--
To post to this group, send email to material...@googlegroups.com
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
I don’t think submission of equipment calibration cert. is stated in any welding code but it’s a norm/good practice before WQT or PQT or any work requiring such equipment is carried out. It is always stated in any good quality contractual document. Moreover, It is one of the QC preliminary requirements before welding will commence including the voltage/current/temperature measuring devices.
“Quality is the Bone, Be the Dog Always”
Boniface Obidike
QA/QC Engineer
Speciality Connectors & Pipes
Drilling and Production Systems
GE Oil & Gas Business
Mail: Boniface...@ge.com
Office: +234(1)4629400
Mobile: +2348163479738
Home: +2348039409934