FREE TRIAL Copy >>Projects Update (Projects under Planning Stage) : 7th November, 2017.,,,..,.....................................

9 views
Skip to first unread message

Industrial Directory Of India

unread,
Nov 8, 2017, 11:51:56 PM11/8/17
to industrialdir...@googlegroups.com
Industrial Directory of India.Com 

       Released

          "New Projects This Week" 
                RELEASED : ISSUE November  05/17
            Comprising  of  Total  81 New Project Enquiries  
            http://www.industrialdirectoryofindia.com/download
************************** 
Get Your FREE Trial Copy Today
    For All Sectors with All Contact Details)
============================================= 
                       Projects Update
            (Projects under Planning Stage) 
  Visit :    http://www.industrialdirectoryofindia.com/download  

(Helpline : +91-900 7158 600/ 900 7742 600)   

Project Update             7th November, 2017

Chemical  :                                  Project Cost :  Rs.24 Crore    

First Info: November 2017 

The company plans to expand the production capacity of its Fertilizers &  Pesticides Unit,

The project is in planning stage.

As of  7th November, 2017, the company is waiting for necessary clearance.

**********************************************************************

The Main Scope of Supply includes:
**********************************************************************

Boiler : 5 TPH (Fuel : Coal)            : 1 No. 

Existing :  2 TPH (Wood/Bio Coal)

 Heat Exchangers, Air Pre-heater 

---------------------------------

Air Pollution Control :  

Multi Cyclone Dust Collector and Bag Filter
Air pollution control measures is proposed for the effective control of gaseous emissions within permissible limits. Cylcone Separator with Bag filter and Scrubber to be provided to boiler to control particulate emissions.   
DG Set       : 500 KVA( HSD)  :  1 No. 

Other Equipments:

Reactor, Heat Exchangers, Centrifuges, and Storage Tanks. To support the process equipment Boilers, Chilling plants, Cooling Towers, Agitator, Weighing Balance. Fire Hydrant System, Coal Handling System.c

==============================================

Water Requirement after expanson344.2 m3/ Day                                   Total raw water requirement will be is 344.2 m3/ Day (Industrial: 317.2 m3/ Day + Domestic: 7.0 m3/ Day + Gardening: 20.0 m3/ Day)  

Effluent Treatment Plant :  

Waste Water Generation :  119 KLD 

Industrial: 112.4 KLD + Domestic: 6.6 KLD.


Visit :    http://www.industrialdirectoryofindia.com/download


Agro-Chemical   :                             Project Cost :    Rs. 375 Crore  

First Info: November 2017 "New Project This Week": 05 November, 2017/Sl. No. 08


The company plans to set up a New Pesticide Technicals & Pesticide Intermediates manufacturing unit. 

The project is in planning stage. 
As of 7th November, 2017,Pre-Project Activities are on. 

**********************************************************************
The Main Scope of Supply includes:
**********************************************************************           Boiler :    10 TPH: 3 Nos. (Coal)  

Heat Exchangers, Air Pre-heater.   

Air Pollution Control :  Dust collector & bag filter

The sources of air pollution in the plant are for proposed 3 x 10 TPH Coal fired boiler. Backup DG sets  to energy requirement during load shut downs.. Dust collector & bag filter shall be provided with stack height 0f 30 Meter. ,..
Thermic Fluid Heater : 5 Lac/KCal : 1 No. ( Fuel :Coal)
DG Set                 : 1X2500 KVA,1X1500 KVA &1X1000KVA  ( HSD)  
Other Equipments:
Cooling Towers, Reactor, Heat Exchangers, Centrifuges, and Storage Tanks, Chilling plants, Centrifuge, Air Compressor, Effluent Treatment Plant, Pumps, Centrifuge, SS & HDPE Storage Tanks , Agitator, Weighing Balance. Fire Hydrant System  etc..

Water Treatment Plant

Oxidisation Chamber, Pressure Sand Filter / IRF, R.O. Plant,                            

Water Requirement 887.86 m3/ Day                                                                    [Domestic : 20 m3/day + Process : 442 m3/day Boiler  : 330 m3/day  + Cooling Tower :70.36 m3/day +     Gardening : 15.5 m3/day    

Effluent Treatment Plant :   1500 KLD

Waste Water Generation :457 KLD  ( Industrial :  440 KLD + Domestic : 17 KLD)

Visit :    http://www.industrialdirectoryofindia.com/download

Pharmaceuticals       

First Info: November 2017 

The company plans for an expansion of its Dyes & Dyes Intermediates manufacturing unit 

The project is in planning stage. 

As of  7th November, 2017, the company is waiting for necessary clearance.

********************************************************************

The Main Scope of Supply includes:

**********************************************************************

Boiler :  2 TPH  ( Fuel : Briquettes/ Natural Gas1 No

Existing : Boiler : 600 Kg/Hr & 2 Lac Kcal/ Hr. Thermic Fluid Heater(Natural Gas)

Heat Exchangers, Air Pre-heater/Economiser)  .

Air Pollution Control : 

Adequate stack height and common stack monitoring facility and  Multicone Separators will be provided as air pollution control system to control particulate matter..

