Please look into the regulations for Project Work and Practice School Regulations as applicable from 2014-16 MTech batch onwards.


The summary can be seen below:


M.TECH PROJECT/PRACTICE SCHOOL GUIDELINES

Applicable from 2014-16 admitted batch onwards

The Guidelines are intended to give both PG students and supervisor at the K L University with a set of procedures and expectations that will make the Practice School, project work and evaluation process easier, more predictable, and more successful. These Guidelines should be interpreted as the minimum requirements for M.Tech degree to be awarded by K L University.

 

M.Tech students are required to culminate their learning by applying the acquired knowledge and analytical skills to any real world problem either by show casing a piece of academic research through a project or by analysing and practicing a live industrial problem or a combination of them in appropriate proportions. These guidelines provide a set of procedures and expectations to accomplish it either through practice school or project work in either semesters or in any one of the semesters as per the table-1 given below.

 

Choice

Semester III

Semester IV

Option

Refer Annexure

Option

Refer Annexure

1

Practice School

I

Practice School

I

Project work

II

Project work

II

2

Practice School

I

Project work

II

3

Project work

II

Practice School

I

 

Table 1: Choice Based Project Work

  1. Evaluation weightage for Project work/Practice School:

Semester

Choice

Marks

Reference Table Number for  Evaluation

III-Semester

Project

In-Semester

 

50

 

Table-3

Practice School

Table-4

IV-Semester

Project

In-Semester

 

50

 

Table-3

Practice School

Table-4

 **End Evaluation  (Project / Practice School)

100

*Table-5/Table-6/Table-7

Total :

200

Table: 2-Evaluation Weightage for Project Work/Practice School

* Note: Refer Option Table for Different Case

**Note: End Evaluation will be done at the end of Semester-IV for 100 Marks

 

 

Option Table for Project Work/Practice School in Semester III & IV

 Choice

Semester III

Semester IV

Refer Annexure

Option

Option

Case-1

Practice School

Practice School

Table-4 & Table-6

Project work

Project work

Table-5

Case-2

Practice School

Project work

Table-7

Case-3

Project work

Practice School

Table-7

 

  1. In-Semester Evaluation  

Project Work during In-semester evaluation either in Semester-III or/and Semester-IV shall be assessed for 50 marks as per the table-3 given below.

Component

Evaluator

Distribution

Marks

First Review

Department Committee

(3 Review Members)

5 Marks Each

15

20

Guide

5

Second Review

Department Committee

(3 Review Members)

5 Marks Each

15

20

Guide

5

Attendance

Bio-Metric

5

5

Report

 

5

5

Total

50

Table: 3. In Semester Evaluation weightage for project work

Similarly, Practice School during In-semester evaluation either in Semester-III or/and Semester-IV shall be assessed for 50 marks as per the table-4 given below

Component

Evaluator

Distribution

Marks

First Review

(Fortnightly Progress Reports)

Company Guide

10

10

Operational Guide

5

5

University Guide (Faculty)

10

10

Second Review

(Interim Evaluation)

Department Evaluator

a)      Report

b)      Presentation

 

10

10

 

20

Attendance (Fortnightly basis duly signed by CG & OG)

Company & Operational Guide

5

5

Marks

50


















Table: 4. In Semester Evaluation weightage for Practice School


 

  1. End Evaluation

The completed project work/Practice school (Refer: Case-1,Case-2 and Case-3 )shall be assessed for a maximum of 100 marks at the IV semester for Project End Evaluation.

Case-1: Project Work opted in both Semester III and IV

Component

Evaluator

Distribution

Marks

Paper Publication

Department Committee and Guide

20

20

Report

Department Guide

20

20

Viva-Voice

External Examiner

30

30

Presentation

External Examiner

30

30

Total

100

Table: 5. End Evaluation weightage for Project Work

 

Case-1: Practice School opted in both Semester III and IV

Component

Evaluator

Distribution

Marks

Paper Publication

Department Committee and Guide

20

20

Report

Company Guide

20+20*

40

Viva-Voice

External Examiner

20

20

Presentation

External Examiner

20

20

Total

100

 











Table: 6. End Evaluation weightage for Practice School

*Note:  Company Guide will allot 20 Marks in Each Semester

 

 

Case-2 & Case-3: Practice School opted in Semester III & Project work opted in Semester-IV and Project Work opted in Semester III & Practice School opted in Semester IV

Component

Project Work

Practice School

Marks

 

Evaluator

Distribution

Evaluator

Distribution

Paper Publication

Department Committee and Guide

20

Department Committee and Guide

20

20

Report

Department Guide

20

Company Guide

20

20

Viva-Voice

External Examiner

30

External Examiner

30

30

Presentation

External Examiner

30

External Examiner

30

30

Total

100

 

Table: 7. End Evaluation weightage for Project Work and Practice School


Refer to the full document for more clarity and inputs.


SCOPUS INDEXED PAPER PUBLICATION IS MANDATORY for all students to consider for the END SEMESTER EVALUATION.


Regards


P SAVE PAPER SAVE TREES - Please do not print this e-mail unless absolutely necessary
--
******************************************************************************
Dr. K. SARAT KUMAR  M.Tech.,  Ph.D 
FSES, Senior Member IEEE, AMIE, MIAE, MISI, MISTE, MISCA, C.Eng(I)
DIRECTOR - Engineering (PG),
Professor of ECE, 
(DST -FIST Sponsored Department)
K L University
(Koneru Lakshmaiah Education Foundation)
Green Fields, Vaddeswaram 522502.
Guntur Dt., Andhra Pradesh, INDIA.  

Office: +91-863-2399999  (Ext 1617),  Fax: +91-863-2388999
http://www.kluniversity.in               kks...@gmail.com        
Regulations-ProjectWork-PracticeSchool.rar
Reply all
Reply to author
Forward
0 new messages