| Released |
RELEASED : ISSUE JANUARY 18 /15
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail
(Published Every Week :Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600)
| New Project |
Divis Laboratories Plans for
15044.5 TPA Pharmaceutical Unit
Divis Laboratories Limited plans to set up its New Unit- Unit-IV
to produce Bulk Drug & its Intermediates having Capacity of15044.5 TPA at Ontimamidi (Kona) Village, Thondangi Mandal in East Godavari District, Andhra Pradesh.
[Important Note :
The company also plans to set up its Another New Unit : Unit-III
at Kongavanipalem Village , Bhogapuram Mandal in Vijayanagaram District, Andhra Pradesh.
Project Cost : Rs. 300 Crores Capacity : 13768.50 TPA
This manufacturing
facility is proposed to be developed in an area of 60.7 Ha (150 acre) with multipurpose production blocks.
This project is presently in planning stage. As of January 2015, The company is waiting for environmental clearance.
===========================================
Company Profile :
Divis Laboratories Ltd. established its First manufacturing facility in 1995.
Built on a 500 acre site at Hyderabad (Unit-I). The plant comprises of 13 Multi-purpose production blocks and has space for further growth and expansion.
Divis Laboratories Ltd. set up its Second manufacturing facility at Visakhapatnam (Unit-II) in the year 2002 on a 350 acre site. The site has 14 Multipurpose production blocks. ]
Capacity : 15044.5 Ton/Year
This manufacturing facility is proposed to be developed with Multipurpose Production Blocks.
Following API & intermediates products will be manufactured in the New Unit ( Unit-IV) :
1.(+ N-Formyl Octa Base : 450 TPA, 2. Octamandalate Base: 780 TPA 3, PMPA : 780 TPA 4. CHEA(100%): 540 TPA 5. Atipadichloride : 1210 TPA 6. 2-(S) Acetoxy 135 TPA propionylchl, 7 4-CPCCA : 50 TPA 8 3-HAP : 330TPA 9 Benzyladrinone HCl : 560 TPA 10.2-Acetyl-6-methoxy nap:5000 TPA 11 2-(n-Butyl)-4-Chloro-5-formyl imidazole : 250 TPA 12. Beta-Ionylidine ethyl triphenyl phosphene bromide : 400 TPA 13 C10-dialdehyde : 150 TPA 14 1,2,3-Tri-O-Acetyl-5-deoxy-n- ribofuranose : 50 TPA 15 Acetonide : 132 TPA 16 1-Pentynol : 84 TPA 17 Lycopene : 30 TPA 18 Beta-Carotene :100 TPA 19 Cathaxanthin : 10 TPA 20 Apocarotenal : 50 TPA 21 Lutein : 50 TPA 22 Asthaxanthin : 60 TPA 23 ZL-Valine : 150 TPA 24.DL-2,2-Dimethyl cyclopropane-1- carboxylic acid : 30 TPA 25 Dimethylacetylene di carboxylate : 60 TPA 26 N-Hydroxy succinamide 27 Iopamedal : 300 TPA 28 Iohexol : 300 TPA 29 valsartan : 100 TPA 30 AXN 100 TPA 31 Losartan(k) 100 TPA | 32 Mesalamine 200 TPA 33 Orlistat 30 TPA 34 Allogliptin 10 TPA 35 Linagliptin 10 TPA 36 Saxagliptin 5 TPA 37 Merabegran 20 TPA 38 Safosobavir 10 TPA 39 Daltagravir 10 40 S-Nicotin prolacrylics 10 TPA 41 GSK 488062C (API) 1 TPA 42 GSK 2256098C (API) 1 TPA 43 ES-Omiprazole 5 TPA 44 Pentaprozole 20 TPA 45 Viladazone 2 TPA 46 Vildagliptin 75 TPA 47 GSK API 5 TPA 48 MK-3682 2 TPA 49 DTTA Salt 15 TPA 50 Ethyl ester 10 TPA 51 2,4-Thiazole methyl amine: 50 TPA 525-[4-Methylbiphenyl-2yl]-2-trityl- 2Htetrazole : 500 TPA 53 L-Valine methyl ester HCl : 382 TPA 54 4-Bromomethylbiphenyl-2- Carbonitrile 630 TPA 55 NOG 400 TPA 56 2,4,5-Trifluorophenylacetic acid : 350 TPA 57 Triazole HCl : 350 TPA 58 Ethyl -2-Isocyanato Acetate: 10 TPA 59 1-Methyl-1h-Pyrazole-5-Boronic Acid : 10 TPA 60 5-Amino-2-Methyl Benzene Sulfonamide : 10 TPA 61 O-benzyl hydroxylamine hydrochloride : 10 TPA | 62 [(+/-)-trans -1,2- bis(methanesulfonyloxymethyl)cyclohexane 5 TPA 63 4-(1,2-benzisothiazole-3-yl)-piperazine 2 TPA 64 DL-Nicotine : 10 TPA 65 P-Methyl-Ѡ- Pyrrolidino Propiophenone Hcl 10 TPA 66 2-Amino-6-Bromo Pyridine" 10TPA 67 6-Chloro Uracil 10 TPA 68 3-Phthalimido piperidine: 10 TPA 69 Boc azido piperidine 10 TPA 70 Chloroquinozoline : 10 TPA 71 8-Bromo-7-(but-2-ynyl)-3-methyl-1H Purine-2,6(3H,7H) dione 10 TPA 72. 