Hi Amy, if you have the bandwidth, this is a smart strategy. The two 'early' sections, Inventory & Analysis and Planning & Design, have a lot of overlap. Similarly, the two 'late' sections, Construction Documentation and Grading/Drainage/Stormwater, also have some overlap (though maybe not as much since GDSW is so focused on technical skill).