TheCzechs first used ripple control in the 1950s. Early transmitters were low power, compared to modern systems, only 50 kilovolt-amps. They were rotating generators that fed a 1050 Hz signal into transformers attached to power distribution networks. Early receivers were electromechanical relays. Later, in the 1970s, transmitters with high-power semiconductors were used. These are more reliable because they have no moving parts. Modern Czech systems send a digital "telegram." Each telegram takes about thirty seconds to send. It has pulses about one second long. There are several formats, used in different districts.[5]
At the request of the Alabama Power Company, Paraskevakos developed a load-management system along with automatic meter-reading technology. In doing so, he utilized the ability of the system to monitor the speed of the watt power meter disc and, consequently, power consumption. This information, along with the time of day, gave the power company the ability to instruct individual meters to manage water heater and air conditioning consumption in order to prevent peaks in usage during the high consumption portions of the day. For this approach, Paraskevakos was awarded multiple patents.[7]
Since electrical energy is a form of energy that cannot be effectively stored in bulk, it must be generated, distributed, and consumed immediately. When the load on a system approaches the maximum generating capacity, network operators must either find additional supplies of energy or find ways to curtail the load, hence load management. If they are unsuccessful, the system will become unstable and blackouts can occur.
Long-term load management planning may begin by building sophisticated models to describe the physical properties of the distribution network (i.e. topology, capacity, and other characteristics of the lines), as well as the load behavior. The analysis may include scenarios that account for weather forecasts, the predicted impact of proposed load-shed commands, estimated time-to-repair for off-line equipment, and other factors.
The utilization of load management can help a power plant achieve a higher capacity factor, a measure of average capacity utilization. Capacity factor is a measure of the output of a power plant compared to the maximum output it could produce. Capacity factor is often defined as the ratio of average load to capacity or the ratio of average load to peak load in a period of time. A higher load factor is advantageous because a power plant may be less efficient at low load factors, a high load factor means fixed costs are spread over more kWh of output (resulting in a lower price per unit of electricity), and a higher load factor means greater total output. If the power load factor is affected by non-availability of fuel, maintenance shut-down, unplanned breakdown, or reduced demand (as consumption pattern fluctuate throughout the day), the generation has to be adjusted, since grid energy storage is often prohibitively expensive.
Smaller utilities that buy power instead of generating their own find that they can also benefit by installing a load control system. The penalties they must pay to the energy provider for peak usage can be significantly reduced. Many report that a load control system can pay for itself in a single season.
When the decision is made to curtail load, it is done so on the basis of system reliability. The utility in a sense "owns the switch" and sheds loads only when the stability or reliability of the electrical distribution system is threatened. The utility (being in the business of generating, transporting, and delivering electricity) will not disrupt their business process without due cause. Load management, when done properly, is non-invasive, and imposes no hardship on the consumer. The load should be shifted to off peak hours.
Demand response places the "on-off switch" in the hands of the consumer using devices such as a smart grid controlled load control switch. While many residential consumers pay a flat rate for electricity year-round, the utility's costs actually vary constantly, depending on demand, the distribution network, and composition of the company's electricity generation portfolio. In a free market, the wholesale price of energy varies widely throughout the day. Demand response programs such as those enabled by smart grids attempt to incentivize the consumer to limit usage based upon cost concerns. As costs rise during the day (as the system reaches peak capacity and more expensive peaking power plants are used), a free market economy should allow the price to rise. A corresponding drop in demand for the commodity should meet a fall in price. While this works for predictable shortages, many crises develop within seconds due to unforeseen equipment failures. They must be resolved in the same time-frame in order to avoid a power blackout. Many utilities who are interested in demand response have also expressed an interest in load control capability so that they might be able to operate the "on-off switch" before price updates could be published to the consumers.[8]
The application of load control technology continues to grow today with the sale of both radio frequency and powerline communication based systems. Certain types of smart meter systems can also serve as load control systems. Charge control systems can prevent the recharging of electric vehicles during peak hours. Vehicle-to-grid systems can return electricity from an electric vehicle's batteries to the utility, or they can throttle the recharging of the vehicle batteries to a slower rate.[9]
Early implementations of ripple control occurred during World War II in various parts of the world using a system that communicates over the electrical distribution system. Early systems used rotating generators attached to distribution networks through transformers. Ripple control systems are generally paired with a two- (or more) tiered pricing system, whereby electricity is more expensive during peak times (evenings) and cheaper during low-usage times (early morning).
