Super Smelters Limited Plans For Modification Of Its Steel Plant With CPP

1,657 views
Skip to first unread message

Industrial Directory Of India

unread,
Jan 12, 2012, 1:56:14 AM1/12/12
to industrialdir...@googlegroups.com

                           “New Projects This Week"  

                   RELEASED : ISSUE JANUARY  08 /12 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

 

     Super Smelters Limited Plans For 

Modification Of Its Steel Plant With CPP

                                       

Super Smelters Limited  plans for  Modification of  its Steel Plant that  involves setting up of   6,00,000 TPA Iron Ore Pelletisation Plant, 7,60,000 TPA Iron Ore Beneficiation Plant, Installation of 2x500 TPD DRI  along with  a 36 MW Captive Power Plant at Jamuria Industrial Estate, Mondalpur, Mouza Ikra, Tehsil Asansol, District Burdwan, West Bengal.

 

Capacity :

1. Iron Ore Pelletisation Plant:   

     Capacity : 6,00,000 TPA

 

2. Iron Ore Beneficiation Plant:   

    Capacity : 7,60,000 TPA

3. DRI Plant: 2x500 TPD

 2. Captive Power Plant   : 36 MW

      a. WHRB    :  20MW

      b. FBC        :  16MW

 

Location :  

Jamuria Industrial Estate, Mondalpur, Mouza Ikra, Tehsil Asansol, District Burdwan,West Bengal.              

 

As 0n  January 11, 2012 : The Project is under planning stage.

 

The total project area (including existing) is 290 Acres, which is already acquired and 96 Acres (33% of total area) of land area has been earmarked for development of Green Belt all around the project area.

 

IMPORTANT: As per the discussion we had last  on 06.01.2012  with  Super Smelters Limited  the Project is under planning stage.

 

The company is waiting for   Environmental Clerance ..

 

The exiting project has not yet been completely commissioned.

 

However, project work for modification  will commence  as soon as environmental clerance has been received.

 

The Project   is Scheduled to be  Completed

in  2013 .

 

So, this is the RIGHT TIME to contact  and Follow Up at following address obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

The Main Scope of Supply includes:

Captive Power Plant  :

1.Waste Heat Recovery Boiler:

The hot flue gases from DRI kilns will pass through waste heat recovery Boilers to recover the heat and to generate 20 MW electricity. The gases after heat recovery will pass through ESPs and then discharged through chimneys into the atmosphere for effective dispersion of emissions into the atmosphere.

2.Fluidized Bed Combustion (FBC) Boiler:

Total dolochar generated will be used in AFBC Boilers along with coal to generate

16 MW electricity. The flue-gases will be treated in high efficiency ESP and then discharged through stack into the atmosphere.

.

Heat Exchangers, Air Pre-heater/Economiser) to be included both type of Boilers.

 

3. Turbo Generators              : 2 Nos

    .

 

4.SPONGE IRON (DRI) Unit : 2 Nos

     Capacity : 500 TPD

Refractory lined rotary kilns will be used for reduction of Pellets in solid state.

A central Burnerlocated at the discharge end will be used for initial heating of the kiln.Pellets will be continuously fed into the kiln along with coal which has dual role of fuel as well as reductant. Dolomite will be added to scavenge the sulphur from the coal.

***********************************************

Raw Materials

 

Iron ore (fines)-                  9,50,000 TPA

DRI grade Coal-                  4,50,000 TPA

Boiler grade coal for AFBC-  78,000 TPA

Coal fines                           30,000 TPA

Dolomite                            13,500 TPA

Lime stone                         26,000 TPA   and

Bentonite-                          5,200 TPA

 

are the raw materials that will be used in the proposed modification.

 

************************************************

 

Air Pollution Control Equipment :

Electrostatic Precipitators/ Bag Filters

 

The plant shall be provided with Electrostatic Precipitators

having high efficiency (above 99.98%) for collection of the fly ash that would

be produced from the Process of coal combustion in Boiler Furnace.

An  Electro Static Precipitator would be provided for the cleaning / detarring of the Producer gas and the flue gases.

