- Project A builds at the top of the hour.
- Project B needs to build 20 minutes later but only if the build in Project A passes.
Might be an use case for workflow, the advantage being also that it should let you avoid having a slave locked just to sleep.
I think that if you set a sleep outside a node block in a workflow script you should get that.
Cheers
--