Chambal Fertilisers Plans To Set Up 800 TPD Single Super Phospate Unit..

544 views
Skip to first unread message

Industrial Directory Of India

unread,
Jun 23, 2011, 3:29:19 AM6/23/11
to industrialdir...@googlegroups.com
                      “New Projects This Week" 

                   RELEASED : ISSUE June 19 /11 

              Comprising  of  Total  60 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

 

 Chambal Fertilisers Plans To Set Up

 800 TPD Single Super Phospate Unit

 

Chambal Fertilisers and Chemicals Limited  plans to set up a

800 TPD Powdered Single Super Phosphate Unit in Kota District,  Rajasthan.

 

Capacity   :  800 TPD

Out of 800 TPD powdered Single Super Phosphate 400 TPD will be converted into Granular SSP.

 

Annual Production Capacity : 2.64 Lac MT

 (Operating Days : 330 Days per annum)

 

Location :   Gadepan Village, Kota District , Rajasthan.

 

**************************************

About Chambal Fertilisers :

Chambal Fertilisers and Chemicals Limited (CFCL)  is flagship company of Zuari-Chambal, part of K.K. Birla group, having two plants

(Gadepan-I & II) manufacturing nitrogenous fertiliser at Gadepan, Kota.

 

CFCL is the largest private sector fertiliser complex in India with total

(Gadepan-I & II plants) re-assessed capacity of 8,64,600 tons of urea

 per annum of each plant.

 

Both Gadepan-I &II plants represent a total investment of over Rs. 2,500

Crores. The total land acquired at Gadepan is about 1060 acres.

 

As you have known above that  Chambal Fertilisers and Chemicals Ltd. (CFCL) are operating Two state of the art Nitrogenous Fertilisers plants at Gadepan, Kota in the state of Rajasthan, but to provide all agriculture inputs including Single super Phosphate Fertilisers through Single Window Concept, CFCL has planned for a Single Super Phosphate (SSP) manufacturing unit, for the capacity of 800 TPD powdered Single Super Phosphate out of which 400 TPD will be converted in Granular SSP.

 

PLEASE NOTE:

There are approx. 74 Nos. Single Super Phosphate units operational in India.

The total installed capacity of SSP plants in India is 30 Lac MT.

It constitutes 20.50% of the total capacity of phosphatic Fertilizers.

Presently there is 12 Lac MT Gap in demand and supply of SSP.

Govt. agencies has projected demand supply gap of 17 Lac MT by the

year 2011-12.

 

Looking up at requirement of fertilizer in the country, andGovernment of India’s recent policy for phosphoric fertilizers, the Company has planned for this new project.

**************************************

As 0n  June 23, 2011 : The Project is under Planning Stage .

 

The unit would come up on 1.570 Hectare of Land .

 

IMPORTANT: As per the the discussion we had

on 18.06.2011 with Chambal Fertilisers and Chemicals Limited  

the Project  is  under Panning Stage.

 

The company is waiting for the clearance from State Pollution Control

Authority.

 

The project work is likely to start from  August/ September, 2011.

 

The Project   is Scheduled to be  Completed

by August, 2013.

 

So, this is the RIGHT TIME to contact  and Follow Up at following address obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

PROJECT COST:

The cost of the project has been estimated as Rs 4282 lacs.

The cost breakup is as follows:

 

1. Plant & Machinery of SSP Unit              :1596 Lac

2. Acid storage tanks                                  :  180 Lac      

3. De Dusting system                                  :  150 Lac

4. Safety & Fire fighting Equipments       :  40  Lac

5. Electrical & Instrumentation                   275 Lac

6. Civil                                                            :  890 Lac

7. Design, Erection & Commissioning      :251 Lac

8 .Others                                                       :900 Lac

-------------------------------------------------

                               Total  Rs 4282 lacs

 

The Main Scope of Supply includes:

Hot Air Generator

Fuel : Natural Gas / Furnace Oil

The SSP plant will utilize Furnace oil in the Ball mill for Moisture removal

from Rock phosphate. Furnace oil will also be used in Granular SSP

manufacturing for reducing moisture content of product.

      

Under Size Vibrating Screen (Size -1mm)

Oversize Vibrating Screen (Size+1.4mm)

Crushing Unit

Dryer

Granulator

Cooling System

Ball Mill
Packing

Mixer

Manufacturing Process:

The plant will have a capacity to produce 800 MT/day.

Out of 800 TPD powdered Single Super Phosphate 400 TPD will be converted in Granular SSP,

 

TheSSP manufacturing process will comprise of two basic steps :

Single Super Phosphate (SSP)

The rock phosphate will be ground in Ball mill. The ground rock phosphate will

then be mixed with Sulphuric acid of 68-69% concentration in Mixer. The

output from Mixer will be sent to Den and then to a shed for further curing to

form SSP powder for sale.

