    I have used 150mm of puff piece in the spool of 34'' pipe as per the drawing but my QA Dept. tells that in piping we can't use 150mm of puff piece and they have suggested me to use a minimum of puff piece of the OD of the pipe id i.e. a length of 850mm.

Please give me the section on which the puff piece details is  mentioned in the ASME section.

With Regards,

SANTOSH KUMAR NAYAK

kannayeram gnanapandithan

unread,
Feb 2, 2013, 4:10:18 AM2/2/13
to material...@googlegroups.com
Pl ref BSEN 12952-5/ 8.11.4----proximity of butt joints
Pandithan
Welding Consultant
> *SANTOSH KUMAR NAYAK*
>
> --
> To post to this group, send email to material...@googlegroups.com
> To unsubscribe from this group, send email to
> materials-weld...@googlegroups.com
> For more options, visit this group's bolg at
> http://materials-welding.blogspot.com/
> http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
>
> The views expressed/exchnaged in this group are members personel views and
> meant for educational purposes only, Users must take their own decisions
> w.r.t. applicable code/standard/contract documents.
> ---
> You received this message because you are subscribed to the Google Groups
> "Materials & Welding" group.
> To unsubscribe from this group and stop receiving emails from it, send an
> email to materials-weld...@googlegroups.com.
> For more options, visit https://groups.google.com/groups/opt_out.
>
>
>

Nandesh Kumar

unread,
Feb 2, 2013, 5:24:43 AM2/2/13
to material...@googlegroups.com
Your project specifications/construction codes  decide the length of pup piece.

ವಂದನೆಗಳೊಂದಿಗೆ / Best regards,

Nandesh Kumar A

Abu Dhabi, UAE

P.S. : Please don't print this e-mail unless you really need to.


--- On Sat, 2/2/13, Santosh Kumar Nayak <san2....@gmail.com> wrote:
--

Ammar Shaikh

unread,
Feb 4, 2013, 12:47:55 AM2/4/13
to material...@googlegroups.com
The thumb rule is min. OD of pipe of 1.5 times OD.
It is function of project specifications, however in some special cases you can weld peice of any considerable size but that is for limited specifications such as we did in our project in return line of slurry with gravity flow eith consent of our QC department.

kannayeram gnanapandithan

unread,
Feb 5, 2013, 6:19:06 AM2/5/13
to material...@googlegroups.com
See BSEN 12952-5 workmanship

On 2/4/13, Ammar Shaikh <ammar.al...@gmail.com> wrote:
> The thumb rule is min. OD of pipe of 1.5 times OD.
> It is function of project specifications, however in some special cases you
> can weld peice of any considerable size but that is for limited
> specifications such as we did in our project in return line of slurry with
> gravity flow eith consent of our QC department.
>
> On Sat, Feb 2, 2013 at 3:24 PM, Nandesh Kumar
> <nandes...@rocketmail.com>wrote:
>
>> Your project specifications/construction codes decide the length of
>> pup piece.
>>
>> ವಂದನೆಗಳೊಂದಿಗೆ / Best regards,
>>
>> *Nandesh Kumar* A
>>
>> Abu Dhabi, UAE
>>
>> P.S. : Please don't print this e-mail unless you really need to.
>>
>>
>> --- On *Sat, 2/2/13, Santosh Kumar Nayak <san2....@gmail.com>* wrote:
>>
>>
>> From: Santosh Kumar Nayak <san2....@gmail.com>
>> Subject: [MW:16669] Minimum Puff piece in piping
>> To: material...@googlegroups.com
>> Date: Saturday, 2 February, 2013, 7:35 AM
>>
>>
>> Dear Experts,
>>
>> I have used 150mm of puff piece in the spool of 34'' pipe as per the
>> drawing but my QA Dept. tells that in piping we can't use 150mm of puff
>> piece and they have suggested me to use a minimum of puff piece of the OD
>> of the pipe id i.e. a length of 850mm.
>>
>> Please give me the section on which the puff piece details is mentioned
>> in the ASME section.
>>
>> With Regards,
>>
>> *SANTOSH KUMAR NAYAK*

Ramin Kondori

unread,
Feb 5, 2013, 12:39:44 PM2/5/13
to material...@googlegroups.com
Dear Santosh:

Of course you should refer to your project specifications...
BUT
There is an option (providing your client has a good engineering sense)
If you pipe is not austenitic stainless steel or Ni-based, you may
carry out stress relieving heat treatment on any of the welds and you
will be OK.

The main reson for specifying a minimum value for proximity of the
welds is that when welds are close to each other, the residual stress
build up will jeopardize the integrity of that particular section of
the pipe. When you carry out PWHT, the trouble-maker will go home and
you are safe. of course the turbulence caused by weld penetration into
flow is another issue but not a major one.

Best of luck