USE of PQR for more than one Subcontractors

881 views
Skip to first unread message

Parveen Kumar Nakwal

unread,
Jul 10, 2012, 4:18:57 AM7/10/12
to material...@googlegroups.com
Dear Experts.
 
Let us suposse client is A & B is Contractor.
Under B ( C,D & E are more 3 subcontractor companies are working).
 
WPS/PQR had been established by Subcontractor C only under the shadow of B.
SO can other subcontractors i.e D & E companies can use the same PQR.
 
please mention the clause no. as per ASME sec. IX, is it QW302 ?
 
Waiting for reply.
 
Parveen K. Nakwal

Muhammed Ibrahim PK

unread,
Jul 10, 2012, 6:07:21 AM7/10/12
to material...@googlegroups.com
No, Each company should have their own procedure.

Thanks & Regards
Muhammed Ibrahim PK



--
To post to this group, send email to material...@googlegroups.com
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

nagaraja...@linde-le.com

unread,
Jul 10, 2012, 6:27:09 AM7/10/12
to material...@googlegroups.com

Dear Mr. Parveen K. Nakwal
Yes, D & E can use the PQR of C

QW-201 Manufacturer’s or Contractor’s
Responsibility
The Code recognizes a manufacturer or contractor as
the organization which has responsible operational control
of the production of the weldments to be made in accordance
with this Code. If in an organization effective operational
control of welding procedure qualification for two
or more companies of different names exists, the companies
involved shall describe in their Quality Control
system/Quality Assurance Program, the operational control
of procedure qualifications. In this case separate welding
procedure qualifications are not required, provided all other
requirements of Section IX are met.



Best Regards,


Nagarajan B



Inactive hide details for Parveen Kumar Nakwal ---10/07/2012 15:32:34---Dear Experts. Let us suposse client is A & B is ContracParveen Kumar Nakwal ---10/07/2012 15:32:34---Dear Experts. Let us suposse client is A & B is Contractor.

--

To post to this group, send email to material...@googlegroups.com
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
For more options, visit this group's bolg at

c sridhar

unread,
Jul 10, 2012, 7:32:52 AM7/10/12
to material...@googlegroups.com
The answer is no.
As per Sec. IX of ASME-

QW 200.1, Each manufacturer and sub contractor shall prepare written welding procedure Specification.
QW 200.2, Each manufacturer or subcontractor shall be required to prepare a Procedure Qualification record.

You can note the difference in both.

QW 201 states that, 'the code recognizes a manufacturer or contractor as the organization which has responsible operational control of the production of the weldments to be made in accordance with the Sec. IX code.

Hence, it is more appropriate if the manufacturer or contractor prepares the WPS & PQR in their name and ask the subcontractors like C, D or E  or others to follow it.

QW 302 do not come into the picture at all.

sridhar.
0 9444971077.



From: Parveen Kumar Nakwal <pkna...@gmail.com>
To: material...@googlegroups.com
Sent: Tuesday, 10 July 2012 1:48 PM

Subject: [MW:14830] USE of PQR for more than one Subcontractors

John Henning

unread,
Jul 10, 2012, 11:02:29 AM7/10/12
to material...@googlegroups.com

In general, the answer is no.  If these contractors are independent and have their own quality control manual under which the work is performed, then the answer is solidly no. This is the general intent of the Code – each entity involved in ASME fabrication shall have their own procedures.

 

However,QW-201 does allow for exchange of WPSs/PQRs if the subordinate companies perform all work under the quality control manual of the superior company.  This would be most common in corporate divisions/companies working under one parent company.

 

Please review ASME Interpretation IX-01-02.

 

John A. Henning

Welding & Materials

 

From: material...@googlegroups.com [mailto:material...@googlegroups.com] On Behalf Of Parveen Kumar Nakwal
Sent: Tuesday, July 10, 2012 3:19 AM
To: material...@googlegroups.com
Subject: [MW:14830] USE of PQR for more than one Subcontractors

 

Dear Experts.

--

To post to this group, send email to material...@googlegroups.com
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.


______________________________________________________________________
The information in this email is confidential, and is intended solely for the addressee(s). If you are not the intended recipient of this email please let us know by reply and then delete it from your system; you should not copy this message or disclose its contents to anyone. The internet can not guarantee the integrity of this message. HAMON (and its subsidiaries) shall (will) not therefore be liable for the message if modified.