Agreed that the back corner was far from ideal. Aside from the bench
seating, which was usurped by the parts depot anyways.
Also agreed anyone on the repair team should furnish their own basic
tools. Screwdrivers, needle nose, flashlight, first aid kit, ammo
bandolier, etc. I'll bring my Milwaukee cordless drill, woe to the
soul that tries to make off with that. I think Ross brought a
portable air blower (geek hair dryer?) of some sort last year, but it
kept blowing the circuit, so we'll want to stay away from those.
I'm hoping we can scavenge those !@#$@#% Dell green drive slides from
RAMBUS equipped and other problematic Dell machines that come in.
Supplies I can bring:
Small 120V compressor (given power and outside space)
Canned air (agree it blows, har har, but can be used inside)
A few DVI to VGA converters
Screws of various sorts
Also suggest we source:
PC case card slot covers (blanks) - helps keep dust OUT of the
machines
Good feedback folks.