Meeting Purpose
Review and finalize the draft of the 2025 annual report.
Key Takeaways - The 2025 annual report draft was reviewed and
will be finalized by Jan 12, with specific sections assigned to
Ron (font/encoding) and Bill (credits). - The project has a new
intern, Kabir Gupta (U. of Alberta), who will revive the Richard
Gabriel benchmarks, providing valuable feedback for the primer.
- Recovery of Arun's tapes is stalled with George Blood, who is
unresponsive; the project cannot use the Internet Archive due to
unknown content rights. - Bill is developing a Google Vertex AI
pipeline to auto-generate reports from project data (GitHub,
email), aiming to create a shared repo.
Topics
Annual Report Review - Overview: The "Overview" section was
removed to start the report with 2025 activities. A link to the
project history will be added for context. - Community Outreach:
The "Lower Barriers" section was renamed "Community Outreach" to
better reflect its content. - Core System Work: - The
font/encoding work, framed as "interoperability," is also a core
system improvement. Ron will revise this section to cover both
aspects. - The "HTML module" wording was changed from
"completed" to "implemented" to reflect its alpha status and
unreleased nature. - The build script description was corrected
to focus on "better control of the load up process," not just
enabling historical applications. - Credits: The section will be
restructured by output (e.g., "Primer," "Bibliography") instead
of by person to avoid redundant listings. Bill will handle this
revision. - Looking Ahead: - Commitments were softened from "we
will" to "we intend to." - A new 2026 goal was added: update the
Interlisp Reference Manual (IRM) and Info files. - The sentence
about "building from revised sources" was moved to align with
learning resources.
Project Updates & Round Table - Arun's Tapes: Recovery is
stalled with George Blood, who is unresponsive. The tapes
require mechanical repair due to a design flaw. The project
cannot use the Internet Archive because content rights are
unknown. - Internship: Kabir Gupta (U. of Alberta) is the new
intern. - Task: Get the Richard Gabriel benchmarks running on
Medley. - Goal: Compare Medley's performance to original
D-machine results. - Side Benefit: Kabir's feedback will help
improve the primer for new users. - Individual Progress: - Nick:
Machine upgrade issues are blocking work. - Ron: Awaiting
testing/approval for the "hard copy" PR, which is blocking other
changes. - Herb: Integrating the HTML stream package with Ron's
new font architecture. - Bill: Developing an LLM-based system
(Google Vertex AI) to auto-generate reports from project data. -
Matt: Fixed bibliography JSON warnings; investigating
implementing SETUP-OF-VALUES, an unapproved ANSI CL standard
proposal. - Ryan: Testing the DOS port, which runs on MS-DOS and
DOSBoxX but crashes on FreeDOS. The VESA 102 flag causes screen
artifacts.
Next Steps - Paolo: - Finalize the annual report draft by Jan
12. - Announce the Jan 12 deadline to the team. - Ron: - Revise
the annual report's font/encoding section. - Send Herb the
display font rebuild code and font-complete function. - Bill: -
Restructure the annual report's "Credits" section. - Share the
Vertex AI repo once stable. - Herb: - Integrate the HTML stream
package with the new font architecture. - Share the ACM article
link on byte-coded VMs. - Matt: - Review Ron's T-edit
abbreviations work. - Ryan: - Prioritize containerizing the DOS
port over fixing VESA artifacts.
|
|
|
|
|
Action Items ✨ |
|
|
|
|
Meeting Purpose
Review and finalize the draft
of the 2025 annual report.
Key Takeaways
Topics
Annual Report Review
Project Updates & Round Table
Next Steps
|
|
|
|
|
|
|
|
|