sync perforce workspace

11 views
Skip to first unread message

Shurik

unread,
Mar 6, 2016, 12:21:27 AM3/6/16
to Jenkins Users
Hi,

I have maven incremental job with SCM ( perforce ).

The incremental option check the SCM changes and based on it choose which maven module to run.

Sometimes I need to manually sync the perforce workspace in order to skip the maven module build.

But when I do it in correct perforce workspace and trigger the job jenkins still see that my manually sync as job changes.

How I can do it?

Thanks
Reply all
Reply to author
Forward
0 new messages