This Saturday and Sunday the space will be open in the Afternoon (12 noon to 5 PM) There are some partially completed projects that need to be finished in the shop area.
1. The enclosure behind the sink needs to be finished.
2. The new pegboard needs to be painted
3. Chairs in the hallway need to be carried down stairs
4. Pegboard installed in third room
5. Battery charging station to be built and installed in shop.
6. Roll paper hanger needs to be built and installed in classroom
7. Microwave shelf to be built and installed after sink enclosure is finished
Come over and take a look give a hand see the array of tools and equipment that we have for members to use. (the web page does not do it justice yet.