Folks,
This upcoming weekend is the last weekend before pratistha as you know. Attached file has list of most of the pending tasks. From that list I’ve prepared following items that we should be able to take care of this weekend, we plan to meet both Friday 4/22 and Saturday 4/23.
Friday 4/23 – 3.00 PM to 7.00 PM
We don’t expect most people to be able to come on Friday, but it is day off for some folks and we do have practice for the culture programs in the evening. So swing by if you can, if not, plan for Saturday.
Saturday 4/24 – 10.00 AM to 3.00 PM
This is going to be our usual Saturday gathering.
Stuff We Need
1. If you have Power tool kit (Drill, Screwdriver set etc.) please bring it (and once done remember to take it back).
2. One of our bookcase broke during the move, so lot of books are still in boxes and I’d like to arrange them neatly. If someone has decent, nice book case AND if you can bring it this weekend please let us know. If not, we will get a new one.
3. Need volunteer for food for Saturday, or shall we plan on potluck?
Task No. |
Tasks |
Owner |
Target Date |
Comment |
|
1 |
Remove all un-needed material / Return to Home Depot |
JC / Dipak |
4/1/11 |
Mostly done, just check the office area for final sweep |
|
2 |
Audio installation & testing |
Dipak / Niren / Parind |
4/8/11 |
Dependent on Sunil/Ashish but like to finish this off Niren to test for Audio Truck for the procession Have old audio system as stand by |
|
3 |
Video installation & testing for Live Video in Dining Hall |
Dipak / Niren / Parind |
Testing is planned this weekend. | |
|
4 |
Pickup Additional Decoration Supply from Anshumanbhai |
Parind/Dipak/Niren |
4/23/11 |
Parind working with Anshumanbhai to finalize pick up time |
|
5 |
Bring Window Treatments for Derasar Area and install |
Lopa |
4/15/11 |
Installed in some, waiting for derasar & bathrooms |
|
6 |
Landscaping / External Plants – Front & Back |
Lopa / JC / Pushpaben |
4/15/11 | |
|
7 |
More Coat Hangers, Fix Loose & Extra Shoe Racks |
Dipak + Lopa |
4/15/11 |
Fix some minor install issues |
|
8 |
Additional Decoration & Clean up |
Decoration Team + other volunteers |
4/15/11 |
We expect to get additional supplies from India & Anshumanbhai, we will try to go thru those items. |
|
9 |
Assemble Chairs |
Dipak |
4/15/11 |
We may need some power equipment |
|
10 |
Building Signs - Intenal & External |
Ushir / Sanjay |
4/15/11 | |
|
11 |
Bathroom - Non-Slippary Floor Mat |
Ajaybhai |
4/15/11 | |
|
12 |
Get Kesar Stone ready for usage |
Parind + Ajaybhai |
4/15/11 |
We need to soak it for a day & dry run |
|
13 |
Get bigger street number sign (Just 223) on the building |
Ushir + Parind |
4/15/11 |
Dipak to get bigger numbers made |
|
14 |
Have the main outside sign done |
Girishbhai ? |
4/15/11 |
We need to follow up with Girishbhai |
|
15 |
Have the last picture frame installed |
Ajaybhai + Parind |
4/15/11 |
Last one to be hanged this week |
|
16 |
Get Carpets from next door neighbor if ready |
Parind + Dipak + Ajaybhai |
4/15/11 |
Order Placed |
|
17 |
Install Water purifier & water fountain in the kitchen |
JC / Ajaybhai |
4/15/11 |
Ordered, JC to get it installed with Andrew |
|
18 |
Install dark film on glass window & door surfaces |
Lopa + JC |
4/15/11 |
The door behind gabhara is missing the film |
|
19 |
Remove old broken blinds from doors |
JC |
The door behind gabhara still has those | |
|
20 |
Purchase necessary cleaning equipment / chemicals |
Alpaben + Ajaybhai |
4/15/11 |
Washing detergent missing |
|
21 |
Kitchen - Some drawers are not easily sliding in/out |
Lopa |
4/20/11 |
Some of them are not operating easily |
|
22 |
Fire Proof Curtain for Gabharo |
Ajaybhai + Team |
4/20/11 | |
|
23 |
Build Left side Cleaning - Make a walk-way |
Dipak |
4/24/11 |
Thinking about cobble stones |
|
24 |
Have Donners List installed |
