Change in Manufacturer for Plate Requires MPQT in Line pipe
383 views
Skip to first unread message
Murali Krishnan
unread,
Apr 29, 2012, 2:37:33 PM4/29/12
Reply to author
Sign in to reply to author
Forward
Sign in to forward
Delete
You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to material...@googlegroups.com
Dear Experts,
One of the Manufacturer initially rolled the line pipe (API 5L) for the line item x ( dia 44" x 16.9 mm) with Voset Alpine plates, for the same manufacturer conducted Manufacturer Procedure Qualification test (MPQT) and the result found satisfactory. As there was not enough quantity of plates to complete the line item Manufacturer informed the line item x will be rolled after procuring the plates. Mean time manufacturer rolled for other line items of the same P.O with different sizes. Manufacturer received the plates from Sumitomo instead of Voest alpine to complete the partially rolled line item x ( dia 44" x 16.9 mm). In this case whether manufacturer shall conduct MPQT once again for the Sumitomo Plates for the line item x ( dia 44" x 16.9 mm) or elsae we shall conduct test unit only instead of MPQT. Please clear my doubt.