 

Coal from the coal yard will be crushed in a Crusher and conveyed to coal storage bunkers of Boilers through a system of Conveyor Belts, Crusher and Vibrating Screens and is fed to the furnace.

 

ESP, Dust Extraction systems for Conveyor Transfer Points, Crusher and Screen house with Hoods, Bag filter and Fans will be provided.

 

Bag house along with stack will be provided for control of PM and ESP along with chimney will be provided for DRI kiln. Dust suppression will be done using pulse jet bag filters and water sprinkling.

 

 

De-mineralised water from the storage tank will be pumped to the boiler with the

aid of Boiler Feed Pump. The boiler feed water through an Economizer will

the Steam drum and water walls where it is heated and converted to

saturated steam.

 

The steam from the main steam header will be  taken to the

Turbo–Generators. After rotating the turbinethe exhaust steam is

condensed in the Air Cooled Condensers and the

condensed water is pumped to the De-Aerator and fed back to the boilers.

 

Cooling Tower

DG Sets (as stand by during Power Failure)

Air Conditioning Plant

 

Material Handling Equipment

Conveyor

Crusher

Vibrating Screens

Pneumatic Conveying system

 

Other Systems

  • Fuel handling system
  • Ash handling system
  • Air Cooled Condenser
  • Fuel system

 

The following air pollution control systems/ measures are proposed in the Plant

1. All Conveyors will be completely covered with G.I. sheets to control fugitive  

    dust.

2. All bins will be totally packed and covered so that there will not be any chance   

    for dust leakage.

3. All the Dust Prone Points Material Handling systems to be connected with

    de-dusting system with bag filters.

4. All Discharge Points and Feed points, wherever the possibility of dust 

    generation is   there a de-dusting suction point will be provided to collect the dust.

5. The collected Dust from the Bag house of Steel Melting to be taken to a dust 

    storage bin through a Pneumatic Conveying system.

 

Water Treatment Plant :

Oxdisation Chamber, Filter, D.M. Plant

Pumps Valves, Custom Pipeline Work

The proposed project requires about 1,425 m3/Day  of water.

This includes Make-up water for DRI, Power plant and Domestic water.

 

Source Of Water :

Ansol Durgapur Development Authority.

 

Effluent  Treatment Plant:

Water consumption will be minimized by harvesting rain water in harvesting pond.

 No effluent will be discharged outside the plant premises.

 

 Waste water generated in the process will be treated and reused in the process.

 

Char and kiln accretion from DRI plant will be used in AFBC and for filling low lying areas respectively.

 

Fly ash and bottom ash from CPP (FBC) will be sold to brick manufacturing units and cement plants respectively.

The tailing waste will be treated in tailing pond, the metals are separated through a magnetic separator & recycled and the sludge is supplied to brick manufacturers.

 

 The sludge from STP would be stabilized and used as manure for green belt.

.

Other Equipments :

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes

 DG Set, Air Compressor. Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Pressure Filler, Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant,

Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms.                     

 

96 Acres of Greenbelt will be Developed (inclusive of existing) as per CPCB guidelines. 15 m  wide greenbelt will be developed along the periphery of the plant.  and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Power Plant   may  Contact for Specified Enquiry at :

Super Smelters Limited 
'PREMLATA',3rd Floor
39, Shakespear Sarani
Kolkata –700 017, West Bengal, India.
-----------------------------------------------------
Tel        : +91-33-2289 2734/5/6
----------------------------------------------------------
Email      : in...@supershakti.in
Website  : www.supershakti.in

 

***************************

Plant :

Super Smelters Limited 

Jamuria Industrial Estate, Rajaram Danga ( Aam Bagan)

P.O.- Ikra, Jamuria,  Burdwan -713 362, West Bengal, India.

-----------------------------------------------------

Tel        : +91-341-2455077/ 2456688

Telefax :  +91-33-2289 2736

----------------------------------------------------------

Email      : in...@supershakti.in

Website  : www.supershakti.in

 

*****************************               

        

FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

              

     Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE                     

                  

http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                  Contact person's Name

                  E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Over 2250 Nos Projects Enquries Online

                Visit : http://industrialdirectoryofindia.com/annual

 

 


Jan0812.jpg
Reply all
Reply to author
Forward
0 new messages