forward this mail on your group mail id urgently.........................
All the students of third year are hereby informed that those who have been
ABSENT / NOT SATISFACTORY in first [19-23 jan], or second presentation (23-28 feb)...
they are to report on 2/3/15 at 9 :00 AM and ,if you fail to do so you will not be
allowed to sit for remaining presentation..........
contact the project guide of their availability on that day.....
you need to prepare the points below...
=====================================================
Part -1
Abstract
1. Preliminary Investigation
1.1 Feasibility Study
1.1.1 Technical Feasibility
Hardware Requirements
Software Requirements
1.1.2 Operational Feasibility
2. Determination of System Requirement
2.1. Reviewing Organization Documents
2.2. Onsite Observations
2.3 Conducting Interviews
2.4 Study of Similar Systems
3. Proposed System
4. Project Scope
5. Project Limitation
6. References
Part -2
7. ERD
8.DATABASE
9 ALL UML Diagrams etc....
====================================================================
come prepared with the PPT .....covering all points
===========================================================================