"New Projects This Week"
RELEASED : ISSUE JULY 07/13
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600)
RA Chem Pharma Plans To Set Up
5853.67 Kgs/Day Bulk Drugs Unit
RA Chem Pharma Ltd. plans to set up another NEW Bulk Drugs and Intermediate Production Unit having Capacity of
5853.67 Kg/Day at Mukteswara Puram, Jaggayya Pet Mandal in Krishna District, Andhra Pradesh.
Capacity : 5853.67 Kgs/Day
(175. 610 Ton/Month)
Following Products will be manufactured in the proposed plant :
-------------------------------------------------------
Total : 175,610.00 Kgs/ Month
(5853.67 Kgs/Day)
Location : Mukteswara Puram, Jaggayya Pet Mandal
Krishna District, Andhra Pradesh
**************************************
As on July 11, 2013 : The Project is under Planning Stage .
Total site area is 21.46 Acres.
An area of about 7.51 Acres out of the total project area will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 05.07.2013 with RA Chem Pharma Ltd.
the Project is under Panning Stage.
The company is waiting for Environmental Clearance.
The Project is Scheduled to be Completed by
Within 9-10 Months from the date of commencement
of Project Work..
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following address obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Heat Exchangers, Air Pre-heater/Economiser)
Wet Scrubber for arresting fly ash
Air Polution Control:
There will be one nos. of flue gas stack which are the main emission source from the plant.
Proper Stack height and air pollution control measures will be provided in order to achieve norms prescribed by statutory authority.
For Boiler Cyclone separator. & Bag filter will be provided with 32 Meter of Stack for 10 TPH Coal Fired Boiler.
Scrubber will also be provided.
************************
MANUFACTURING PROCESS:
METFORMIN HYDROCHLORIDE
Dimethylamine hydrochloride reacts with Dicyanodiamide in the presence of Xylene
and Water Solvent media to produce aqueous layer containing Metformin
Hydrochloride which is purified with Activated carbon in the presence of Methanol
Solvent media to produce Metformin Hydrochloride..
ELETRIPTAN
Stage-1
A solution of 5-bromoindole, phenylvinylsulphone, Palladium acetate, tri-Otolylphosphine and triethylamine is heated to 90-105 °C for 6-15 hrs in DMF.
The reaction mixture is cooled to RT and diluted with DCM and filtered over a bed of
filter. The filtrate is washed with water and brine and dried over sodium sulphate.
The organic layer is concentrated under vacuum and product precipitated from
DCM & hexane as a solid.
Stage-2
A suspension of (E)-5-(2-(phenylsulphonyl) vinyl)-1H-indole in methanol, THF and
Pd/C is subjected to hydrogenation at 45-50 psi. Upon completion of the reaction
he catalyst is filtered off and solvent removed under vacuum to provide an off white solid.
Stage-3
To a solution of Cbz-D-Proline in DCM, Oxalyl chloride is charged and allowed to
stir at RT for 1 hr. The solvent is distilled and the reaction mass is diluted with
DCM. In a separate step Ethylmagnesium bromide is added to 5-(2-
phenylsulphonyl)ethyl-1H-indole in DCM and cooled to -20 °C and add ZnCl2
followed by prepared CBZ-prolinyl acid chloride in DCM and stirred for 10 hrs at -15
to -25 °C. Upon completion of the reaction, cooled to RT and diluted with DCM. The
organic layer is washed with Sat. Ammonium chloride solution, Sat. Sodium
bicarbonate solution and brine. This layer is dried over sodium sulphate and
concentrated under vacuum to give pure product.
Stage-4
To a suspension of LAH & THF, add (R)-benzyl 2-(5-(2-(phenyl-sulphonyl) ethyl)-1Hindole-3-carbonyl) pyrrolidine-1-carboxylate at 0 °C and then slowly heated to reflux.
Upon completion of the reaction in about 3-5 hrs, the reaction is cooled to 0-5 °C
and add NaOH, water. The solids are filtered and washed with THF and the filtrate
was distilled under vacuum. The residue is extracted with DCM and dried over
sodium sulphate and distilled to give crude compound. To the residue add DCM and
Oxalic acid, the oxalate crude is washed with ether and made basic and extracted
with DCM. The organic layer is dried over sodium sulphate and distilled to provide
the Eletriptan.
SERTRALINE HYDROCHLORIDE
Stage-1
α-Napthol when reacts with Di chloro Benzene in presence of Aluminum chloride
produces stage-1 compound. The product is isolated in Methanol.