3,5-Di-O-benzoyl-2-deoxy-2-fluoro-2-Cmethyl- D-robonoy-Lactone 25TPA 73 6-®-2,2,6-Trimethyl-1,4-cyclo hexadione 15 TPA 74 Aminobutanol 20 TPA 75 Difluorobenzyl amine : 20 TPA 76 5-Amino-1-isopropyl-3-methyl pyrazole 5 TPA 77 2,5-dichloro-4-ido pyridine 5 TPA 78 Ranolazine 5 TPA 79 (2'R)-N-Benzoyl-2'-deoxy-2'-fluoro-2'-methylcytidine 3',5'-dibenzoate 25 TPA 80 2'-deoxy-2'-fluoro-2'-C-methyluridine 25 TPA 81 Butorphenol tartrate 20 TPA 82 4-Chloro-2-butanone 5 TPA 83 Boc-L-3-fluorophenyl 0.5 TPA alanone 84 2-Carbethoxy-3-cyano-5-methyl hexanoic acid ethyl ester 2 TPA 85 GSK 2357577A 0.5 TPA 86 5-(2-Phenyl ethyl)-2-(Propan-2-Yl)Benzene- 1,3-diol 0.5 TPA |
Location : Ontimamidi (Kona) Village, Thondangi Mandal East Godavari District, Andhra Pradesh.
**************************************
As on January 19, 2015 : The Project is under Planning Stage.
Total site area is 489 Acres.
Break up :
Build up area : 106.87 Acres
Greenbelt Development : 27.36 Acres
Road Network : 16.33 Acres
Common Facilities Area : 8.00 Acres
Future expansion : 339.44 Acres
===========================
Total Area : 489 Acres
IMPORTANT: As per the
the discussion we had
on 15.01.2015 with Divis Laboratories Limited
the Project is under Panning Stage.
The company is still waiting for Environmental Clearance.
The Project is Scheduled to be Completed
in 18 to 24 Months from the date of commencement of the project.
-------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following address to obtain
the detailed Enquiry of each product in time and to submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Fuel : Coal
Heat Exchangers, Air Pre-heater/Economiser)
Wet Scrubber for arresting fly ash
Air Polution Control:
There will be one no of flue gas stack and one process gas stack which
are the main emission source from the plant for Boiler.
Proper Stack height and air pollution control measures will be provided in order to achieve norms prescribed by statutory authority.
For Boiler Multi Cone Cyclone & Bag filter will be provided.
Process Emission:
Scrubber : Gases emission will be scrubbed in Two Stages with Water and Caustic solution, based on the characteristics of the gases.
Solvent Management for Effective Recovery:
Reactor will be connected to Chilled Brine Condenser System
Solvent Storage will be provided with breather valves to avoid losses
************************
Other Equipments:
SS Reactor
---------------------------------------------
Dryer
---------------------------------------------
HCl Fume Scrubber
--------------------------------------------
Chilling Water plant
---------------------------------------------
Filter Drier
-----------------------------------------------
Cooling Tower
---------------------------------------------
SOLVENT RECOVERY SYSTEM
-------------------------------------------
DM/R.O. plant
----------------------------------------------
Water Softener
---------------------------------------------
Air Compressor
----------------------------------------------
Effluent Treatment Plant
----------------------------------------------
Pumps
-----------------------------------------------------
Centrifuge
----------------------------------------------
SS & HDPE Storage Tanks
-----------------------------------------------------
Compressor
----------------------------------------------
**************************
DG sets :
Power required will be taken from AP TRANSCO and sub-station will be setup within thepremises of the proposed project, a power grid of 15000 KW Sub Station is proposed forthe project and for emergency DG sets will also be installed.
