For welding Pipe API 5LX52 to Flange ASTM A105  in a pipe line project we should use 7018 or 7010 is enough to give us the desired quality.( i think that fitting to fitting we have use 7018 but fitting to pipe, can we use 7010)

Eng.MOHAMMED ABD EL-AZIM HILAL
        MECHANICAL ENGINEER
     CSWIP 3.1 - NDT (RT- MT - PT)
OTISHAN CONSULTANT ENGINEER
 00966-502612218  -  0020103124557

Prabhu Kumar L

unread,
Jun 8, 2010, 4:07:30 AM6/8/10
to material...@googlegroups.com

Dear Mohammed,

 

You can follow any one of the option for welding of X52 to A105.

 

  1. Root pass with E6010 and rest by E7010 by uphill or dollymix (root-uphill and rest-downhill) progression.
  2. Root pass with E6010 and rest by E7018 by uphill progression

 

No restriction on use of cellulosic or low hydrogen electrodes for welding of pipe to fittings/ flanges. However, for any repair welding, it is recommended to use low hydrogen electrodes in order to reduce hydrogen induced cracking problems.

 

Regards,

 

L. Prabhu kumar,

Sr. Principal Engineer,

 

Equipments & Materials Dept.,

Saipem India Projects Limited,

Nungambakkam High Road, Chennai - 600 034, India.

Tel:+91 44 43906588, Ext.: 588, Fax:+91 44 66840345,

Mobile Ph. No.: +91 9003010978.


--
To post to this group, send email to material...@googlegroups.com
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

 

 




-------------------------------------------------------------------------------------------------------------------------------------------------------------------
DISCLAIMER: The information contained in this communication is intended solely for the use of the individual or 
entity to whom it is addressed and others authorized to receive it. It may contain confidential or legally privileged 
information. If you are not the intended recipient, you are hereby notified that any disclosure, copying, distribution 
or taking any action in reliance on the contents of this information is strictly prohibited and may be unlawful. If 
you have received this communication in error, please notify us immediately by responding to this email and then 
delete it from your system. Saipem India Projects Limited (SIPL) is neither liable for the proper and complete 
transmission of the information contained in this communication nor for any delay in its receipt. 
-------------------------------------------------------------------------------------------------------------------------------------------------------------------

Nivendkar Vinayak (Mumbai - Piping)

unread,
Jun 8, 2010, 8:48:35 AM6/8/10
to material...@googlegroups.com

Dear all,

 

Regarding reinforcement of piping branch connection As per ASME B 31.3 para.304.3

 

Can we use two halves pipe for reinforcement of header pipe considering the actual Dh/Dt ratio is not fulfilling the requirements para 304.3.1(b).

Does ASME B 31.3 shall allowed these type of connection?

 

The same type branching connection mostly used in HOT tapping procedure.

 

Thanks in advance

 

Vinayak

 

 


N VENKATESWARA PRASAD

unread,
Jun 8, 2010, 11:02:09 PM6/8/10
to material...@googlegroups.com
Dear Mohammed,
 
What is size of pipe and Flange.  As per API 1104 and also as per many client specifications calls for repair procedures.  So to have better quality it is prudent to Root with TIG welding with ER 70S3 and followed by E 7018 with full up hill welding.  The welding quality in up hill welding is better than down hill welding.   Down hill welding is only preferred for higher productivity.  For fittings as per Qatar petrolium specifications only up hill welding is allowed.  You must do preheating also as the flanges are of higher mass.  Do preheating up to 100 C.
 
Regards
 
N.V. PRASAD
WELDING ENGINEER
VELOSI CERTIFICATION., QATAR
009745974703

Marty Morgan

unread,
Jun 9, 2010, 1:42:40 AM6/9/10
to material...@googlegroups.com

It is the preferred method to use ONLY uphill welding when using a stick welder for fear of slag inclusions in the finished weld

 


john rodrigues

unread,
Jun 8, 2010, 4:51:28 AM6/8/10
to material...@googlegroups.com
Proceed according to project approved WPS.

On Tue, 08 Jun 2010 12:14:30 +0530 wrote

>
>
Eng.MOHAMMED ABD EL-AZIM HILAL
MECHANICAL ENGINEER
CSWIP 3.1- NDT (RT- MT - PT)

OTISHAN CONSULTANT ENGINEER
00966-502612218 - 0020103124557






--
>
To post to this group, send email to material...@googlegroups.com
>
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
>
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
>
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
>



John Rodrigues

AGUSTIN JIMENEZ

unread,
Jun 8, 2010, 2:21:15 PM6/8/10
to material...@googlegroups.com, INSPECTORES DE EQUIPOS ESATICOS
Hi MOHAMMED too you can use Root pass with E7010A1 and rest by E8018G by uphill progression, We welded with it welding procedure.
the 7018 stress is very close the base metal stress, is better use 8018.
 
Agustin



De: Prabhu Kumar L <l.prab...@saipem-india.com>
Para: material...@googlegroups.com
Enviado: mar, junio 8, 2010 3:37:30 AM
Asunto: [MW:5463] RE: 5437] welding Pipe API 5LX52 to Flange ASTM A105

N VENKATESWARA PRASAD

unread,
Jun 9, 2010, 9:22:04 AM6/9/10
to material...@googlegroups.com
105 N has UTS less than 70 PSI  so you should go with only 70xx than 80xx.
 
regards