Dear all 
Please clarify below 
What’s are the test required for corrosion resistant overlay 
procedure and performance qualification
As per ASME SEC IX TABLE QW -453 
LPT , BEND TEST -PROCEDURE QUALIFICATION 
BEND TEST - PERFORMANCE QUALIFICATION 
if any additional test required  please gudie me 
We useing this PQR for flange groove overlay 



Regards 
ELAVARASAN

Deerendra Karanth

unread,
Jun 4, 2025, 4:56:35 AM6/4/25
to material...@googlegroups.com

Sir, 

With reference to your query regarding the required tests for corrosion resistant overlay procedure and performance qualification as per ASME Section IX, Table QW-453, in addition to the mentioned LPT and bend tests, the following supplementary tests are recommended—especially considering the application for overlay:

1. Chemical Analysis – As per ASME Section IX Figure QW-462.5(a) to verify composition of the deposited layer. Attached snapshot 

2. Hardness Survey – In accordance with NACE MR0175 to ensure compatibility with sour service, if applicable.

3. Metallographic Examination – To assess overlay quality, dilution, and fusion characteristics.

4. Microstructure Examination – Typically conducted at 100X to 500X magnification.

5. Ultrasonic Testing (UT) – To check for disbondment between the base metal and overlay.

Please ensure these tests are reviewed in alignment with project or client-specific requirements.

BR, 

Deerendra 



--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-weld...@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/materials-welding/CAJ9L4ynzxQAHgamocxh95qXUb-t%3D1Y0W_ohAdDrF%2B4OGdL8FOg%40mail.gmail.com.

Raviraj Gohil

unread,
Jun 5, 2025, 7:03:33 AM6/5/25
to material...@googlegroups.com

Hi..

If your equipment in hydrogen service and Hydrogen Disbonding test is required..


Ulaganathan Ranjith

unread,
Jun 7, 2025, 11:54:58 AM6/7/25
to material...@googlegroups.com

Sent from my iPhone

On 5 Jun 2025, at 2:03 PM, Raviraj Gohil <raviraj....@gmail.com> wrote:



Hi..

If your equipment in hydrogen service and Hydrogen Disbonding test is required..


On Wed, 4 Jun 2025, 14:26 Deerendra Karanth, <dkar...@gmail.com> wrote:

Sir, 

With reference to your query regarding the required tests for corrosion resistant overlay procedure and performance qualification as per ASME Section IX, Table QW-453, in addition to the mentioned LPT and bend tests, the following supplementary tests are recommended—especially considering the application for overlay:

1. Chemical Analysis – As per ASME Section IX Figure QW-462.5(a) to verify composition of the deposited layer. Attached snapshot 

2. Hardness Survey – In accordance with NACE MR0175 to ensure compatibility with sour service, if applicable.

3. Metallographic Examination – To assess overlay quality, dilution, and fusion characteristics.

4. Microstructure Examination – Typically conducted at 100X to 500X magnification.

5. Ultrasonic Testing (UT) – To check for disbondment between the base metal and overlay.

Please ensure these tests are reviewed in alignment with project or client-specific requirements.

BR, 

Deerendra 