***********************************************
Water Treatment Plant:
Pumps, Valves, Custom Pipeline Work, Plumbing Work
The total Water demand for this project has been estimated as 6500 m3/Day.
Water will be sourced from the ground water and nearest water body (Jammeru vagu, samarlakota canal & Thandava River. (The drinking water requirement for the proposed project is 500 m3/Day.)Details of Water Consumption
1.Process Water
2.Boiler : 1202 m3/Day7. Plant Toilets : 74 m3/Day
3. Canteen & Drinking Halls 157 m3/Day
4. Cooling Tower : 1245 m3/Day
5. Water for Hostels 1145 m3/Day
6. Construction & Garden: 200 m3/Day
Total: 6414 m3/ Day
Details of Waste Water Generation
1.Process Water
2.Boiler : 1022 m3/Day7. Plant Toilets : 62 m3/Day
3. Canteen & Drinking Halls 125 m3/Day
4. Cooling Tower : 1058 m3/Day
5. Water for Hostels 1145 m3/Day
6. Construction & Garden: ..............
Total: 5587 m3/ Day
Effluent Treatment Plant:
Sewerage system will be designed in proposed project according to the elevation and contour
profile. Sewage water generated form common facilities will be transferred through a pipe
line system and diverted to STP Sewage Treatment Plant.
The treated water will use for the green belt and flushing purposes.
The effluent generated is mainly from process, washings, scrubbers, cooling towers & boiler blow downs and domestic effluent.
Solid and Hazardous Waste:
Process Residue : 3102.87 kg/day
ETP Sludge : 200 kg/day
Multiple effect evaporation : 691 kg/day
or forced evaporation
Incineration ash : 75 kg/day
or forced evaporation
Domestic waste water : 1160 KLD
The treated wastewater will be reused for flushing and green belt development.
The treatment scheme shall be designed to treat the wastewater and reuse the treated water for Gardening and flushing.
The industrial effluent is proposed to be treated in the proposed ETP with Zero Liquid Disposal (ZLD) System.
The process effluent (High Pollution Stream) will be taken to neutralization tank and treated with suitable chemicals to bring down pH to neutral condition. Then, the effluent will be fed to solvent stripper followed by Multiple-Effect Evaporator (MEE) and ATFD.
The solvent will be stripped initially and collected in a receiver, then the remaining effluent is further concentrated from 4% to 40% in MEE, and further concentrated into salts with 6-8% moisture in ATFD.
The MEE condensate will be routed through proposed biological effluents treatment plant to further treat any residual COD. The low polluting stream wastewater will be mixed with condensate of High polluting stream and treated in the biological treatment system.
The treated water will be used for Cooling Tower, Flushing and Gardening.
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms.
Green Belt Development plan in 27.36 Acres area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipment Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Divis Laboratories Limited
Divi Towers, 7-1-77/E/1/303, Dharam Karan Road
Ameerpet, Hyderabad - 500 016. Telangana, India.
-------------------------------------------------
Tel : +91- 40- 2378 6300
Fax : +91-40- 2378 6460
Email : ma...@divislaboratories.com
Website : www.divislabs.com
| New Projects |
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
GET NEW PROJECTS INFORMATIONS ONLINE
http://www.industrialdirectoryofindia.com/download
We provide information on NEW PROJECTS such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.
with all Contact Details:
Company's Name
Address/ Phone/ Fax
Contact person's Name
E-mail Id
We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.
We make your Bidding/MARKETING/ Sub-contracting & Planning MORE EASY
GET YOUR COMPANY REGISTERED TODAY AND GET ALL PROJECTS INFORMATIONS DIRECTLY IN YOUR MAIL BOX .
Visit : http://www.industrialdirectoryofindia.com/registration
GET ALL BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX
------------------------------------------------------------------------------------------------------------
RELEASED ANNUAL ISSUE :
“NEW PROJECTS THIS WEEK”