Yashashvi Rasayan Plans To Set Up Agro Chemicals & Organic Intermediates Unit

855 views
Skip to first unread message

Industrial Directory Of India

unread,
Feb 17, 2015, 10:08:02 AM2/17/15
to industrialdir...@googlegroups.com
   Industrial Directory of India.Com 

    Released
                        "New Projects This Week" 
                          RELEASED : ISSUE FEBRUARY 15/15 
              Comprising  of  Total  81 New Project Enquiries 
  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
           Visit http://industrialdirectoryofindia.com/FAQ

          (Helpline : +91-900 7158 600)  

                             New Project

     Yashashvi Rasayan Plans To Set Up 

Agro Chemicals & Organic Intermediates Unit
                            
Yashashvi Rasayan Pvt. Ltd.  plans to set  up a New Unit to produce Agro Chemicals & Organic intermediates at Dahej Industrial Estate Tal: Vagra in Bharuch District, Gujarat.

List of Finished Products & by‐ Products : 

  1. 3,6 DI CHLORO METHOXY BENZOIC ACID                                  :  500      Ton/Month
  2. 2 DI POTASSIUM SALT OF 3,6 DI CHLORO SALICYLIC ACID   : 701.50 Ton/Month
  3. 3 2,5 DI CHLORO PHENOL                                                             :  510.92 Ton/Month
  4. 4 2,5 DI CHLORO ANILINE                                                             : 664.75 Ton/Month

-------------------------------------------------------

       Location : Dahej Industrial Estate Tal: Vagra                                                                          Bharuch District, Gujarat 

Project Cost : Rs.215 Crores

     

**************************************

As on  February 17, 2015 : The Project is under Planning Stage . 

Total site area  is  62526  Sq. Meter.

An area of about  19996 sq. Meter (31.9%)of the total project area will be developed with green belt.  

IMPORTANT: As per the the discussion we had

on 09.02.2015 with Yashashvi Rasayan Pvt. Ltd. 

the Project  is  under Panning Stage.

 

The company is  waiting for Environmental Clearance.


The Project   is Scheduled to be  Completed 

in 18 Months from the date of the commencement

of the project work.

-------------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following address 
to obtain the detailed Enquiry of each product  in time and to
submit your quotation subsequently.
 
 
**************************
The Main Scope of Supply includes 
 
Boiler           : 15 TPH  - 2 Nos.
                 Fuel                   :  Coal
                 Stack
                 :  55 Meter (Dia : 850 mm)
(Actual Steam requirement : 22,000 kgs./hr)
Incinerator    : 1000 kgs./hr  - 1 No. 
 

Heat Exchangers, Air Pre-heater/Economiser).

Air Pollution Control Equipment :

Electro Static Precipitator


Adequate capacity of Electro Static Precipitator along with 55 Meters height of Chimney will be provided to both the boilers.


Scrubbers

Two stage Alkali Scrubbers will be provided to scrub Sulphur dioxide & nitrogen oxide gas generated from the process. Two stage water followed by alkali scrubber will be provided to scrub hydrogen chloride gas generated from the process. 11 meters height of vent will be provided.

************************

The unit proposes to install FO/LDO fired Incineration System having capacity is 1000 kgs./hr and ventury & wet scrubber along with 30 meters height of chimney to incinerate tarry waste generated from the process & methyl chloride gas generated from the process.

************************

Other Equipments: 

SS  Reactor              
---------------------------------------------
Distillation columns
---------------------------------------------
  Fractionating columns
--------------------------------------------- 
  Rotary Vacuum Paddle Dryer
--------------------------------------------- 
Hydro-Genator             
 ---------------------------------------------
  HDPE absorbers for Hydro Chloric Acid             
 --------------------------------------------- 
  PTFE and Stainless Steel Pumps             
 ---------------------------------------------
  SS Water Ring Vacuum Pumps
--------------------------------------------- 

Receiver S.S. tank 
 ---------------------------------------------
Storage Tank     
--------------------------------------------
Safety valve 
--------------------------------------------
Chilling plant :  1000 TR 
---------------------------------------------
 Cooling Tower : 3000 TR
---------------------------------------------
 Agitated nutsche filter     
----------------------------------------------
Valve    
---------------------------------------------
High Vacuum Steam ejectors:           
---------------------------------------------
Fire hydrant
---------------------------------------------
 Reactor with distillation condenser 
************************ 

Other Details:

• The raw materials will be stored in closed containers and will be handled through closed system to avoid the handling losses.

