Dear friends,
I want to prepare WPS & PQR for weld overlay of Monel inside the NB 6" nozzle (material SA 106 Gr B, length 8-10").
i have a query whether i have to prepare two different WPS ( for 1.nozzle pipe to flange & 2. weld overlay inside the nozzle)
What type of procedure i should follow?
Nozzle pipe is having Sch 80 thickness & thickness of weld overlay of monel is 5 mm.
What type of NDT i should do to check the integrity of weld overlay.
what type of special techniques required in the above mentioned job.
Thanks & regards
M P Singh
Inspection Engineer
Singh,
If the inside of the Joint is accessible then you may go for an Overlay WPS/PQR.
If clad portion is included in the Design calculation then PQR shall be Qualified in accordance with QW217(a) as a Butt Weld PQR.
If clad protion is not included in the Design Calculation and inside of the weld is accessible then, carbon steel portion can be supported using suitable Butt weld PQR and the Weld Overlay using an Overlay PQR inaccordance with QW217(b) and tested as per requirements of QW453.
NDT depends on Applicable Code and Thickness. If it is ASME Sec.VIII Div.I, then UCL-35 & UCL-36 is applicable
Normally the NDT for clad is Root PT(Liquid penetrant testing) and Final layer PT.
Thanks & Regards
-----------------------------------------------------------------
J.Gerald Jayakumar
Senior Engineer-Technology
Equipment Engineering (Materials & Welding)
Foster Wheeler India Pvt Ltd
Chennai Execution Centre
Landline : 0091-(44)-66769047
Mobile : 0091-9344954677
---------------------------------------------------------------
--
To post to this group, send email to material...@googlegroups.com
To unsubscribe from this group, send email to materials-weld...@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
i have a query whether i have to prepare two different WPS ( for 1.nozzle pipe to flange & 2. weld overlay inside the nozzle) --- You can use any existing butt welding procedure for butt welding and you have to make a seperate PQR for overlay.
What type of procedure i should follow? Arrange a plate for overlay PQR with the same thickness or lower as in production. Deposit required thickness of weld metal and carry out Penetrant test. Carry out 4 side bend and chemical analysis at minimum required depth from surface. Carry out hardness test and macro examination if necessery.
Nozzle pipe is having Sch 80 thickness & thickness of weld overlay of monel is 5 mm.
What type of NDT i should do to check the integrity of weld overlay. --- PT
what type of special techniques required in the above mentioned job. --- Take care when depositing first layer. Reduce current as low as possible at first layer. Ensure an overlap of 40 - 50 % on each bead. Take care the inter pass temperature up to 150 deg.C and distortion of plate. Keep away from carbon steel work location, because chips and powder from carbon steel will give wrong chemical result. Do not use carbon steel wire brush and grinding wheel.
Thanks & Regards
Muhammed Ibrahim PK
Dear friends,I want to prepare WPS & PQR for weld overlay of Monel inside the NB 6" nozzle (material SA 106 Gr B, length 8-10").
i have a query whether i have to prepare two different WPS ( for 1.nozzle pipe to flange & 2. weld overlay inside the nozzle) --- You can use any existing butt welding procedure for butt welding and you have to make a seperate PQR for overlay.
What type of procedure i should follow? Arrange a plate for overlay PQR with the same thickness or lower as in production. Deposit required thickness of weld metal and carry out Penetrant test. Carry out 4 side bend and chemical analysis at minimum required depth from surface. Carry out hardness test and macro examination if necessery.
Nozzle pipe is having Sch 80 thickness & thickness of weld overlay of monel is 5 mm.
What type of NDT i should do to check the integrity of weld overlay. --- PT
what type of special techniques required in the above mentioned job. --- Take care when depositing first layer. Reduce current as low as possible at first layer. Ensure an overlap of 40 - 50 % on each bead. Take care the inter pass temperature up to 150 deg.C and distortion of plate. Keep away from carbon steel work location, because chips and powder from carbon steel will give wrong chemical result. Do not use carbon steel wire brush and grinding wheel.
Thanks & regards
M P Singh