Thanks for another week of hacking.  The meeting minutes are at the following link and below:

2025-04-08 Meeting Minutes

Call to order: 20:40 by 


Attendees

  • The usual suspects

    • Brandon

    • Kevin

    • Richard

    • Hong

Past Events

  • Open Project Night (18:30, Fri 2025-04-04)

    • Brandon L. hosted.

    • Okky and Richard Showed Up

Upcoming Events

  • Open Project Night (18:30, Fri 2025-04-11)

    • Brandon is hosting

  • April Event Brainstorming

    • Welding class (Sat 2025-04-19 17:00)

      • Machines

        • Big Blue

        • Michael’s

        • Space MIG

        • Richard’s Flux Core

          • On loan on the pallet rack

      • Processes

        • Likely to leave machines on “recommended settings” and have the students figure out setting information later

        • Most likely to recommend the gasless processes unless somebody asks

          • Stick

          • Flux Core

        • Could run the gassy processes

          • Tig

          • Mig

      • Necessary Materials

        • Samples

          • Square Tubing / Round Tubing

          • Joints!

          • “X” Crucible

          • 3 suppliers near us:

            • IMS

            • Patton’s

            • Unicorn

        • Mig wire

          • 5lb spool, unspecified size

      • Host

        • Kevin is Hosting

  • Visiting the land of dancing unicorns event (Sat 2025-04-19 08:00)

    • Meet at MAG Lab

    • Drive to the Unicorn Metals

  • Open House Party (Sat 2025-04-12 18:00)

    • Kevin is Hosting

Section Lead Updates

  • Brandon L. (CTO)

    • Still working on the outdoor awning lights

      • Need to be wired

    • Water filter needs to be maintained

    • 3d printer fan replaced

    • Recalibrated Prusa XL toolheads

    • Bought new RFID keychains (might not break so often)

      • Now Offering “No Questions asked” Exchange of Blue “H” Mark keychains to new black RFID keychains 

  • Hong Q (Treasurer)

    • Need payment from one member

Discussion Items

  • Dolly wheel is still flat

    • Size is 4.10/3.50 - 4

  • Outdoor lightbulb needs replacement

    • We have three bulbs (inclusive).  We are on our second bulb.  We may consider going to an LED bulb once all HID bulbs are burnt out.

      • H I D 

      • H I D

      • H I D

    • Old bulb works… sometimes.

  • Paper towel dispenser in the electronics room

    • Ordered

  • Microfiber Towels

  • Quartermasters

    • Brandon

    • Daniel

  • Spring cleaning should be in the works

    • Upholstery cleaner at MAG Lab

    • To enforce the table clean-up and purg policy


Clarification of Bylaws

5.2 C: delinquent after 2 days of no payment 

5.1 D: after being delinquent for 5 days, membership is terminated


Motion to end: Richard, Brandon

Meeting ended: 21:14 by Kevin