Nozzle weld as per UW16.1 figure f-4 (weld metal build up)

3,160 views
Skip to first unread message

Bathula Raghuram (Mumbai - PIPING)

unread,
Aug 19, 2010, 1:43:36 AM8/19/10
to material...@googlegroups.com
 
When a lip type joint is specified as per ASME Sec VIII div 1,   UW16.1 figure  f-4 (as below), can the lip be made with weld metal buildup?
 
 

Chaitanya Purohit

unread,
Aug 19, 2010, 3:42:24 AM8/19/10
to material...@googlegroups.com
UW 16 C (1)  states ;

Integral reinforcement is that reinforcement provided in the form of extended or thickened necks, thickened shell plates, forging type inserts, or weld buildup which is an integral part of the shell or nozzle wall and, where required, is attached by full penetration welds. See Fig. UW-16.1 sketches (a), (b), (c), (d), (e), (f-1), (f-2), (f-3), (f-4), (g), (x-1),  (y-1), and (z-1) for examples of nozzles with integral reinforcement where the F factor in UG-37(b) may be used.

I am not sure but this option with clarification with AI can be used.

To overcome the concern raised by Sunil,  PWHT or similar treatment can be carried out after build up and prior to making butt weld.

Thanks and Regards.
C. K. Purohit



On 19 August 2010 09:43, Bathula Raghuram (Mumbai - PIPING) <R.Ba...@ticb.com> wrote:
 
When a lip type joint is specified as per ASME Sec VIII div 1,   UW16.1 figure  f-4 (as below), can the lip be made with weld metal buildup?
 
 

--
To post to this group, send email to material...@googlegroups.com
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.



--

Picture (Enhanced Metafile) 1.jpg

george....@gr.bureauveritas.com

unread,
Aug 19, 2010, 3:54:15 AM8/19/10
to material...@googlegroups.com

On my opinion yes, but you have to consider the specific qualification requirements of the section IX for build-up (QW-202.3)

Dr. G. Dilintas - Authorized Inspector Supervisor
I&F Regional Technical Manager
Bureau Veritas Piraeus - Greece
Tel: +30 210 40 63 113/4
Fax: +30 210 40 63 118
Cell: +30 69 44 64 62 04
Inactive hide details for "Bathula Raghuram (Mumbai - PIPING)" <R.Bathula@ticb.com>"Bathula Raghuram (Mumbai - PIPING)" <R.Ba...@ticb.com>



    To

    "'material...@googlegroups.com'" <material...@googlegroups.com>

    cc


    Subject

    [MW:6580] Nozzle weld as per UW16.1 figure f-4 (weld metal build up)

    Ref



    When a lip type joint is specified as per ASME Sec VIII div 1, UW16.1 figure f-4 (as below), can the lip be made with weld metal buildup?



    Agrawal Sunil (Mumbai -Stequ)

    unread,
    Aug 19, 2010, 2:09:31 AM8/19/10
    to material...@googlegroups.com

    ASME VIII code does not provide such provision. Further, this type of joint is mainly provided for item in cyclic service (mainly by Licensor) to avoid the peak stresses at the nozzle to shell junction.

     

    If weld buildup is used,  that junction area is already having residual stresses, further the grain orientation which we obtain through the forged saddle type nozzle can not be achieved by weld buildup.

     

    In my opinion, it has to be forged construction only. Members may please further share their experience.

     

    Best Regards,

    Sunil Agrawal

    TICB/ +91 9820658733