S. K. Solvochem Plans To Set Up
1,500 Ton/Year Chemical Unit
S. K. Solvochem Pvt. Ltd. plans to set up a Synthetic Organic Chemical Production Unit
having Capacity of 1,500 Ton/Year at Nimbua Village, Tehsil : Dera Bassi in Mohali District, Punjab.
Capacity : 1,500 Ton/Year
Following Products will be manufactured in the proposed plant :
-------------------------------------------------------
Total : 1500 Ton/Year
Location : Nimbua Village, Tehsil : Dera Bassi
**************************************
As on January 14, 2014 : The Project is under Planning Stage .
Total site area is 6000 Sq. Meter.
An area of about 33% of the total project area will be developed with green belt.
IMPORTANT: As per the discussion we had on 02.01.2014 with
S. K. Solvochem Pvt. Ltd. the Project is under Panning Stage.
The company is waiting for Environmental Clearance.
The Project Work is likely to start by March, 2014.
The Project is Scheduled to be Completed in 10-12 Months
From the date of commencement of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following address
to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Boiler : 3 TPH - 1 No.
Fuel : Multi Fuel ( Wood / Coal )
Heat Exchangers, Air Pre-heater/Economiser).
Air Pollution Control Equipment :
Multi Cyclone Dust Collector
The plant shall be provided with Multi cyclone Dust Collector
for collection of the fly ash that would be produced from the Process of coal combustion in Boiler Furnace.
• The properly designed chimney having height and diameter as per norms
of pollution control board will be provided.
• Sampling point for stack sample will also be provided as per norms
of Punjab Pollution control board.
To control emissions from Process Vents adequate Scrubber will be installed.
Two Scrubber will be provided, connected to Reaction Vessel to control vapors of
Hydrochloric Acid and Sculpture dioxide.
**************************
MANUFACTURING PROCESS
2 Ethyl Sodium Hexonate
• Charge 1200 Lt. 2 EHA (2-Ethyl Hexanoic Acid in Reactor and cool up to 15°C - step -1. Charge 100 Lt. H2O in a reactor and & add 10 kg NaOH in reactor stir for 30 minutes & cool to 20°C - step II. Add step II in step I and maintain temperature up to 25°C and check
pH 7.5 - 8.0. Filter it though sparkler filter with activated carbon bed. Collect filtrate in reactor Vacuum Distillation up to viscous slurry. Take this in CE & dry. Dry weight 1250 kg.
•Charge 500 kgs Volta chloride (Voltarol emlugel) in a Reactor add AlCl3 100 kg at normal room temperature, stir for 2 hrs. Cool it up to 80-90°C. Filter it though sparkler filter with activated carbon bed. Dehydrate it with CH3OH 200 ltr. & distilled CH3OH. After distillation of CH3OH add 10% NaOH, solution for Crystallization completely at temp.
40°C. The centrifuge the material & sent to drying in tray Dryer. Dry at 50-55°C and get output - dry weight 475 kg.
****************************************************
6-Amino Pencillanic Acid (6-APA) – Mol Wt. - 216
• Charge DI water 100 lt at the room temp & change 50 yrs pen G k stirs for 20 minutes to dissolve pen - G K Completely transfer pen G K solution to another reactor which is Enzymatic with auto control ph system with 2-3% Ammonia solution pH 7.5-8.0 that will be taken around one to one & half hours up to pH should be stable. This reacted mass taken into another reactor which already have 250 ltr. MDC stir for 15 minutes & allow to settling. Separate MDC layer into collector.
Remaining solution is crystallized with HCL solutions pH 4.2 white crystals. Take into centrifuge 7 wet crystals dry in Tray Dryer for drying at temp 40-50°C get out put 25 kg.
****************************************************
Cloxacillin – Sodium
• Charge 6 APA - 50 kgs + 20 Ltr. Tea stir 2 hrs. add ace amide and stir for 30 minutes & Heat upto 40°C charge CIMC 25 kgs at 40 degree stir for 2 hours add sodium-2 Ethyl hexonate 25 kgs stir for 1 hrs at 30 degree Celsius and allow for setting. Layer separate MDC and give NaCl treatment. Centrifuge and wash cake with acetone 50 lts. Unload thewet cake and sent to Dryer. Dry at 40 degree Celsius get output dry weight is 100 kgs..
