tl;dr - £7000, are you interested? yes? then read on, no? then dr :-(
Update:
24:
walls and ceilings in 24L and 24R complete, only need their doors and woodwork painted black.
painted art from the windows needs scraping off in 24L and 24R
Walls around main door in 24 almost completed. Need key for payphone so it can be removed and then that wall filled and painted - if we can't get the key to open it then we could just paint around it and leave it in 24 when we leave.
Kitchen light needs looking at - since the PIR switch was removed there doesn't seem to be a way to turn it off so someone needs to look at the wiring.
Kitchen sink still needs to be fitted into the worktop outside 24L - worktop also needs fixing and supporting properly.
24/23 adjoining wall:
old workshop entrance now bricked up - needs some dressing before painting but it can't be painted properly until saturday to allow time for the mortar to dry properly.
Hole between quiet room and Biohackers lab still needs to be fixed.
23:
Toilet wall in biohackers lab complete.
Door frame almost completely constructed - still needs painting and door hanging. Glass above door is installed.
Toilet needs to be fixed, with cistern. Sink also needs to be fixed.
Old kitchen drain (from 24) needs to be capped.
23 R needs walls painting and all woodwork painted
23L needs walls painting and woodwork painted.
Wall by rear exit in 23 needs painting.
Wall around sink at rear of 23 needs some paint
Sink also needs some serious work to clean old paint etc - maybe some heavy duty paintstripper will be required.
Walls in 23 could do with some more white emulsion in places - particularly close to the floor and around the water and electricity meters.
I think that we could do with a number of people to work on finishing the painting if we are to stand a chance of getting our £7000 deposit returned.
- doors and door frames need preparing for painting and then painted
- walls still need white emulsion in places
if we can get a good number of volunteers in the next 2/3 days then we should be able to complete all the painting and be with a chance of making the landlord happy enough....