Varun Laboratories Plans for
670.08 TPA Pharmaceutical Unit
====================================
(Update : Refer our Earlier Report on
19th March, 2013
====================================
Varun Laboratories Pvt. Ltd. plans to set up a
Bulk Drug (including APIs, Intermediates and Fine chemicals)
Manufacturing unit having Capacity of 670.08 Ton/Year
at APIIC Industrial Park, Annarugudem Village, Tallada
Mandal, Khammam District, Andhra Pradesh.
Capacity : 670.08 Ton/Year
The plant will have a production capacity of:
4-Cams 13.20 Ton/Year
Hydroxy Carbazole 12.00 Ton/Year
Carbazole 13.20 Ton/Year
3-Acetyl Pyridine 13.44 Ton/Year
Pentaprazole 16.80 Ton/Year
4-Chloro Benzhydryl amine 18.00 Ton/Year
Carvedilol 12.00 Ton/Year
Guaiacol 72.00 Ton/Year
Ketrolac Tromethamine 18.00 Ton/Year
Bis(2-Chloro Ethyl) 24.00 Ton/Year
Amine Hydrochloride
Etoricoxib-1 12.00 Ton/Year
Cis Bromo Benzoate 30.72 Ton/Year
Pregabalin 14.40 Ton/Year
MetoFormi 120.00 Ton/Year
Methyl Sulphonyl methane 23.52 Ton/Year
Meldurms Acid 10.80 Ton/Year
Metho carbamol 48.00 Ton/Year
Guafenesin 180.00 Ton/Year
Fenofibrate 18.00 Ton/Year
-------------------------------------------
Total: 670.08 Tons/Year
Location : APIIC Industrial Park, Annarugudem Village
Tallada Mandal, Khammam District
Andhra Pradesh.
**************************************
As on November 15, 2013 : The Project is under Planning Stage .
Total site area is 2.274 Acres.
An area of about 0.77 Acres of land will be developed with green belt
which constitutes about 33% of the total project area.
IMPORTANT: As per the the discussion we had
on 28.10.2013 with Varun Laboratories Pvt. Ltd.
the Project is under Panning Stage.
The company is waiting still for Environmental Clearance.
The Project Work is like to start from April,2014.
The Project is Scheduled to be Completed by
in 12 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
2. Boiler : 1.5 TPH - 1 No
3. Thermic Fluid Heater
Capacity : 2.0 Lac Kcal/Hr - 1 No
Heat Exchangers, Air Pre-heater/Economiser)
Wet Scrubber for arresting fly ash
Air Polution Control:
There will be one no of flue gas stack and one process gas stack which
are the main emission source from the plant.
Proper Stack height and air pollution control measures will be provided in order to achieve norms prescribed by statutory authority.
For Boiler Cyclone & Bag filter will be provided with 30 Meter of Stack.
Single Stage Scrubber will be also be provided.
************************
Other Equipments:
SS Reactor
Capacity : 1000L (Hydrogenator): 1 N0
1000L : 04 N0s
2000L : 14 N0s
3000L : 08 N0s
4000L : 06 N0s
1000L : 03 N0s
---------------------------------------------
GMP S.S Reactor
Capacity : 2500L/3000L: 04 N0s
---------------------------------------------
G.L Reactor
Capacity : 1000L : 04 N0s
2000L : 04 N0s
3000L : 04 N0s
---------------------------------------------
P.P. VATs
Capacity : 4000L : 01 N0s
6000L : 02 N0s
--------------------------------------------
Dryer
Capacity : 48 Trays: 04 N0s
---------------------------------------------
Chilling Water plant
Capacity : 20 TR : 02 N0s
---------------------------------------------
Scrubbers(single stage) : 4 Nos
-----------------------------------------------
Cooling Tower
Capacity : 300 TR : 02 N0s.
Capacity : 150 TR : 02 N0s
---------------------------------------------
Vacuum jet : 4 Nos
-------------------------------------------
Cooling tower for vacuum : 2 Nos
----------------------------------------------
DM/R.O. plant : 5 m3/hr : 1 No.
---------------------------------------------
Air Compressor : 1 No.
