Fred...This is from a major manufacturer of power plants..... do not see how this squares with your assumption that CCGT will soon be 70% LCV?
Dave
Subject: Re: costs
Dear David
this June we have published a paper at the PowerGen Europe regarding a cost assessment of CCS for fossil power generation.
This public paper also includes the data we have used for this study, that might also be interesting for you.
Table 2 contains key performance and EPC cost data:
For clarification:
In Europe with a 1-on-1 Single-shaft configuration (a plant with one GT and one ST) and direct cooling we have assumed the following:
2015 2020 2030
Net Output MWe net 600 650 700
Net Efficiency % 61% 62% 63%
EPC cost Euro/kW net 580 565 550
I hope this helps you for your assessment.
kind regards,
Christian