Granular Single Super Phosphate

SSP powder produced as mentioned above will be mixed with water to form

granules in Granulator. The granules formed will be heated to bring the

moisture content in desirable level. The hot granules will then be cooled and

passed through vibrating screens for desired mesh size and will be packed for

sale.

Heating System , Scrubber / Cyclones:

The grinding of rock phosphate may lead to emissions of dust.

Pulse jet dust collector will be provided to control dust emissions.

A stack will be provided at the ball mill. At mixer and Den, during acidulation

gases will be liberated. These gases from mixer and Den will be

passed through absorption stages as under;

1. Ejector

2. Cyclone separator

3. Ventury Scrubber

4. Multi Stage Scrubbing Towers


Scrubbing pumps will be interlocked with main plant equipment i.e. mixer so that in an event of failure of scrubber pump/scrubbing system, the whole plant gets automatically tripped. The gaseous emissions during the reaction stage in manufacturing of Phosphoric Acid are controlled through induced Draft Blower for scrubbing in the ventury scrubber.

 

RAW MATERIAL REQUIREMENT

ROCK PHOSPHATE AND SULFURIC ACID

1 Rock Phosphate (Min 31.5% P2O5)    : 460 TPD

2 Sulphuric Acid (98% concentration) : 296 TPD

 

DG set : 250 KVA  (1 No.)

For back up in the common areas as well as for essential services one

D.G.set with cumulative capacity of 250 KVA will be installed.

The fuel requirement will be about 42.5 litre/hr of HSD (as and when used).

 

Water Treatment Plant:

 Pumps, Valves, Custom Pipeline Work, Plumbing Work

 

The total water demand for this project has been estimated as

370 KLD.The source of water supply for the project will be

Kalisindh River.

 

The fresh water requirement for the proposed project will be used for

Dilution of Sulfuric acid, Absorption of Hydro Fluoro Silicic Acid, GSSPmanufacturing and domestic and plantation purpose etc

 

Details of Water Consumption

1. Process Water for SSP Unit   : 245 M3/Day

2. Process Water for GSSP       :   64 M3/Day

3.Domestic                              :   05 M3/Day

I. Scrubber (make-up)           :   30 M3/Day

I. Miscellaneous (Plantation) :   26 M3/Day

---------------------------------------------------------------------------------------

                                    Total  370 M3/ Day

 

 

Effluent  Treatment Plant

During operation phase  the main sources of effluent generation will be

as follows:

1. Effluent from scrubber sets (SSP /GSSP plant)

2. Domestic effluent

 

For SSP manufacturing, during mixing of Sulphuric acid and rock phosphate

ore, silica tetra fluoride and Hydrogen Fluoride will be evolved.

These gases will be scrubbed with the help of multi stage scrubbing system by addition of water. The effluent generated from this scrubber set will be Acidic and will contain Silica and acidic liquid H2SiF6. Effluent generated from scrubber set

will be collected in a common sump and pumped into a filter press/ notch

filter to separate out Silica.

During normal operation of plant, domestic sewage, approx 2.5 KLD, will be

treated through existing sewage treatment plant and shall be completely

reused for horticulture and green belt development as per existing practice.

 

Other Equipments:

Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel  with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing  Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine,  Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work.

 Ventilation & Exhaust System

Complete Laboratory Equipments

Fire fighting System as per TAC norms,

 

Green Belt Development plan in 33 % area and a scheme for Rainwater Harvesting have to be put in place.

                                         

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water &  Effluent  Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs  for the above project  may  Contact for etc.etc. may  Contact for Specified Enquiry at  :

 

Chambal Fertilisers and Chemicals Limited  

Corporate One, First Floor,

5 Commercial Centre,

Jasola, New Delhi - 110 025, India

---------------------------------------------------

Phones: +91-11-11 41697900 / 46581300

Fax      : +91-11-40638679

------------------------------------------------

Email    : cg_pu...@chambal.in

Website: www.chambalfertilisers.in

 

Plant Address:

Chambal Fertilisers and Chemicals Limited  

P.O. Gadepan - 325 208

District Kota, Rajasthan, India

---------------------------------------------------

Phones: +91-744-2782915 / 2934

Fax      : +91-7455-274130

 

**************************************                

        

     FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE   

                    http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                with all Contact Details:

                    Company's Name 

                    Address/ Phone/ Fax

                    Contact person's Name 

                    E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Over 2250 Nos Projects Enquries Online

                Visit : http://industrialdirectoryofindia.com/annual

 

 

Jun1911.jpg
Reply all
Reply to author
Forward
0 new messages