Dear Murugan,

Today, the Capacity building is writing a letter to all the bureaus; regarding to come & collect their materials.

They are expecting some explanations; about the material distribution list [Submitted by Alem Sagared ].

 

L – Shape [ 100X60,40 & 25mm]:

It is not quoted & not supplied, but it is mentioned in the distribution list 70,274 & 748 respectively, are we going to manage with T- Joint instead of the L-Shape?

Grounding Unit:

There are 9 types of Grounding Units (screws & grounding cables) we supplied as per the bid, So they are expecting which item needs to supplied to which location.

LF00 Clips:

In the Distribution list has 3152 No’s to be distributed to the bureau’s.

But the bid quoted a single LF00 clip.

 

Earthing Kit:

It is a not quoted one in the bid. Are we going to provide on the time of installation?

Your commands will be speed up the bureau process, please reply as soon as possible.

Note:

Alem is very busy; I unable get his appointment to discuss about this assignment.

Regards,

Copycat Mekelle Team



On Wed, Oct 27, 2010 at 1:15 PM, Copycat Ethiopia IT plc Copycat Ethiopia IT plc <copycatme...@gmail.com> wrote:

Dear Murugan,

 

 The below passive items were accounted perfectly.

 

ü  Angles ( internal, external & flat – for three different measurements)

ü  End caps

ü  T- Joint’s

ü  42U & 12U cabinet with PDU’s

ü  PVC trucking for 100x60,40,25

ü  And 1071E Cat 6 GigaSPEED

 

Note:

 

*       They are writing a letter to all the bureau’s to come & collect their materials.

 

 

 

Thanks & Regards,

Copycat Mekelle Team



On Mon, Oct 25, 2010 at 9:17 PM, Copycat Ethiopia IT plc Copycat Ethiopia IT plc <copycatme...@gmail.com> wrote:

Dear Murugan,

 

 Store Room Number #2 had been accounted completely.

 

ü  Angles ( internal, external & flat – for three different measurements)

ü  End caps

ü  And T- Joint’s are exactly matched with the bid.

 

Ø  42U & 12U rack’s

Ø  PVC trucking for 100x60,40,25

Ø  And 1071E Cat 6 GigaSPEED are on the way to Accounting.

 

Hints:

 

*       They are accounting each & every pieces of the equipment.

*       We are showing them with the pictures & links, till now they don’t have any objections.

*       Currently, the local security guard’s are doing the Labor works in store room & we are paying their daily wages.

  

Kindly do revert, In case of any suggestion / corrections.

 

Thanks & Regards,

Copycat Mekelle Team



On Sun, Oct 24, 2010 at 3:45 PM, Copycat Ethiopia IT plc Copycat Ethiopia IT plc <copycatme...@gmail.com> wrote:

Dear Murugan & Nirmal Kumar,

 

Property & Administration, ICT and Finance teams were started accounting the materials on last week late afternoon.

 

They said “we were planned to follow the given procedures, while distributing the materials”.

 

1. To accounting the materials in the store room and separate them as per bureau wise.

 

2. Write the letter to the individual bureau to come & receive their materials.

 

 

Thanks & Regards,

Copycat Mekelle Team

 




Ramasamy Murugan

unread,
Oct 28, 2010, 3:27:04 AM10/28/10
to Copycat Ethiopia IT plc Copycat Ethiopia IT plc, mekelle...@googlegroups.com, Nirmal Kumar

 

 

Murugan R

 

From: Copycat Ethiopia IT plc Copycat Ethiopia IT plc [mailto:copycatme...@gmail.com]
Sent: Wednesday, October 27, 2010 10:48 PM
To: Ramsamy Murugan
Cc: mekelle...@googlegroups.com; Nirmal Kumar
Subject: L – Shape ,Grounding Unit,LF00 Clips,Earthing Kit:Your commands will be speed up the bureau process, please reply as soon as possible

 

Dear Murugan,

Today, the Capacity building is writing a letter to all the bureaus; regarding to come & collect their materials.