Hot Air Dryer  :  : 1 No. ( Fuel : Natural Gas)

Other Equipments

Reaction Vessel Dryer, Chilling Water plant, Scrubbers(single stage, Cooling Tower, Heat Exchangers, Centrifuges, and Storage Tanks, Air Compressor, Solvents Pumps (SS/PP) ,HDPE Storage Tanks, Weighing Balance, Complete Laboratory Equipments, Fire fighting System as per TAC norms.

Water Treatment Plant:

Water requirement after expansion for domestic and industrial activity during operation phase will be 57 m3/Day. ( Existing Requirement : 3m3/Day)

Effluent Treatment Plant: 

Total Effluent Generation  from the unit during operation phase will be 55m3/Day.

Another 5m3/ Day from Domestic Source.

1. Domestic wastewater (sewage) will be disposed into Septic Tank/Sock Pit system. 

2. The industrial effluent will be sent to ETP & treated effluent is discharged on land for irrigation/plantation/gardening within premises.


Visit :    http://www.industrialdirectoryofindia.com/download


Distillery & Power:                             Project Cost :   Rs.195 Crore.

First Info: February 2017     Update : May 2017

The company plans to set up a New  Grain Based Distillery along with a Co-Generation Power Plant ...

The project is in planning stage. The Project Work is likely to start by December, 2017.        **********************************************************************               The Main Scope of Supply includes:

**********************************************************************

Boiler                     : 30 TPH 1 No. (Fuel :Rice husk or Indian coal or pet coke

Heat Exchangers, Air Pre-heater/Economiser) to be included in the Boiler.

Steam consumption for the process and boiler de-aeration is 21.70 TPH, will be sourced from Boiler ;

TURBINE  GENERATOR : .3 MW- 1 No.

 ===============================
Air Pollution Control Equipment :

ESP/Bag Filters will be installed with the proposed boiler. Adequate boiler stack height will be provided..

DG Set  :  1000 KVA  : 1 No. & 500 KVA  : 1 No.  ( Fuel : HSD)

Other Equipments

Cooling tower with pumps, Dryer, Chilled Water Plant with pumps, Fire Hydrant System, Coal handling system. Ash handling system, Air Cooled Condenser, , Yeast Activation, Vessel Recirculation cum Transfer Pump with motor, Spent Wash pump with flame proof motor etc.

Water Treatment Plant

Total requirement of water for the distillery based on Continuous fermentation, multi pressure vacuum distillation with integrated evaporation, standalone evaporation system to concentrated spent wash  is 1963 m3/Day.. 

Water Requirement in 1st Run= 1963 m3/ Day  Water Recycling    = 1217 m3/ Day

==================================

Total fresh Water                      = 746 m3/ Day

[Process : 122 m3/day+ Soft Water  : 354 m3/day + DM Water : 270 m3/day ]

DM / RO Plant 

 Effluent Treatment Plant :

The proposed project is based on “ZERO EFFLUENT DISCHARGE”. Grain Slops (Spent Wash) will be taken through Centrifuge Decanters for separation of Suspended Solids separated as Wet Cake.The process condensate is cooled and collected into a neutralization tank with sufficient residence time. After Neutralization, this process condensate will be recycled into process and is used for green belt development within the complex.


Visit :    http://www.industrialdirectoryofindia.com/download


Pharmaceuticals:                             Project Cost :      Rs.95 Crore

First Info: November 2016      Update : March 2017 


The company plans to set up a New Bulk Drugs and intermediate Facility .

in Bharuch District, Gujarat.. 

The project is in planning stage. As of 7th November, 2017, the company environmental clearance is in place. Project Work is likely to start in Q1 of 2018. Completion Period : 18 Months

**********************************************************************
The Main Scope of Supply includes:
**********************************************************************

Boiler :  5 TPH  : 2 Nos. (Fuel : Briquette/ Coal) - 

Heat Exchangers, Air Pre-heater 

Air Pollution Control : 
Multi Cyclone & Bag filter
Main source of flue gas generation will be from steam boiler and DG set. The unit will provide Multi Cyclone & Bag Filter as an air pollution control measures for steam boiler. Adequate stack height will be provided .
Thermic Fluid Heater : 15 Lacs/ Kcal - 2 Nos. Briquette/ Coal)
DG Set     :   1250 ( HSD)  : 2 Nos.
Other Equipments

Reactors , Rotary Paddle, Cooling tower, Chilling Plants, Process Pump, Solvents Pumps (SS/PP) . HDPE Storage Tanks. MS/SS Solvent Storage Tanks, Weighing Balance. Fire Hydrant System.             

Water Treatment Plant:   

Total Fresh water requirement : 703 m3/ Day: 

DM Plant/ RO Plant.

Effluent Treatment Plant:   500 KLD.

Total Effluent to be generated:  466 KLD

It may be noted that process industrial effluent will be bifurcated

into four parts

Visit :    http://www.industrialdirectoryofindia.com/download


 

For More Projects Enquiries

               (Over 400 New Project Enquiries 

      + Over 150 Projects Update Every Month)

                  in All Sectors 

                    Visit :    http://www.industrialdirectoryofindia.com/download

*****************************************
            New Projects                       
      FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE   

                   http://www.industrialdirectoryofindia.com/download 

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

              with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                 Contact person's Name

                 E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit :http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

         RELEASED ANNUAL ISSUE :