Radiography of tube to tubesheet welds

459 views
Skip to first unread message

Bathula Raghuram (Mumbai - PIPING)

unread,
Oct 1, 2008, 4:18:11 AM10/1/08
to Materials-Welding (E-mail)
Can anybody has experience with performance of RT on tube to tubesheet welds, please share details for both techniques (i.e. back radiation and forward radiation), equipment literature if any for this type RT.

Jignesh Patel

unread,
Oct 5, 2008, 12:38:59 PM10/5/08
to material...@googlegroups.com
Dear Mr. Raghuram,

I have never heard or seen RT of TTS [Tube to Tubesheet joints]. TTS welds
are normally checked by Penetrant testing, Pneumatic testing and complete
penetration [during mock up tests].

I too would like to know if RT of TTS is carried out and how its done.

Thanks and regards,

Jignesh

Kuwait

For your virus protection, any attachments should be considered uncontrolled
unless they are identified in the text. The sender does not accept liability
for any virus introduced by this email or any attachment.

Jignesh Patel

unread,
Oct 5, 2008, 12:38:59 PM10/5/08
to material...@googlegroups.com
Dear Mr. Raghuram,

I have never heard or seen RT of TTS [Tube to Tubesheet joints]. TTS welds
are normally checked by Penetrant testing, Pneumatic testing and complete
penetration [during mock up tests].

I too would like to know if RT of TTS is carried out and how its done.

Thanks and regards,

Jignesh

Kuwait

For your virus protection, any attachments should be considered uncontrolled
unless they are identified in the text. The sender does not accept liability
for any virus introduced by this email or any attachment.

-----Original Message-----
From: material...@googlegroups.com
[mailto:material...@googlegroups.com] On Behalf Of Bathula Raghuram
(Mumbai - PIPING)
Sent: Wednesday, October 01, 2008 11:18 AM
To: Materials-Welding (E-mail)
Subject: [MW:1177] Radiography of tube to tubesheet welds

Jignesh Patel

unread,
Oct 5, 2008, 12:38:59 PM10/5/08
to material...@googlegroups.com
Dear Mr. Raghuram,

I have never heard or seen RT of TTS [Tube to Tubesheet joints]. TTS welds
are normally checked by Penetrant testing, Pneumatic testing and complete
penetration [during mock up tests].

I too would like to know if RT of TTS is carried out and how its done.

Thanks and regards,

Jignesh

Kuwait

For your virus protection, any attachments should be considered uncontrolled
unless they are identified in the text. The sender does not accept liability
for any virus introduced by this email or any attachment.

-----Original Message-----
From: material...@googlegroups.com
[mailto:material...@googlegroups.com] On Behalf Of Bathula Raghuram
(Mumbai - PIPING)
Sent: Wednesday, October 01, 2008 11:18 AM
To: Materials-Welding (E-mail)
Subject: [MW:1177] Radiography of tube to tubesheet welds

Tirumala B N Tagore

unread,
Oct 6, 2008, 4:22:25 AM10/6/08
to material...@googlegroups.com
In ceratin conditions Tube are attached to tube sheet by Butt weld configuration. (Eg when coke formation is anticipated, thermal gradient requirements demand  etc.)
In such cases TTP joint is examined by UT. The  butt weld is a radiographable theoretically  but in practice RT is not feasible due to presence of  cluster of  joints. UT is the NDE demaded for such joints. Internal bore welding machines are used for such welds.
Tagore

 

rajesh patel

unread,
Oct 6, 2008, 10:28:18 AM10/6/08
to material...@googlegroups.com
Friends,

Helium leak test may be carried out to ensure the quality of TTS weld joints after PT.

Rajesh


--- On Mon, 10/6/08, Tirumala B N Tagore <tagor...@gmail.com> wrote:

rajesh patel

unread,
Oct 6, 2008, 10:28:18 AM10/6/08
to material...@googlegroups.com
Friends,

Helium leak test may be carried out to ensure the quality of TTS weld joints after PT.

Rajesh


--- On Mon, 10/6/08, Tirumala B N Tagore <tagor...@gmail.com> wrote:

> From: Tirumala B N Tagore <tagor...@gmail.com>
> Subject: [MW:1187] Re: 1177] Radiography of tube to tubesheet welds
> To: material...@googlegroups.com
> Date: Monday, October 6, 2008, 1:52 PM

rajesh patel

unread,
Oct 6, 2008, 10:28:18 AM10/6/08
to material...@googlegroups.com
Friends,

Helium leak test may be carried out to ensure the quality of TTS weld joints after PT.

Rajesh


--- On Mon, 10/6/08, Tirumala B N Tagore <tagor...@gmail.com> wrote:

> From: Tirumala B N Tagore <tagor...@gmail.com>
> Subject: [MW:1187] Re: 1177] Radiography of tube to tubesheet welds
> To: material...@googlegroups.com
> Date: Monday, October 6, 2008, 1:52 PM

Bathula Raghuram (Mumbai - PIPING)

unread,
Oct 7, 2008, 2:23:41 AM10/7/08
to Materials-Welding (E-mail)

-----Original Message-----
From: PEMMARAJU RAGHAVENDRA [mailto:r...@hzw.ltindia.com]
Sent: Tuesday, October 07, 2008 5:30 AM
To: Bathula Raghuram (Mumbai - PIPING); skuma...@yahoo.co.in
Subject: Re: [MW:1177] Radiography of tube to tubesheet welds


We have done extensive RT of such joints in the past.
We have adopted the back radiation technique in which the source shall be moving from the front side of the joint. We have used the roli camera without guide tube and only the cranking unit wire coupled with source pigtail shall be used.The film used was of AGFA D4 with a special type of cassette with a hole at the centre.Vide this hole on the film cassette, the source enters into its position in case of back radiation technique.
It is preferred to use low curie source of Ir-192 of the order 3 to 4Ci.
Refer the attached word file for the source and film setup.

Instead of Gamma rays, you may use micro-focus X ray machine with hooded anode target which was developed by Sasol.


regards,
RPE


Larsen & Toubro Limited
www.larsentoubro.com

This Email may contain confidential or privileged information for the intended recipient (s) If you are not the intended recipient, please do not use or disseminate the information, notify the sender and delete it from your system.

source setup.doc

Agrawal Sunil (Mumbai -Stequ)

unread,
Oct 8, 2008, 2:53:16 AM10/8/08
to material...@googlegroups.com

Regarding subject topic, please find attached tube to tubesheet radiography procedure followed for our one of the recent job….

 

Best regards,

 

Sunil S. Agrawal

Static Equipment Dept. (STEQU)

Engineering & Design Tecnimont ICB

101/102, Interface-11, Link Road, Malad (w), Mumbai - 400 064 ( +91.22.6777.7237 * s.ag...@ticb.com

 

-----Original Message-----
From: material...@googlegroups.com [mailto:material...@googlegroups.com] On Behalf Of Bathula Raghuram (Mumbai - PIPING)
Sent: Tuesday, October 07, 2008 11:54 AM
To: Materials-Welding (E-mail)

20081008122806239.pdf

Tirumala B N Tagore

unread,
Oct 9, 2008, 2:54:42 AM10/9/08
to material...@googlegroups.com
the detail shown is not applicable to examine butt welded type weld.
for your info.
regards,
tagore