The Walkshop report was not in response to the Greenways walk Darcy led.
The Walkshop report is in response to an SDOT-organized walk on
September 16th, 2025. People in North Cedar Park, between NE 125th and
NE 145th were notified of that walk, plus a survey was sent around later
if you weren't able to attend the Walksop lead by SDOT.
I agree sidewalks are not the best solution to problems on 35th Ave NE
between NE 135th and NE 145t streets.
We need to ALWAYS speak as a neighborhood. When the first Greenway was
put in on 37th Ave NE, Janine Blaloch and the whole North Cedar Park
group worked TOGETHER. There were changes made to the whole neighborhood
becasue changing things on one street, influences traffic on the other
streets in a neighborhood.
We have a stronger voice when we work together.
One group saying one thing and another group in the same neighborhood
saying something else, make it very difficult for the city to made the
best decisions.
Remember, the Walkshop report is a draft.
> --
> You received this message because you are subscribed to the Google
> Groups "Lake City Greenways" group.
> To unsubscribe from this group and stop receiving emails from it, send
> an email to
LakeCityGreenw...@googlegroups.com.
> To view this discussion visit
>
https://groups.google.com/d/msgid/LakeCityGreenways/d840ba45-b0c0-46f7-891f-bd65db14c6c4n%40googlegroups.com
> [1].
>
>
> Links:
> ------
> [1]
>
https://groups.google.com/d/msgid/LakeCityGreenways/d840ba45-b0c0-46f7-891f-bd65db14c6c4n%40googlegroups.com?utm_medium=email&utm_source=footer