Quoted below is the ASME Section VIII Div 1 requirement per UW 15 (b) (1):

(b) Strength calculations for nozzle attachment welds for pressure loading are not required for the following:

(1) Figure UW-16.1 sketches (a), (b), (c), (d), (e), (f-1), (f-2), (f-3), (f-4), (g), (x-1), (y-1), and (z-1), and all the sketches in Figs. UHT-18.1 and UHT-18.2;

In accordance with above almost all nozzle weld attachments  are excluded from strength calculations. This appears to be contradicting with UG-41 requirements.

Can anyone please clarify?


Regards,

Limesh

T. Rizal H.

unread,
May 3, 2011, 2:21:34 AM5/3/11
to material...@googlegroups.com
UW-15(b)(1) is taking about weld strength.
UG-41 is taking about reinforcement pad.
it is diferent.
General explanation: You calc reinforcement area use UG-41, then weld strength not required to be calc when your weld joint design of nozzle to shell as per UW-25(b)(1).
 
Thanks

--
To post to this group, send email to material...@googlegroups.com
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.



--
Regards,

T. Rizal Hidayat

george....@gr.bureauveritas.com

unread,
May 3, 2011, 3:18:37 AM5/3/11
to material...@googlegroups.com

Strength calculations are exempted as per UG 41(b)(3) which sends you to UW15 which again sends you to some figures of UW-16.1.
If you look closely those particular figures you will realize that we have full penetration welds. Because of that strength calculations are not required, just only calculations for the need or not of reinforcement.

best regards

Dr. Georgios Dilintas

Authorized Nuclear Inspector
Authorized Inspector Supervisor

I&F Regional Technical Manager
Bureau Veritas Piraeus - Greece
Tel: +30 210 40 63 113/4
Fax: +30 210 40 63 118
Cell: +30 69 44 64 62 04

Inactive hide details for limesh M <limesh78@gmail.com>limesh M <lime...@gmail.com>



To


cc


Subject

    [MW:10916] Interpretation of Clause UW 15 (b) (1) - ASME Section VIII Div 1.

Ref

--

To post to this group, send email to material...@googlegroups.com
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
For more options, visit this group's bolg at

Reply all
Reply to author
Forward
0 new messages