I would like to simulate changeover time / set-up time on a production line. I have considered using Downtime, but as far as I know, it can only be activated via fix interval or with the help of a probability distribution object.
Can Downtime be activated based on number of products processed by a server, or based on the value of a boolean indicator?
Is there any other way to simulate changeover/set-up time (e.g. TimeSeries, EntityGate, etc.)?
Thanks in advance,
B B
P.S. Under "changeover time / set-up time" I mean the time needed to change a machine in the production line to be able to produce a different product.