Hi,
Looking at your inputs you are requesting 1149 q-points with a maximum q of 0.15 (1/A). When I use your PDB/DCD pair and the same maximum q but with a more reasonable number of q-points (say 21 to 31) the program runs to completion correctly. It could be that given the very large number of q-points that you have exceeded the capability of the program. The memory allocation is a function of the number of atoms, number of q-points, number of golden vectors, and number of frames and therefore for larger systems using a large number of q-points could be limiting.
Note from the SASSIE-web SasCalc documentation (see the provided link for a description of the information content in a SAS profile):
Cheers,
Joseph