

Tekken Blood Vengeance 2011 Bluray 1080p 20

108 views
Skip to first unread message

Salome Stmarie

unread,
Dec 10, 2023, 2:45:57 PM12/10/23
to
Tekken: Blood Vengeance - A Thrilling Animated Film Based on the Popular Video Game Series
Tekken: Blood Vengeance is a 2011 Japanese 3D computer-animated film based on the Tekken video game series, produced by Digital Frontier and distributed by Asmik Ace Entertainment in association with Bandai Entertainment. The film follows the adventures of high school student Ling Xiaoyu and android Alisa Bosconovitch as they investigate a mysterious student named Shin Kamiya, who is linked to the Mishima Zaibatsu and G Corporation, two rival conglomerates that are seeking the secret of eternal life. Along the way, they encounter various characters from the Tekken universe, such as Jin Kazama, Nina Williams, Anna Williams, Heihachi Mishima and Kazuya Mishima.



Tekken Blood Vengeance 2011 Bluray 1080p 20

Download https://jfilte.com/2wJMdC






The film was directed by Yoichi Mori and written by Dai Sato, with character designs by Shinji Higuchi and music by Hitoshi Sakimoto. The film was released theatrically in Japan on July 26, 2011, and later on Blu-ray and DVD worldwide. The film received mixed reviews from critics and fans, who praised the animation quality, action scenes and voice acting, but criticized the plot, character development and fan service. The film has a rating of 44% on Rotten Tomatoes and a score of 5.7/10 on IMDb.


If you are a fan of Tekken or anime, you might enjoy watching Tekken: Blood Vengeance. The film is available in both Japanese and English audio, with subtitles in various languages. You can download the film in high quality from YTS or OlaMovies, or watch it online on OpenSea. Here are some links to help you find the film:



YTS: https://yts.mx/movies/tekken-blood-vengeance-2011
OlaMovies: https://olamovies.cloud/tekken-blood-vengeance-2011-1080p-bluray-x265-hevc-10bit-dual-audio-japanese-english-eac3-5-1-esub/
OpenSea: https://opensea.io/collection/tekken-blood-vengeance-2011-bluray-1080p-20

We hope you enjoy watching Tekken: Blood Vengeance and have a great day!





Tekken: Blood Vengeance is not only a film, but also a part of a larger media franchise that spans over two decades. The Tekken video game series, created by Seiichi Ishii and developed by Bandai Namco Studios (formerly Namco), is one of the most successful and influential fighting game franchises of all time. The series has sold over 53.5 million units worldwide, and has been praised for its gameplay mechanics, character roster, story mode, and replay value. The series has also spawned several spin-offs, such as Tekken Tag Tournament, Tekken Card Challenge, Tekken Revolution, and Tekken Mobile.


The Tekken series is known for its rich and complex storyline, which revolves around the conflict between the Mishima family and their quest for the secret of eternal life. The series features a large cast of characters, each with their own backstory, personality, fighting style, and motivation. Some of the most iconic characters include Heihachi Mishima, the ruthless founder of the Mishima Zaibatsu; Kazuya Mishima, his son who inherited the devil gene; Jin Kazama, his grandson who rebelled against his destiny; Nina Williams and Anna Williams, two rival assassins; Paul Phoenix, a hot-headed biker; King, a masked wrestler; Yoshimitsu, a mysterious ninja; and many more.


The Tekken series has also been adapted into various media forms, such as manga, anime, novels, and films. Tekken: Blood Vengeance is the third feature film based on the series, following Tekken: The Motion Picture (1998) and Tekken (2010). The film is set between the events of Tekken 5 and Tekken 6, and focuses on the characters of Ling Xiaoyu and Alisa Bosconovitch as they uncover the truth behind Shin Kamiya's connection to the Mishima Zaibatsu and G Corporation. The film features stunning 3D animation and intense action scenes that capture the essence of the Tekken games.

d8cbe59d7d



0 new messages