Stage-2
The above compound on condensation with Mono methylamine produces stage-2
compound. Methanol is used as solvent.
Stage-3
This stage compound is obtained when the stage-2 product undergoes reduction
reaction in acidic medium. Methanol is used as solvent.
Stage-4
Finally pharma is obtained when stag-3 product is treated with D (-) Mandelic acid in
Ethyl Acetate medium. The compound is purified with carbon and water. The pharma
is crystallized in Methanol.
CHLORPHENESIN
Stage-1
Epichlorohydrin is treated with water in the presence of Phosphoric Acid to get 3-
Chloro-1-2-Propane diol.
Stage-2
Parachloro phenol is reacted with 3-chloro-1-2-propane diol in the presence of
Sodium hydroxide solution. The resulting compound is extracted into dichloroethane
and the solvent and product is distilled to get almost pure material as liquid product..
Stage-3
The Liquid Product is crystallized from Isopropyl ether to get pure crystalline material.
************************
Other Equipments:
SS Reactor
---------------------------------------------
Dryer
---------------------------------------------
Filter Drier
--------------------------------------------
Chilling Water plant
---------------------------------------------
Cooling Tower
---------------------------------------------
SOLVENT RECOVERY SYSTEM
-------------------------------------------
DM plant
----------------------------------------------
Water Softener
---------------------------------------------
Air Compressor
----------------------------------------------
Effluent Treatment Plant
----------------------------------------------
Pumps
-----------------------------------------------------
Centrifuge
----------------------------------------------
SS & HDPE Storage Tanks
-----------------------------------------------------
Compressor
----------------------------------------------
Agitator
**************************
DG sets :
500 KVA - 2 Nos.
( Fuel : HSD- 100 Liters/Day)
For back up in the common areas as well as for essential services
above Four D.G.sets will be installed..
Water Treatment Plant:
The total water requirement will be 174 m3/Day,
Details of Water Consumption
1.Domestic : 8.00 M3/Day
2.Process Water : 51.40 M3/Day
3.Boiler : 50.0 M3/Day
4. Cooling make up : 40.0 M3/Day
5. Gardening : 5.0 M3/Day
6. DM Plant : 5.0 M3/Day
7. Scrubber : 5.0 M3/Day
8. Washing- 10.0 M3/Day
------------------------------------------------------------------------------------
Total: 174 M3/ Day
Details of Waste Water Generation
1.Domestic : 8.0 M3/Day
2.Process Water(Recy:+1.7) : 53.14 M3/Day
3.Boiler make up : 15.0 M3/Day
4. Cooling make up : 12.0 M3/Day
5. DM Plant : 5.0 M3/Day
6. Scrubber : 5.0 M3/Day
7. Washing- 10.0 M3/Day
---------------------------------------------------------------------------------------
Total: 108.14 M3/ Day
Effluent Treatment Plant:
The effluent that will be generated from the plant will be mainly from
process, washings, scrubbers, cooling towers & boiler blow downs and domestic effluent.
Effluent from process, washings and scrubbers will be sent to Stripper, Multiple Effect Evaporator followed by ATFD and Biological treatment system.
Domestic effluent shall be sent to septic tank followed by soak pit.
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 33 % area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
RA Chem Pharma Ltd.
Plot No. 26 & 27, Technocrats Industrial Estate, Phase – 1
Balanagar, Hyderabad - 500 037., Andhra Pradesh, India
---------------------------------------------------
Tel : + 91-40-4475 8595 (hunting lines)
Email : in...@rachempharma.com
Website : www.rachempharma.com
**************************************
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
GET NEW PROJECTS INFORMATIONS ONLINE
http://www.industrialdirectoryofindia.com/download
We provide information on NEW PROJECTS such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.
with all Contact Details:
Company's Name
Address/ Phone/ Fax
Contact person's Name
E-mail Id
We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.
We make your Bidding/MARKETING/ Sub-contracting & Planning MORE EASY
GET YOUR COMPANY REGISTERED TODAY AND GET ALL PROJECTS INFORMATIONS DIRECTLY IN YOUR MAIL BOX .
Visit : http://www.industrialdirectoryofindia.com/registration
GET ALL BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX
------------------------------------------------------------------------------------------------------------
RELEASED ANNUAL ISSUE :
“NEW PROJECTS THIS WEEK”
Over 2250 Nos Projects Enquries Online