****************************************************
Ofloxacin
• Take 2,3,4- Trifluoronitrobenzene in Aerator at room temperature and add 10% KOH solution for 2,3 - difluoronitro phenol formation check clarity OK. Then start adding K2CO3 & monochloro acetone solution at 10-15 degree Celsius for formation of 1-(2 3
difluoronitor phenoxy) proporn-2 orne take it into for Raney Nickel treatment with diethylethoxy methlene malonate at pressure 4.5 kgs for 3 hours. It forms Acidester and adjusts pH will HCL after reflux for 2 hours. After the HCl treatment takes for consideration with N-Methypiperazine. Now ofloxain slurry centrifuge and dry at 50 degree Celsius for 2 hrs moisture less then 1% and get output 150 kgs. .
Other Equipments:
Reactor :
---------------------------------------------
Stainless Steel Centrifuges
---------------------------------------------
Try Dryers & Fluid Bed Dryers of different capacities
---------------------------------------------
Air Handing Unit/ Fresh Air Unit
Receiver S.S. tank
---------------------------------------------
Storage Tank
--------------------------------------------
Safety valve
--------------------------------------------
Chilling plant & pump
---------------------------------------------
Cooling Tower with pump
---------------------------------------------
Distillation columns, Receivers, Transfer pumps etc.
----------------------------------------------
Valve
---------------------------------------------
Pipe line :
---------------------------------------------
Fire hydrant
---------------------------------------------
High Pressure Liquid Chromatography
---------------------------------------------
Acetic acid pump
**************************
DG sets :
500 KVA - 1 No.
For back up in the common areas as well as for essential services
above Four D.G.sets will be installed..
Water Treatment Plant:
The total water requirement will be 40m3/ Day
The primary source of the water will be tube wells to be installed at the site.
To meet the requirement soft water and Demineralized water, Water softeners, and DM Water Plant of required capacity will be installed.
The unit will need water for:
a) Process addition
b) Washing
c) Housekeeping
d) Boiler feed water make-up
e) Cooling water make-up
f) Water treatment (RO/DM) plant maintenance
g) Air pollution Control system (for wet gas cleaning processes)
h) Domestic requirement
Effluent Treatment Plant:
Waste water from other sources floor washing, boiler blown, and cooling water blow down
scrubber and quality control lab, water recovered from MEE would be sent to effluent Treatment Plant,
.
The project will produce <15 m3/day of process effluent and <2 m3 of domestic wastewater
The proposed ETP will be well designed to treat 15 m3/Day Effluent.
Primary treatmenta) Screeningb) Equalizationc) Air-strippingd) Neutralization/pH adjustmente) Coagulation-flocculationf) Clarificationg) Primary sludge dewatering/drying
Secondary treatment (biological stabilization)
a) Aerobic stabilization – through activated sludge process – comprising of aeration tankfollowed by secondary clarifierb) Secondary sludge dewatering/dryingTertiary treatment (polishing)a) Multi-grade pressure depth filterationb) Activated carbon adsorptionc) UV treatment
Other Equipments:
Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine, Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work.
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 33% area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
S. K. Solvochem Pvt. Ltd.
SCF-8, First Floor, Sector 19-D
Chandigarh- 160019, Chandigarh, India.
-------------------------------------------------….
Tel : +91- 172-5074523
Fax : +91- 172-5074523
**************************************
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
GET NEW PROJECTS INFORMATIONS ONLINE
http://www.industrialdirectoryofindia.com/download
We provide information on NEW PROJECTS such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.
with all Contact Details:
Company's Name
Address/ Phone/ Fax
Contact person's Name
E-mail Id
We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.
We make your Bidding/MARKETING/ Sub-contracting & Planning MORE EASY
GET YOUR COMPANY REGISTERED TODAY AND GET ALL PROJECTS INFORMATIONS DIRECTLY IN YOUR MAIL BOX .
Visit : http://www.industrialdirectoryofindia.com/registration
GET ALL BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX
------------------------------------------------------------------------------------------------------------
RELEASED ANNUAL ISSUE :
“NEW PROJECTS THIS WEEK”
Over 2250 Nos Projects Enquries Online