RT mandatory for PQR

323 views
Skip to first unread message

S.Mohammed

unread,
Jun 23, 2014, 7:45:10 AM6/23/14
to material...@googlegroups.com

Dear all,

Code: AsME9/B31.1.

I qualified PQR all test passed.
but due to some communucation problems test piece direct went for machining for sample.

Now client.demand RT report for WPS approval?
Is it mandatory to do RT prior PQR testing?

Regards
Mohd.

Kannayeram Gnanapandithan

unread,
Jun 23, 2014, 7:51:31 AM6/23/14
to materials-welding
Not Mandatory

THANKS & BEST REGARDS
KG.PANDITHAN, AWS-CWI, CSWIP 3.1
CONSULTANT-WELDING & QUALITY


--
To post to this group, send email to material...@googlegroups.com
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-weld...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

george....@gr.bureauveritas.com

unread,
Jun 23, 2014, 8:11:55 AM6/23/14
to material...@googlegroups.com

Not, if ASME section IX is applicable.
Yes in case EN standard is applicable

    best regards

    Dr. Georgios Dilintas

    Authorized Nuclear Inspector
    Authorized Inspector Supervisor


    I&F REGIONAL TECHNICAL MANAGER
    BUREAU VERITAS HELLAS

    Tel: +30 210 40 63 113/4
    Fax: +30 210 40 63 118
    Cell: +30 69 44 64 62 04
    (See attached file: Dilintas_George.vcf)
This message contains confidential information. To know more, please click on the following link: http://disclaimer.bureauveritas.com

Dilintas_George.vcf

E.S.Mani

unread,
Jun 23, 2014, 8:39:09 PM6/23/14
to material...@googlegroups.com
But almost all the client spec. asked to do the RT for PQR, before Mechanical Test. AS per Sec. IX not mandatory.

Regards,

E.Subramanian


--
To post to this group, send email to material...@googlegroups.com
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-weld...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.



--

Regards,

E.Subramanian

Kannayeram Gnanapandithan

unread,
Jun 23, 2014, 8:39:19 PM6/23/14
to materials-welding
AWS D1.1---Mandatory

THANKS & BEST REGARDS
KG.PANDITHAN, AWS-CWI, CSWIP 3.1
CONSULTANT-WELDING & QUALITY


--

CHINTUKUMAR GANDHI

unread,
Jun 23, 2014, 8:39:30 PM6/23/14
to material...@googlegroups.com
Again, you will have to refer client's applicable spec. If specified in those docs., then it is required.

Thanks & regards,

C. R. GANDHI


From: "george....@gr.bureauveritas.com" <george....@gr.bureauveritas.com>
To: material...@googlegroups.com
Sent: Monday, June 23, 2014 5:41 PM
Subject: Re: [MW:21236] RT mandatory for PQR

sudhakar kuppuswamy

unread,
Jun 24, 2014, 1:30:41 AM6/24/14
to material...@googlegroups.com
if client spec calls for such requirements , then mandatory.

Usually such mistake occurs ,you can convince your client , by taking RT for the very first production joint welded using that WPS and with  the same welder who had welded the PQR.


the client can accept the PQR, if mechanical & other required test are passed.


Regards
Sudhakar.K



On Mon, Jun 23, 2014 at 4:49 PM, S.Mohammed <mohd...@gmail.com> wrote:

--

ABHISHEK SINGH

unread,
Jul 9, 2014, 11:51:05 AM7/9/14
to material...@googlegroups.com
For PQR RT is not required as per ASME Sec. IX.
But doing RT is good practice for PQR,because various mechanical test of PQR is carried out, If test piece taken from defected area then there is a changes of faliure of test specimen.
 
Regards
Abhishek Singh

Kannayeram Gnanapandithan

unread,
Jul 10, 2014, 12:47:43 AM7/10/14
to materials-welding
When there is no requirement for RT as per Sec9, suppose if RT is taken, What is acceptance Standard/Level???

THANKS & BEST REGARDS
KG.PANDITHAN, AWS-CWI, CSWIP 3.1
CONSULTANT-WELDING & QUALITY


--

Shashank Vagal

unread,
Jul 10, 2014, 2:05:52 AM7/10/14
to material...@googlegroups.com
RT Acc Criteria: See QW 191.2.2, Sec IX
 
With Best Regards,
Shashank C Vagal (Quality Adviser)

Kannayeram Gnanapandithan

unread,
Jul 10, 2014, 8:09:10 AM7/10/14
to materials-welding
Is it for Procedure Qualification???

THANKS & BEST REGARDS
KG.PANDITHAN, AWS-CWI, CSWIP 3.1
CONSULTANT-WELDING & QUALITY


Sam

unread,
Jul 15, 2014, 9:57:17 AM7/15/14
to material...@googlegroups.com
actually RT shall not allowed because it can be used by contractor to select test specimen from the area without any defects !!!!!!!!!!!

Gopalakrishnan G

unread,
Jul 15, 2014, 9:43:29 PM7/15/14
to material...@googlegroups.com
NOT MANDATORY. BUT DEPENDS ON CLIENT REQUIREMENTS.
G.Gopalakrishnan
Welding Engineer
Mukand Ltd
Mumbai
Moble :+91-9833397917