During pull out test in mock up of tube to tubesheet joints,
If it is broken from tube then it is acceptable or broken from weld is acceptable?
Depends on project requirements but normally not location of fracture but minimum pull out load is specified.
Met vriendelijke groeten / Best Regards,
Herman Pieper
QA-QC Inspector / CSWIP + IWI-C Welding Inspector / IWT / Materials Expert

Job van der Havestraat 6
8384 DB, Wilhelminaoord
Cell: +31 6 51691215
--
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-weld...@googlegroups.com.
To post to this group, send email to material...@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CA%2BEr1RfwRcTAHB9VpPihWo1vrcS_qd3LLPeOuqvrt17E-AGGgQ%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.
Generally pull out test is carried to check strength of tube to tube sheet weld joint. The weld joint shall not break at a load lesser than the specified.