Attached is copy of 2009 Bid from Western Engineering for the Total $652,662 in sept of 2009 which was compared by Ilyas. Western bid was not the lowest Theis engineering and A C General was lower than Western , I think Riaz Bahi may still have those other bids.
Our curent bid is for $654,226.17 which is for half the parking lot and price is almost same as what it was 2 years ago.
I thought it is cheaper to build now ?
|
--
You received this message because you are subscribed to the Google
Groups "isfmasjid" group.
This is not an official ISF group. Items posted here are the opinions of the individual posting the email and not an ISF endorsement or announcement.
<2008 BID COMPARISON BY ILYAS.pdf>
<Current Bid.pdf>
I think you are correct Western bid did not include Concrete Pad for building. However concrete work was included as an option for $70,000 see Western Bid below. Eric's Bid of $ 749,623.90 did include all concrete work for $168,000.
One important point, all the previous bids were for entire parking not partial parking. According to Manzer in his presentation we will be saving $250,000 by using recycled crushed asphalt as a base and not paving the remainder parking lot. If we add 250,000 to his bid of $654,226.17 that would bring Manzer's Bid to $904,226.17
Manzar's estimate needs to be very clear. He needs to review his bid and carefully review the entire plan. Once he has time to review all the plans give us a complete proposal. Some of the items in his bid are counted twice. (E.g. Item # 5 is also listed in Item # 4). He need to be very clear in his item of work they need to be itemized separately for each item see sample attached.
I think he need to give us complete bid and include everything as shown on the plans. We should decide what to remove from the bid. This will give us the exact cost or saving of items we will be excluding at this time.
It is very hard to decide when he says in his opinion it cost around 150,000 to 200,000 there is big $50,000 difference. Or we will be saving 250,000 in paving that is why it is important to get a complete bid.
Bottom line we need to real cost of each item
|
Attached is copy of 2009 Bid from Western Engineering for the Total $652,662 in sept of 2009 which was compared by Ilyas. Western bid was not the lowest Theis engineering and A C General was lower than Western , I think Riaz Bahi may still have those other bids.
Our curent bid is for $654,226.17 which is for half the parking lot and price is almost same as what it was 2 years ago.
I thought it is cheaper to build now ?
|
|
|
|
<SAMPLE ESTIMATE FOR SITE WORK.pdf>