Civil works will start in our premises from tomorrow(01-June) to prevent water logging during heavy rains. Kindly note that from Wednesday(3rd June) morning, movement of vehicles into the premises needs to be stopped for 4 days, as ramp work would be in progress at the gate. Water will be supplied by the tanker from outside the gate.
Works will be done in the following order:
1) De-silting of rain water drain and increasing height of the drain-wall starting near store-room section to the gate.
2) Increasing the height of the apartment entry point above road level to stop road-water entering the premises.
3) Rejuvenation of the four rainwater harvesting pits (10 ft x 4 ft) on the transformer side driveway through re-digging and cleaning.
Request parents to avoid sending kids for cycling/playing in ground floor as there will be workers moving with their equipment.
Special note of thanks to R.B.Reddy and Kannan for your inputs and guidance on this matter.