!!!! REPORT !!!!

5 views
Skip to first unread message

anshul singhal

unread,
Feb 22, 2010, 10:57:58 AM2/22/10
to mep202_10
Today, I and Puneet attended the briefing which is most probably the last one. In the briefing SRK told that the Detailed Design Report is to be submitted by friday, 26th Feb. The report must include the following:-

1) SolidWorks
- CAD
- Assembly Drawing 
- Component Drawing 
  all drawings should be dimensioned, checked & approved.

2) BOM - every part should be numbered, named and quantified.
3) Bought Out - which components to be bought (eg. nuts, bolts, washers etc.) & which to be fabricated by us. 
4) Raw Materials
5) DFM - Design for manufacturing- Taking care of feasible and easy manufacturing while design.
6) DFA - Design for Assembly - Taking care of feasible and easy assembly while design.

BY 12th March, All the component raw materials must be ordered and all the bills should be submitted for reimbursement by 15th march only.


so, Doston  achha hoga ki is baar kaam jaldi khatam karte hain, friday raat par na chhodte hue.

--
Anshul Singhal
2nd year undergraduate student
Production and Industrial Engineering
Indian Institute of Technology Delhi