Dear Mr. Parveen K. Nakwal
Yes, D & E can use the PQR of C
QW-201 Manufacturer’s or Contractor’s
Responsibility
The Code recognizes a manufacturer or contractor as
the organization which has responsible operational control
of the production of the weldments to be made in accordance
with this Code. If in an organization effective operational
control of welding procedure qualification for two
or more companies of different names exists, the companies
involved shall describe in their Quality Control
system/Quality Assurance Program, the operational control
of procedure qualifications. In this case separate welding
procedure qualifications are not required, provided all other
requirements of Section IX are met.
Best Regards,
Nagarajan B
Parveen Kumar Nakwal ---10/07/2012 15:32:34---Dear Experts. Let us suposse client is A & B is Contractor.
--
To post to this group, send email to material...@googlegroups.com
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
For more options, visit this group's bolg at
In general, the answer is no. If these contractors are independent and have their own quality control manual under which the work is performed, then the answer is solidly no. This is the general intent of the Code – each entity involved in ASME fabrication shall have their own procedures.
However,QW-201 does allow for exchange of WPSs/PQRs if the subordinate companies perform all work under the quality control manual of the superior company. This would be most common in corporate divisions/companies working under one parent company.
Please review ASME Interpretation IX-01-02.
John A. Henning
Welding & Materials
From: material...@googlegroups.com [mailto:material...@googlegroups.com] On Behalf Of Parveen Kumar Nakwal
Sent: Tuesday, July 10, 2012 3:19 AM
To: material...@googlegroups.com
Subject: [MW:14830] USE of PQR for more than one Subcontractors
Dear Experts.
--
To post to this group, send email to material...@googlegroups.com
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.