In fabrication drawing, Tube to  tubesheet joint with 4mm projection.
in the Mock-up/PQR, vendor kept 0.5mm projection, but fused the tube with the tubesheet.

Is vendor to provide mock-up with 4mm projection, or change only the WPS to show 4mm projection in the joint, with the same PQR.

as per QW 288 this is not an essential variable, hence in my opinion revision of WPS is OK.

Sarfaraz Tambe

unread,
Apr 29, 2014, 12:58:52 PM4/29/14
to material...@googlegroups.com
No I don't think so Because as per QW 193.1 the mock up assembly shall essentially duplicate tube hole  configuration & Tube to Tube sheet joint design.As you are changing the projection means you are changing the strength of weld required as per design calculation.


--
To post to this group, send email to material...@googlegroups.com
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-weld...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.



--

george....@gr.bureauveritas.com

unread,
Apr 30, 2014, 4:10:16 AM4/30/14
to material...@googlegroups.com

I would like to draw your attention the the paragraph (b) of QW-288.1; " A change in the weld joint configuration (beyond the manufacturing tolerance)..."

    best regards

    Dr. Georgios Dilintas

    Authorized Nuclear Inspector
    Authorized Inspector Supervisor
    API 510 Inspector

    I&F REGIONAL TECHNICAL MANAGER
    BUREAU VERITAS HELLAS

    Tel: +30 210 40 63 113/4
    Fax: +30 210 40 63 118
    Cell: +30 69 44 64 62 04
    (See attached file: Dilintas_George.vcf)

Inactive hide details for Materials & Welding ---29/04/2014 15:57:50---In fabrication drawing, Tube to  tubesheet joint with 4mMaterials & Welding ---29/04/2014 15:57:50---In fabrication drawing, Tube to  tubesheet joint with 4mm projection. in the Mock-up/PQR, vendor kep

--

To post to this group, send email to material...@googlegroups.com
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
For more options, visit this group's bolg at


http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm

The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to
materials-weld...@googlegroups.com.
For more options, visit
https://groups.google.com/d/optout.

This message contains confidential information. To know more, please click on the following link: http://disclaimer.bureauveritas.com

Dilintas_George.vcf

Prakash Hegde

unread,
Apr 29, 2014, 9:43:33 PM4/29/14
to material...@googlegroups.com
Hi!
You require to qualify for each joint configuration separately