 The Reactor shall be connected to an efficient condenser system with cooling/chilling water/brine circulation.

• Reactor and solvent handling pumps shall have mechanical seals to prevent leakages. Also provide with breather valve to prevent losses.

 Solvent will be taken from storage tank to reactors through closed pipe line

Storage tank shall be vented through trap receiver & condenser operated on cooling water.

• The condensers shall be provided with sufficient HTA and residence time so as to prevent any loss of solvent.

************************

1500 KVA 1 No.

 It will be used only during power failure. 270 kgs/hr of HSD will be used as a fuel & 11 meters height of chimney will be provided. 

Water Treatment Plant:

 Pumps, Valves, Custom Pipeline Work, Plumbing Work 

The total water requirement will be 400 m3/ Day

It will be sourced from GIDC water supply Deptt. 

Details of Water Consumption 

   1. Domestic                             :     10       m3/ Day
2. Process                              :     106     m3/ Day
3. Cooling Tower (Make-up)    :     195     
m3/ Day
4. Boiler                                  :      54     
m3/ Day
5. Scrubbing                           :       5     m3/ Day
   6. Washing                             :       20    m3/ Day
   7. Gardening                           :      10     m3/ Day

---------------------------------------------------------------------------------------
                    Total:  400 m3 / Day 

Details of Waste Water Generation

   1. Domestic                             :     7       m3/ Day
2. Process                              :    205    m3/ Day
3. Cooling Tower                    :     20     
m3/ Day
4. Boiler                                  :      7     
m3/ Day
5. Scrubbing                           :       5     m3/ Day
   6. Washing                             :       20    m3/ Day                                                                                                                        
---------------------------------------------------------------------------------------
                    Total:  264 m3 / Day
************************

Effluent Treatment Plant:

 The industry will generate 264 m3/Day of effluent.
   
Out of this  257 m3/Day of industrial effluent generated. Out of which about 205 m3/Day of effluent generated from the process will be collected separately, neutralized, filtered, extracted in solvent, distilled & finally taken to MEE. Balance 52 m3/Day of normal effluent & 163.243 m3/Day of condensate from MEE & low boiler from distillation (total 215.243 m3/day) will be treated in proposed primary, secondary & tertiary treatment plant & disposed off into GIDC Treated Effluent Drainage line of GIDC Dahez for ultimate disposal into Arabian Sea.

 About 20.1 MT/day of Extracted solvent will be recycled into plant.
• 0.202 MT/day of organic waste during distillation of effluent will be taken to
Incineration.
• 38.125 MT/day (32.849 M3/day) of salt from MEE will be sent to TSDF.
• 163.243 m3/day of low COD & low TDS condensate from MEE & low boilers from distillation will be sent to effluent treatment plant. 
• Thus 215.243 m3/day of normal effluent will be treated in proposed primary, secondary & tertiary treatment plant & disposed off into GIDC Treated Effluent Drainage line of  GIDC Dahez for ultimate disposal into Arabian Sea.

Other Equipments:

Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel  with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing  Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine,  Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work. 

Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms, 
 
Green Belt Development plan in 19996 sq. Meter (31.9%)  area and a scheme for Rainwater Harvesting have to be put in place.                                         

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water &  Effluent  Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs  for the above project  may  Contact for etc.etc. may  Contact for Specified Enquiry at  :  

Yashashvi Rasayan Pvt. Ltd.  

A-6, Maroli Udyognagar

Post. Maroli - 396 436

Dist: Navsari,Gujarat, India

-----------------------------------------

Tel          : +91-2637 - 272060 / 62

Fax         : +91-2637-272240

Email      :    in...@yashrasayan.com  

Website  :    www.yashrasayan.com

 
            New Projects
 

**************************************               

          FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES
                   Visit : http://industrialdirectoryofindia.com/FAQ
      GET NEW PROJECTS INFORMATIONS  ONLINE   
                    http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.                

                 with all Contact Details:
                 Company's Name
                 Address/ Phone/ Fax
                 Contact person's Name
                 E-mail Id
 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion. 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

Visit : http://www.industrialdirectoryofindia.com/registration 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------         

             RELEASED ANNUAL ISSUE :
      “NEW PROJECTS THIS WEEK”
    
Feb1515.jpg
Reply all
Reply to author
Forward
0 new messages