Affected residential devices will vary by region, but may include residential electric hot-water heaters, air conditioners, pool pumps, or crop-irrigation pumps. In a distribution network outfitted with load control, these devices are outfitted with communicating controllers that can run a program that limits the duty cycle of the equipment under control. Consumers are usually rewarded for participating in the load control program by paying a reduced rate for energy. Proper load management by the utility allows them to practice load shedding to avoid rolling blackouts and reduce costs.
Ripple control can be unpopular because sometimes devices can fail to receive the signal to turn on comfort equipment, e.g. hot water heaters or baseboard electrical heaters. Modern electronic receivers are more reliable than old electromechanical systems. Also, some modern systems repeat the telegrams to turn on comfort devices. Also, by popular demand, many ripple control receivers have a switch to force comfort devices on.
Modern ripple controls send a digital telegram, from 30 to 180 seconds long. Originally these were received by electromechanical relays. Now they are often received by microprocessors. Many systems repeat telegrams to assure that comfort devices (e.g. water heaters) are turned on. Since the broadcast frequencies are in the range of human hearing, they often vibrate wires, filament light-bulbs or transformers in an audible way.[5]
The telegrams follow different standards in different areas. For example, in the Czech Republic, different districts use "ZPA II 32S", "ZPA II 64S" and Versacom. ZPA II 32S sends a 2.33 second on, a 2.99 second off, then 32 one-second pulses (either on or off), with an "off time" between each pulse of one second. ZPA II 64S has a much shorter off time, permitting 64 pulses to be sent, or skipped.[5]
Nearby regions use different frequencies or telegrams, to assure that telegrams operate only in the desired region. The transformers that attach local grids to interties intentionally do not have the equipment (bridging capacitors) to pass ripple control signals into long-distance power lines.[5]
Each data pulse of a telegram could double the number of commands, so that 32 pulses permit 2^32 distinct commands. However, in practice, particular pulses are linked to particular types of device or service. Some telegrams have unusual purposes. For example most ripple control systems have a telegram to set clocks in attached devices, e.g. to midnight.[5]
Greater loads physically slow the rotors of a grid's synchronized generators. This causes AC mains to have a slightly reduced frequency when a grid is heavily loaded. The reduced frequency is immediately sensible across the entire grid. Inexpensive local electronics can easily and precisely measure mains frequencies and turn off sheddable loads. In some cases, this feature is nearly free, e.g. if the controlling equipment (such as an electric power meter, or the thermostat in an air-conditioning system) already has a microcontroller. Most electronic electric power meters internally measure frequency, and require only demand control relays to turn off equipment. In other equipment, often the only needed extra equipment is a resistor divider to sense the mains cycle and a schmitt trigger (a small integrated circuit) so the microcontrollers' digital input can sense a reliable fast digital edge. A schmitt trigger is already standard equipment on many microcontrollers.
The main advantage over ripple control is greater customer convenience: Unreceived ripple control telegrams can cause a water heater to remain off, causing a cold shower. Or, they can cause an airconditioner to remain off, resulting in a sweltering home. In contrast, as the grid recovers, its frequency naturally rises to normal, so frequency-controlled load control automatically enables water heaters, air-conditioners and other comfort equipment. The cost of equipment can be less, and there are no concerns about overlapping or unreached ripple control regions, mis-received codes, transmitter power, etc.