Re: [MW:16948] what is the procedure of welding between P91 to P8

333 views
Skip to first unread message

siva subramanian

unread,
Mar 5, 2013, 11:34:06 AM3/5/13
to material...@googlegroups.com

Dear Sir,
              P91 material is in P15E grouping.
So, we take it as P15E + P8 welding the condition are as follows,
For service temperatue up to 400 deg celcius, Use E 309-xx
For service temperatue up to 400 deg celcius upto 480 deg celcius , Use E NiCrFe-3
For service temperatue up to 480 deg celcius to upto 980 deg celcius , Use E NiCrFe-2
In case of welding of any P.NO to P8,Preheat shall be done only for that P.NO

The above mentioned information may useful to u Sir.

Thanks & Regards,
A.Sivasubramanian.

From: Joseph Martin <jdmar...@gmail.com>
To: material...@googlegroups.com
Sent: Tuesday, 5 March 2013 3:24 PM
Subject: [MW:16948] what is the procedure of welding between P91 to P8

Dear sir,

what is the procedure of welding between P91 to P8???

Thanks and Regards,
Martin
--
To post to this group, send email to material...@googlegroups.com
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-weld...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 




kannayeram gnanapandithan

unread,
Mar 8, 2013, 7:47:21 AM3/8/13
to material...@googlegroups.com
For all purpose use only nickel base Welding consumable( Not
ENiCrMo3),, Do not use SS welding filler wires/rods
Pandithan
Welding consultant

HAREESH K V

unread,
Mar 9, 2013, 3:14:15 AM3/9/13
to materials-welding
Please refer the recommended practice published by AWS D10 committee.

AWS D10.8-96, Recommended Practices for Welding of Chromium-Molybdenum Steel Piping and Tubing



On Sat, Mar 9, 2013 at 1:25 PM, HAREESH K V <haree...@gmail.com> wrote:
First buttering to be done on p91 side using ERNiCr3 using the heating procedures(Preheat+post heat+pwht) for p91. This buttering should be such that there should be 13mm of buttering (min) available after weld edge prepration of p91.


Then weld p91 with p8 with the same filler wire(ENiCr3) as normal SS welding. No heating required.


[the logic of 13mm buttering (min) is the haz area should be within the buttering limit when p91 is welded with p8]
 
----------------------
Hareesh K V
+91-9447625012




--
----------------------
Hareesh K V
+91-9447625012


HAREESH K V

unread,
Mar 9, 2013, 2:55:38 AM3/9/13
to materials-welding
First buttering to be done on p91 side using ERNiCr3 using the heating procedures(Preheat+post heat+pwht) for p91. This buttering should be such that there should be 13mm of buttering (min) available after weld edge prepration of p91.


Then weld p91 with p8 with the same filler wire(ENiCr3) as normal SS welding. No heating required.


[the logic of 13mm buttering (min) is the haz area should be within the buttering limit when p91 is welded with p8]
 
----------------------
Hareesh K V
+91-9447625012


On Fri, Mar 8, 2013 at 6:17 PM, kannayeram gnanapandithan <kgpan...@gmail.com> wrote: