Attached is copy of 2009 Bid from Western Engineering  for the Total $652,662  in sept of 2009  which was compared by  Ilyas.  Western bid was not the lowest Theis engineering and A C General was lower than Western ,  I think Riaz Bahi may still have those other bids.
 
Our curent bid is for  $654,226.17  which is  for half the parking lot  and price is almost same as what it was  2 years ago.
 
I thought it is cheaper to build now ? 
 
 
     Fareed siddiqui

--- On Thu, 11/11/10, FAREED T. SIDDIQUI,P.E. <stukamco...@aol.com> wrote:

From: FAREED T. SIDDIQUI,P.E. <stukamco...@aol.com>
Subject: Fwd: Bid Compare
To: fareed....@sbcglobal.net
Date: Thursday, November 11, 2010, 10:57 PM



Fareed T. Siddiqui, P.E
STUKAM Consulting Engineer's Inc
8999 GREENBACK LANE
ORANGEVALE  CA 95672
FAX :(916) 988-6316     Cell:(916) 835-5791 



-----Original Message-----
From: John Haskell <JHas...@westeng.com>
To: FAREED T. SIDDIQUI,P.E. <stukamco...@aol.com>
Sent: Tue, Sep 9, 2008 12:12 pm
Subject: RE: Bid Compare

Fareed;
 
Here is your breakdown:
 
·        Demolition $10,000
·        Grading $80,000 (subgrade, curb grade, base; we have not included any rough grading)
·        Sewer $45,000
·        Storm $135,000 (includes $25,000 allowance for interceptor)
·        Water $ 155,000
·        Pave $143,000 (includes off-site lane transition/patch)
·        Concrete $0 (We have not included any concrete work) may be around  $ 70,000
·        Misc $14,662
·        Materials – Included above in line items.
 
·        Total $582,662
if you include concrete  $ 652,652
 
 
Please note that this breakdown is provided solely for the purpose of providing an accounting of the project and is not intended to serve as a shopping list from which elements of the project can be selected for the issuance of a contract. This is not to say that we would not consider performing segments of the work but such an arrangement could change the breakdown. If you have any questions please let me know, thanks.
 
 
John Haskell
Vice President
Western Engineering Contractors, Inc.
3171 Rippey Road
Loomis, CA 95650
 

From: FAREED T. SIDDIQUI,P.E. [mailto:stukamco...@aol.com]
Sent: Monday, September 08, 2008 4:29 PM
To: John Haskell
Subject: Bid Compare
 



----- 
501 Levy Road  Bid Compare
 I
 II
  III
  IV
 
 
 
 
 
Item/Contractor
Contractor !
Western
Column1
Column2
Demolition
  $ 11,551.02
 
 
Grading
 $ 145,140.60
 
 
 
Sewer Plumb
 $  16,961.43
 
 
Strom Drain Plumb
 $  67,697.73
 $
 
 
Water Plumb
 $  75,008.68
 $
 
 
Offsite Pave
 $  17,669.60
 $
 
 
onsite pave
 $ 110,999.08
 $
 
 
 concrete
 $ 168,000.00
 $
 
 
Misc
 $     8,736.00
 $
 
 
Materials
 $127,623.90   
 
 
 
 
 
 
 
 
 
 
 
 
 
Total
  $ 749,623.90
 $ 652,662    
 
 
 
 
 

Looking for spoilers and reviews on the new TV season? Get AOL's ultimate guide to fall TV.
2008 BID COMPARISON BY ILYAS.pdf
Current Bid.pdf

isf...@yahoo.com

unread,
Nov 12, 2010, 8:57:51 AM11/12/10
to isfm...@googlegroups.com, isfm...@googlegroups.com
Jzkk br Fareed

Looks like this contractor has not included the concrete and slab. We need a clarification from br Mazhar to make sure we are doing apple to apple. No problem. Will talk to Br Mazhar.

Riaz
Sent from my iPhone
--
You received this message because you are subscribed to the Google
Groups "isfmasjid" group.
This is not an official ISF group. Items posted here are the opinions of the individual posting the email and not an ISF endorsement or announcement.
<2008 BID COMPARISON BY ILYAS.pdf>
<Current Bid.pdf>

Abdul Hadi G.Pasha

unread,
Nov 12, 2010, 9:49:23 AM11/12/10
to isfm...@googlegroups.com
Is his name Mazhar or Manzar? I am bit confused, please clarify. JZKK
 

Date: Fri, 12 Nov 2010 05:57:51 -0800
From: isf...@yahoo.com
Subject: Re: [isfmasjid:184] Fwd: Bid Compare
To: isfm...@googlegroups.com
CC: isfm...@googlegroups.com

isf...@yahoo.com

unread,
Nov 12, 2010, 9:51:05 AM11/12/10
to isfm...@googlegroups.com, isfm...@googlegroups.com
Sorry, forgot to mention in my last email. Br Mazhar is one of the contractors. Like I mentioned in one of the meetings before I am getting bids from three more. We need to do a thorough job in comparisons. Br mazhar's one bid that kind of gives an idea about the cost. Others may fluctuate around it but should not be too much. We wll find out IA.

Riaz siddique

unread,
Nov 12, 2010, 12:21:08 PM11/12/10
to isfm...@googlegroups.com
Good catch. His correct  name is Manzar Qayyum.


From: Abdul Hadi G.Pasha <ahp...@hotmail.com>
To: isfm...@googlegroups.com
Sent: Fri, November 12, 2010 6:49:23 AM
Subject: RE: [isfmasjid:185] Fwd: Bid Compare

Fareed Siddiqui

unread,
Nov 12, 2010, 7:04:28 PM11/12/10
to isfm...@googlegroups.com
Riaz Bahi,  
 
Do you have copies of  Theis & AC General Bids
 
Fareed siddiqui


Subject: Re: [isfmasjid:184] Fwd: Bid Compare

Riaz siddique

unread,
Nov 13, 2010, 9:30:20 PM11/13/10
to isfm...@googlegroups.com
AA Fareed Bhai

I and Br Manzar reviewed the items (deleted the price) on Western Eng's bid.  Br Manzar is more than happy to sit with you and go over the items line by line. But he mentioned that Western Eng has not included any concrete work,   including the foundation slab, the curb gutter on site and off site. In his opinion this alone costs about $150 to $200K. that would bring western's bid to $800K to 850K. Br Manzar's bid is around $650K. We can further clarify this.

Anyway, my humble request is that we discuss the numbers and items etc in person and clarify. This will be efficient and productive. I am also preparing a bid comparison table item by item. We can sit down and review the items to make sure we are not missing anything and then plug in the numbers($$). this will give a very clear and accurate comparison of costs.

Allahu Alam.
Riaz


From: Fareed Siddiqui <fareed....@sbcglobal.net>
To: isfm...@googlegroups.com
Sent: Thu, November 11, 2010 11:46:26 PM
Subject: [isfmasjid:0] Fwd: Bid Compare
--

Fareed Siddiqui

unread,
Nov 14, 2010, 5:08:29 AM11/14/10
to isfm...@googlegroups.com
ASA, Riaz Bahi,
 
 

I think you are correct Western bid did not include Concrete Pad for building. However concrete work was included as an option for $70,000 see Western Bid below.  Eric's Bid of $ 749,623.90 did include all concrete work for $168,000.  

 

One important point, all the previous bids were for entire parking not partial parking.  According to Manzer in his presentation we will be saving $250,000 by using recycled crushed asphalt as a base and not paving the remainder parking lot.  If we add 250,000 to his bid of $654,226.17 that would bring Manzer's Bid to $904,226.17   

 

Manzar's estimate needs to be very clear. He needs to review his bid and carefully review the entire plan. Once he has time to review all the plans give us a complete proposal.  Some of the items in his bid are counted twice. (E.g. Item # 5 is also listed in Item # 4).  He need to be very clear in his item of work they need to be itemized separately for each item see sample attached. 

 

I think he  need to give us complete bid and include everything as shown on the plans. We should decide what to remove from the bid. This will give us the exact cost or saving of items we will be excluding at this time. 

 

It is very hard to decide when he says in his opinion it cost around 150,000 to 200,000 there is big $50,000 difference. Or we will be saving 250,000 in paving that is why it is important to get a complete bid. 

 

 Bottom line we need to real cost of each item 

      
Fareed siddiqui



From: Riaz siddique <isf...@yahoo.com>
To: isfm...@googlegroups.com
Sent: Sat, November 13, 2010 6:30:20 PM
Subject: Re: [isfmasjid:189] Fwd: Bid Compare

AA Fareed Bhai

I and Br Manzar reviewed the items (deleted the price) on Western Eng's bid.  Br Manzar is more than happy to sit with you and go over the items line by line. But he mentioned that Western Eng has not included any concrete work,   including the foundation slab, the curb gutter on site and off site. In his opinion this alone costs about $150 to $200K. that would bring western's bid to $800K to 850K. Br Manzar's bid is around $650K. We can further clarify this.

Anyway, my humble request is that we discuss the numbers and items etc in person and clarify. This will be efficient and productive. I am also preparing a bid comparison table item by item. We can sit down and review the items to make sure we are not missing anything and then plug in the numbers($$). this will give a very clear and accurate comparison of costs.

Allahu Alam.
Riaz

From: Fareed Siddiqui <fareed....@sbcglobal.net>
To: isfm...@googlegroups.com
Sent: Thu, November 11, 2010 11:46:26 PM
Subject: [isfmasjid:0] Fwd: Bid Compare

Attached is copy of 2009 Bid from Western Engineering  for the Total $652,662  in sept of 2009  which was compared by  Ilyas.  Western bid was not the lowest Theis engineering and A C General was lower than Western ,  I think Riaz Bahi may still have those other bids.
 
Our curent bid is for  $654,226.17  which is  for half the parking lot  and price is almost same as what it was  2 years ago.
 
I thought it is cheaper to build now ? 
 
 
     Fareed siddiqui

--- On Thu, 11/11/10, FAREED T. SIDDIQUI,P.E. <stukamco...@aol.com> wrote:

From: FAREED T. SIDDIQUI,P.E. <stukamco...@aol.com>
Subject: Fwd: Bid Compare
To: fareed....@sbcglobal.net
Date: Thursday, November 11, 2010, 10:57 PM

Fareed T. Siddiqui, P.E
STUKAM Consulting Engineer's Inc
8999 GREENBACK LANE
ORANGEVALE  CA 95672
FAX :(916) 988-6316     Cell:(916) 835-5791 
SAMPLE ESTIMATE FOR SITE WORK.pdf

isf...@yahoo.com

unread,
Nov 14, 2010, 9:39:51 PM11/14/10
to isfm...@googlegroups.com, isfm...@googlegroups.com
Agreed. That is why I am preparing a table with each item
 with cost etc. This way the ambiguity will not be there for any bid not just br Manzar. 

Riaz
Sent from my iPhone