----------------------------------------------
Effluent Treatment Plant : 50m3/day
----------------------------------------------
Solvents Pumps (SS/PP) : 6 Nos
-----------------------------------------------------
SS Centrifuge : 48” : 4 Nos
SS Centrifuge : 36” : 4 Nos
SS Hair Centrifuge : 36” : 1 No.
GMP Centrifuge : 48” : 4 Nos
----------------------------------------------
HDPE Storage Tanks(12 KL): 2 Nos
-----------------------------------------------------
MS/SS Solvent Storage Tanks(12 KL): 10 Nos
-----------------------------------------------------
Distillation Column Setup : 10m3/day
----------------------------------------------
Weighing Balance : 4 Nos.
----------------------------------------------
Fire Hydrant System : 1 No.
**************************
DG sets : 180 KVA - 2 Nos.
For back up in the common areas as well as for essential services
above Two D.G.sets will be installed..
Water Treatment Plant:
The daily water demand of the proposed project will be around
100 m3/Day.,
Industrial water demand will be 90m3/Day (Process & Wash,
Boiler feed & cooling tower demand); domestic water demand will be
4m3/Day and gardening will be 6m3/Day.
The source of water supply for the project will be from ground source..
************************************************************************
DM/R.O. plant : 5 m3/hr : 1 No.
************************************************************************
Details of Water Consumption
1.Domestic : 4 M3/Day
2.Process Water : 31 M3/Day
3.Boiler : 43 M3/Day
4. DM Plant : 4 M3/Day
5. Cooling Tower(make up) : 12 M3/Day
6. Gardening 6 M3/Day
---------------------------------------------------------------------------------------
Total: 100 M3/ Day
Details of Waste Water Discharge
1.Domestic : 4 M3/Day
2.Process Water :30 M3/Day
3.Boiler : 4 M3/Day
4. DM Plant : 4 M3/Day
5. Cooling Tower(make up) : 2 M3/Day
6. Gardening -
---------------------------------------------------------------------------------------
Total: 44 M3/ Day
Effluent Treatment Plant:
Capacity : 50 m3/ Day
Reverse Osmosis Plant
The quantity of wastewater generated from domestic activities during operation phase will be around 44/m3/Day which will be treated in the Wastewater treatment plant with a capacity of 50m3/Day.
The company will establish 50 m3/Day capacity of Biological effluent treatment plant (BETP) followed by Reverse Osmosis for treatment of Low TDS (less then 5000 ppm TDS) and Low COD (less than 15000 ppm COD) with activated sludge process.
The reject of ROs will be sent to Multiple Effective Evaporator (MEE) followed by Forced Evaporation for further treatment as explained below:
The company will establish 50 m3/Day capacity of MEE with Solvent Stripper and Forced Evaporation to treat high TDS effluents and high COD.
The incinerable hazardous waste generated will be proposed to send to cement industry and salts generated will be proposed to send to authorized TSDF.
.
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 33 % area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Varun Laboratories Pvt. Ltd.
Flat No: 203, Sree Residency Plot No 66/67,
APHB Colony, Opp: IDPL Colony, Balanagar
Hyderabad-500072, Andhra Pradesh,India.
---------------------------------------------------
Tel : + 91- 40-23073487
Email : varunlab...@gmail.com
**************************************
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
GET NEW PROJECTS INFORMATIONS ONLINE
http://www.industrialdirectoryofindia.com/download
We provide information on NEW PROJECTS such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.
with all Contact Details:
Company's Name
Address/ Phone/ Fax
Contact person's Name
E-mail Id
We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.
We make your Bidding/MARKETING/ Sub-contracting & Planning MORE EASY
GET YOUR COMPANY REGISTERED TODAY AND GET ALL PROJECTS INFORMATIONS DIRECTLY IN YOUR MAIL BOX .
Visit : http://www.industrialdirectoryofindia.com/registration
GET ALL BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX
------------------------------------------------------------------------------------------------------------
RELEASED ANNUAL ISSUE :
“NEW PROJECTS THIS WEEK”
Over 2250 Nos Projects Enquries Online