Rajashree Cement Is Going For Major Expansion With Captive Power Plant..

1,691 views
Skip to first unread message

Industrial Directory Of India

unread,
Jul 14, 2011, 1:02:58 PM7/14/11
to industrialdir...@googlegroups.com
                      “New Projects This Week" 

                   RELEASED : ISSUE July  10 /11 

              Comprising  of  Total  60 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

 

  Rajashree Cement Going For Major

 Expansion With Captive Power Plant

 

Rajashree Cement is going for the expansion of its  Greenfield Integrated Cement Plant in  Gulbarga District, Karnataka.
The  company plans for the expansion of the Cement Plant from
4.2 MTPA to 8.7 MTPA; Clinker from 4.7 to 9.0 MTPA,
Captive Power Plant from 58.2 MW to 190 MW  including 15 MW of WHRB and Captive Limestone Mines from 6.7 MTPA to 13.4 MTPA (733.82 ha) at Village Malkhed,  Aditya Nagar, District Gulbarga, Karnataka.

 

Capacity :

Expansion

Cement Plant  : From 4.2 MTPA to 8.7 MTPA

Clinker            : From 4.7 to 9.0 MTPA

Limestone Mine : From 6.7 MTPA to 13.4 MTPA

 (Captive: area 733.82 ha)                                 

 

Captive  Power Plant   : From 58.2 to 190 MW

                 (including 15 MW of WHRB)

 

Location :   Village Malkhed, Hanganahli, Udgi & Diggaon, 

                        Aditya Nagar, Taluka Sedam, P.O.Malkhed Road, 

                        District Gulbarga, Karnataka.

 

 

As 0n  July 14, 2011 :  The  Project is  under  planning stage.

 

The total area for the cement plant and captive power plant is 453.00 ha, 733.82 ha for mine and total area is 1186.82 ha for expansion of clinker production .

IMPORTANT: As per the discussion we had on 06.07.2011 with  Rajashree Cement the Expansion project is under planning stage.

The Land has been acquired.

The company has reeived the MoEF Clerance.

 

 The project work is likely to start from

 August/ September, 2011. 

 

 The Project   is Scheduled to be  Completed

By June, 2013 .

 

So, this is the RIGHT TIME to contact  and Follow Up at following address obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently. 

 

*****************************    

The Main Scope of Supply includes:

 

Boiler ( For CPP) – Coal Fired

 

Heat Exchangers, Air Pre-heater/Economiser)

 

Limestone (13.4 MTPA), laterite/bauxite (0.88 MTPA), coal (2.55 MTPA), chemicals gypsum (0.20 MTPA) and fly ash (2.05 MTPA) will be used as raw materials. PPC Cement  will be manufactured using fly ash from Captive Power Plant.

 

Waste Heat Recovery Boiler: 

The hot flue gases from DRI kilns will pass through waste heat recovery Boilers to recover the heat and to generate 15 MW electricity. The gases after heat recovery will pass through ESPs and then discharged through chimneys into the atmosphere for effective dispersion of emissions into the atmosphere.

 

Limestone Mining

Limestone mining will be carried out by Mechanized Opencast method of mining

The top soil will be removed and used for green belt development.  The limestone bench of 10 m height will be drilled and blasted.  The overall pit slope will be kept at 450.  Blasted limestone will be transported by tippers to the crushers.

Mining will include the following activities:

- Removal of Over Burden

- Drilling & Blasting

- Crushing of Limestone

- Loading

- Transportation to the cement plant via Conveyor Belts

 

In Lime Stone Mines Crusher will be provided with Water Spray on the Hopper and at material transfer points.


Air Blasters
Air Slides

Clinker Grinder Unit

Grate Coolers

Vertical Roller

Ball Mills

High Efficiency Separators.

Cement Storage Silo

Packing Machine

 

Air Polution Control Equipment:

High efficiency ESP, bag house, bag filters will be installed to mitigate particulate emissions within 50 mg/Nm3.  Proper stack height will be provided as per CPCB guidelines. Fly ash will be stored in silos and closed shed.

 

Dust suppression and extraction system with bag filters and atomized water sprinklers will be provided to prevent fugitive dust emissions at limestone and coal uploading hopper and handling area.

 

Cooling Tower

DG Sets (as stand by during Power Failure)

Air Conditioning Plant

Material Handling Equipment

Conveyor

Crusher

Vibrating Screens

Pneumatic Conveying system

 

Other Systems

  • Fuel handling system
  • Ash handling system
  • Air Cooled Condenser
  • Fuel system

  

Water Treatment Plant

Oxidisation Chamber,Filter, DM Plant, Tube Settler

Pumps, Valves, Custom Pipeline Work, Plumbing Work

 

Water requirement will be 14,817m3/day for this integrated project.

 

Source of Water: The water requirement will be met from

River Kagina and Mine Sump.

 

Effluent Treatment Plant

The Waste Water from the CPP will be recycled back to the process and used for cooling and dust suppression.   Domestic effluent will be treated in the sewage treatment plant and treated effluent will be used for green belt and dust suppression in the mines. 

No effluent will be discharged outside the premises and Zero discharge will be adopted. Excavated mine pits will be used for rain water harvesting. Rain water harvesting structures will be constructed in plant and colony area. 

 

 No solid waste will be generated from the cement manufacturing process. Dust collected from the air pollution control equipments will be recycled in process. Fly ash will be used for manufacturing PPC Cement.  Sludge from STP will be used as manure for green belt. Overburden will be used for bund formation and horticulture as per approved mining plan.  No mine waste will be generated.  Process dust/spillages will be recycled.  STP sludge will be used as manure for horticulture purpose.  Waste/used/spent oil and used batteries will be sold to authorized recyclers/re-processors.

 

Material Handling Equipment – Conveyors, Screen, Crushers, Feeders, Cement Grouting Pumps, Air Pollution Control Equipments, Gear Boxes,  Cooling Tower, Blowers, E.O.T.Cranes, Hydraulic Equipments, Complete Laboratory Equipments, Water line Valve, Pump, Storage Tank, Vessels, Pipeline etc. etc. 

Fire fighting System as per TAC norms.
Green Belt Development plan in 33 % area and a scheme for Rainwater Harvesting have to be put in place. 
Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed, Substation-Control Panel- Electrical Work,Elevators, Plumbing Work, Structural Steel Fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Material Handling Equipment – Conveyors, Screen, Crushers, Feeders, Rotary Klin, Air Slides, Air Blasters, Heat Exchanger, Clinker Grinder Unit, Grate Coolers, High Efficiency Separators, Cement Grouting Pumps, Air Pollution Control  Equipments, Gear Boxes,  Water Treatment Plant,  Effluent Treatment Plant , Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. etc.   may  Contact for Specified Enquiry at :

 

Rajashree Cement

Aditya Birla Centre

1st Floor, 'C' Wing, S.K. Ahire Marg

Worli , Mumbai 400 030. India

--------------------------------------------------------

Tel   :  + 91-22-2499 5000 /  6652 5000

Fax :  + 91-22-6652 5741/ 42

--------------------------------------------

Website : www.adityabirla.com

-----------------------------------------------------------------

               

         FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE   

                   

             http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

              with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                 Contact person's Name 

                 E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Over 2250 Nos Projects Enquries Online

                Visit : http://industrialdirectoryofindia.com/annual

 

 



Jul1011.jpg
Reply all
Reply to author
Forward
0 new messages