limesh M

unread,
Aug 6, 2010, 2:22:08 AM8/6/10
to Materials & Welding
Dear All,

Is there any technical term called 'Dollymix' in pipeline welding?

I searched lot of literature but all efforts are in vein.I found that
many contractors WPS says 'Dollymix' progression !!!

Root pass uphill and remaining downhill called dollymix or root and
hot pass uphill and remaining downhill called dollymix? Is it a local
terminology or worldwide accepted one?

Regards,


Limesh

Phil...@esab.net

unread,
Aug 6, 2010, 3:08:18 AM8/6/10
to materials-welding
Dear limes
It is pipeline terminology that is commonly known here in Europe

Best Regards

PHIL CHEW

Global Segment Manager -Transport ,Shipbuilding,M&R

ESAB Holdings Ltd, 322 High Holborn, London, UK, WC1V 7PB

Tel: +44 (0) 7584 219132

email: PHIL...@esab.net

ESAB Holdings Ltd is a company registered in England and Wales . Co registration no 1687590 Registered Office: 322 High Holborn, London , UK , WC1V 7PB www.esab.comPlease consider the environment before printing this email.

Dear All,

Regards,


Limesh

--
To post to this group, send email to material...@googlegroups.com
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

______________________________________________________________________
This communication and any files transmitted with it contain information which is confidential and which may also be privileged. It is for the exclusive use of the intended recipient(s). If you are not the intended recipient(s), please note that any disclosure, copying, printing or use whatsoever of this communication or the information contained in it is strictly prohibited. If you have received this communication in error, please notify us by e-mail or by telephone as above and then delete the e-mail together with any copies of it.

ESAB does not accept liability for the integrity of this message or for any changes, which may occur in transmission due to network, machine or software failure or manufacture or operator error. Although this communication and any files transmitted with it are believed to be free of any virus or any other defect which might affect any computer or IT system into which they are received and opened, it is the responsibility of the recipient to ensure that they are virus free and no responsibility will be accepted by ESAB for any loss or damage arising in any way from receipt or use thereof.

sumit jaura

unread,
Aug 7, 2010, 3:16:10 AM8/7/10
to Materials & Welding
Dear Limesh,,


It is called dolly mix because first pass is uphill and remaining pass
are downhill,

moslty qualified as WPS-02. Dollymix is often has more strength than
downhill welding.

limesh M

unread,
Aug 7, 2010, 11:50:01 AM8/7/10
to material...@googlegroups.com
Dear All,
 
Could you please give some literature explaining the term 'DOLLYMIX'.
 
Regards,
 
Limesh
 


 

nistala sarma

unread,
Aug 7, 2010, 10:46:16 PM8/7/10
to material...@googlegroups.com
Dear Sir,
 
Good morning,
 
Yes it is correct in AWS D1.1 it was writen clearly. and mainly this kind of down hill position used in 6GR position for offshore pipe line structure, and even ABS, DNV also mentioned about this, mainly to controll the heat in put parameters on parent metal and as well as weld pool.
 
Thanks

--
To post to this group, send email to material...@googlegroups.com
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.



--

Thanks & Regards
N.V.K.SARMA
Inspection Engineer
TUV Rheinland Middle East Fze
4A, 307, Dubai Airport Authority,
Po.Box No: 293542
Dubai,UAE
Mob: 00971 50 2512149,
0097150 1460340
e-mail:sarma....@uae.tuv.com, nvksh...@yahoo.com, nvks...@eim.ae

 



Feroz Mohammed

unread,
Aug 8, 2010, 1:31:59 AM8/8/10
to material...@googlegroups.com
IT IS COMBINATION OF BOTH UPHILL & DOWN PROGRESSION CALLED DOLLYMIX


Root pass uphill and remaining downhill called dollymix or root and
hot pass uphill and remaining downhill called dollymix

--
To post to this group, send email to material...@googlegroups.com
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.



--
Feroz Mohammed
BV_Vizag
9177631000 begin_of_the_skype_highlighting              9177631000      end_of_the_skype_highlighting

limesh M

unread,
Aug 8, 2010, 10:21:58 AM8/8/10
to material...@googlegroups.com
Dear N.V.K SARMA,
 
Could you please specify the clauses in AWS D1.1,ABS and DNV discussing 'DOLLYMIX'.
 
Regards,
 
Limesh