Considering the above reasons NDT is prefered after PWHT to make sure the weld quality
"RT before PWHT" would be an optional additional examination.
If you noticed repair after PWHT, then you need repair and re-PWHT required;to minimise/avoid this situation, NDT before PWHT is preferred.
And As per Shell DEP 30.10.60.18 , Clause 9.1 : NDE for acceptance shall be carried out after final PWHT.
So before coming to a conclusion please refer your project specifications and accordingly.