http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To post to this group, send email to materials-welding@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAFnzQg22xWSiTOEonpZtZCDqBZ9vvh9OGZ_bKvHJ9CrS1L-qSg%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.
Hi
Please adjust the pipe support location after approval by your piping design engineering and if not possible to adjust get concurrence from them for close out.
Regards
P Govindan
--
--
Hi
Please adjust the pipe support location after approval by your piping design engineering and if not possible to adjust get concurrence from them for close out.
Regards
P Govindan
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-weld...@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.