Girishbhai + Ajaybhai + Parind |
4/24/11 |
Girishbhai to prepare, building committee to install |
|
25 |
Curtain or notice board type separator in front of main derasar entrance |
Ajaybhai + JC |
4/24/11 | |
|
26 |
Get Dig Safe markup and verification done for tent |
Jayesh + Dipak |
4/30/11 |
Ordered, Dipak to see it thru |
|
27 |
Get line formation poles & ropes (~60 Ft) |
Niren / Dipak |
4/30/11 |
Niren to supply decorative items |
|
28 |
Purchase TV / Portable Stand etc… |
Parind / Dipak / Niren |
4/23/11 |
Dipak to bring one on Friday, Niren to order stand |
|
29 |
Get Projector Screen Installed |
Ajaybhai |
4/30/11 |
Ordered |
|
30 |
Install First Aid Kit at proper location |
Ajaybhai |
4/23/2011 |
Vijaybhai said he has one but we need to have multiple kits |
|
31 |
Cultural program audio CD test run |
Hemant / Ushir | ||
|
32 |
Post Internal Signs for (Program schedule, Do & Don'ts, coat, shoes, no food etc) |
Ushir / Snajay | ||
|
33 |
Post External Signs (Parking lots, Building number, Name) |
Ushir / Snajay | ||
|
34 |
Finalize Videographers & Photographers |
Jayesh / Niren | ||
|
35 |
Whole site safety inspection & enforcement |
Ajaybhai | ||
|
36 |
Confirm Hired help / Handy man during the pratistha |
Ajaybhai / JC |
Do we need this? | |
|
37 |
Prepare Volunteer List for Daily activities |
Parind |
Need volunteer signup sheets we have so far to finalize this | |
|
38 |
Session for information booth volunteers |
Parind | ||
|
39 |
Make sure members have access to the building |
Ajaybhai/Jayesh/JC | ||
|
40 |
Ensure locking of key areas & safety |
Ajaybhai/Jayesh/JC | ||
|
41 |
Plan for Float Decorations |
Parind |
|
|
|
42 |
Plan for Truck & Trailer pickup & drop-off |
Parind/Ushir/Amit |
|
|
|
43 |
Fix or Return some vacuum cleaners |
JC |
|
|
|
44 |
Empty Bhandars |
Vijaybhai |
|
In preparation for Pratistha ! |
|
45 |
Decorative Mirror for Chandlo |
Lopa |
|
|
|
46 |
Silky table cloth for 18 Abhishek Tables |
Dipak |
|
|
|
47 |
Duplicate keys for audio storage doors |
??? |
|
If you have one and are going to Home Depot, can you make one? |
|
48 |
Finalize Storage Shed and set it up |
Ajaybhai / JC |
|
|
|
49 |
Setup trash locations and pickup policies / duties |
Vipin / JC / Ajaybhai |
|
We had a mess last weekend after everyone left, let’s make sure this does not happen again |
|
50 |
Test Shower for Hot Water |
Ajaybhai |
|
|
I know there are more items but I’ll stop now.
From: Parind Shah [mailto:par...@hotmail.com]
Sent: Tuesday, April 19, 2011 2:57 AM
To: ma...@googlegroups.com
Subject: Remaining Tasks for Pratistha
Folks,
We are less than two weeks away from the beginning of our pratistha ceremony. We as a team has achieved a lot but a lot still needs to be done before we are thru.
We have great momentum, energy and participation on all fronts. You can’t ask for a better team!
What keeps me up at night past 2 AM these days is what do we still have left to do, so I have tried to compile a master task list of all different departments to gauge where we are and what tasks are still pending. At this point it is almost impossible for anyone of us to compile such a list with 100% accuracy as we don’t have full visibility in to what everyone else is doing but it is critical that we have such a list to avoid any surprises.
It would be great if you can,
1) Provide status on tasks you own, try to finish them ASAP.
2) Let me know of any missing tasks you are working on
3) Let me know about any discrepancies you find so we can fix them.
Notes:
1) If you see multiple people on the owner’s list, first one is responsible for coordinating between them and finishing the task.
2) Avoid doing Reply All when possible to minimize email storms, we plan to roll in all updates in next revision.
3) Every day is now important, we can’t go from weekend to weekend.
Parind.