Please use this thread to post questions regarding the
NIST-Waterloo-Pool-Fires. These cases include:
1. 30 cm Methanol Liquid Pool Fire [Waterloo
and NIST]
2. 30 cm Acetone Liquid Pool Fire [Waterloo and NIST]
3. 100 cm Methanol Liquid Pool Fire [NIST]
4. 37 cm Methane Gaseous Pool Fire (34
kW) [NIST]
5. 37 cm Propane Gaseous Pool Fire (50
kW) [NIST]
Further details regarding the test setup, experimental measurements recorded, and modeling targets of interest are available on the MaCFP Github Repo:
https://github.com/MaCFP/macfp-db/tree/master/Liquid_Pool_Fires/NIST_Pool_Fires
https://github.com/MaCFP/macfp-db/tree/master/Liquid_Pool_Fires/Waterloo_Methanol