They are expecting some explanations; about the material distribution list [Submitted by Alem Sagared ].

 

L – Shape [ 100X60,40 & 25mm]:

It is not quoted & not supplied, but it is mentioned in the distribution list 70,274 & 748 respectively, are we going to manage with T- Joint instead of the L-Shape? – if not quoted, we manage with what is there. Alem made a design based on old BOM .

Grounding Unit:

There are 9 types of Grounding Units (screws & grounding cables) we supplied as per the bid, So they are expecting which item needs to supplied to which location. The grounding kit goes with each racks

LF00 Clips:

In the Distribution list has 3152 No’s to be distributed to the bureau’s.

But the bid quoted a single LF00 clip. – we supply as per the Bid.

 

Earthing Kit:

It is a not quoted one in the bid. Are we going to provide on the time of installation? – the earthing kit is same as grounding kit

Your commands will be speed up the bureau process, please reply as soon as possible.

Note:

Alem is very busy; I unable get his appointment to discuss about this assignment.

Regards,

Copycat Mekelle Team

 

On Wed, Oct 27, 2010 at 1:15 PM, Copycat Ethiopia IT plc Copycat Ethiopia IT plc <copycatme...@gmail.com> wrote:

Dear Murugan,

 

 The below passive items were accounted perfectly.

 

ü  Angles ( internal, external & flat – for three different measurements)

ü  End caps

ü  T- Joint’s

ü  42U & 12U cabinet with PDU’s

ü  PVC trucking for 100x60,40,25

ü  And 1071E Cat 6 GigaSPEED

 

Note:

 

       They are writing a letter to all the bureau’s to come & collect their materials.

 

 

 

Thanks & Regards,

Copycat Mekelle Team

 

On Mon, Oct 25, 2010 at 9:17 PM, Copycat Ethiopia IT plc Copycat Ethiopia IT plc <copycatme...@gmail.com> wrote:

Dear Murugan,

 

 Store Room Number #2 had been accounted completely.

 

ü  Angles ( internal, external & flat – for three different measurements)

ü  End caps

ü  And T- Joint’s are exactly matched with the bid.

 

Ø  42U & 12U rack’s

Ø  PVC trucking for 100x60,40,25

Ø  And 1071E Cat 6 GigaSPEED are on the way to Accounting.

 

Hints:

 

       They are accounting each & every pieces of the equipment.

       We are showing them with the pictures & links, till now they don’t have any objections.

       Currently, the local security guard’s are doing the Labor works in store room & we are paying their daily wages.

  

Kindly do revert, In case of any suggestion / corrections.

 

Thanks & Regards,

Copycat Mekelle Team

 

On Sun, Oct 24, 2010 at 3:45 PM, Copycat Ethiopia IT plc Copycat Ethiopia IT plc <copycatme...@gmail.com> wrote:

Dear Murugan & Nirmal Kumar,

 

Property & Administration, ICT and Finance teams were started accounting the materials on last week late afternoon.

 

They said “we were planned to follow the given procedures, while distributing the materials”.

 

1. To accounting the materials in the store room and separate them as per bureau wise.

 

2. Write the letter to the individual bureau to come & receive their materials.

 

 

Thanks & Regards,

Copycat Mekelle Team

 

 

 

 



The contents of this electronic mail message and any attachments are confidential and may be legally privileged and protected from discovery or disclosure. This message is intended only for the personal and confidential use of the intended addressee. If you have received this message in error, you are not authorised to view, disseminate, distribute or copy this message or any part of it without our consent, and you are requested to return it to the sender immediately and delete all copies from your system.
The Copy Cat Ltd cannot guarantee that this message or any attachment is virus free, does not contain malicious code or is incompatible with your electronic system and does not accept liability in respect of viruses, malicious code or any related problems that you might experience.
Unless specifically stated, any views expressed may not necessarily be the Company but that of the sender.
Reply all
Reply to author
Forward
0 new messages