FREE TRIAL COPY : Projects Update (Projects under Planning Stage) : 31st October, 2017.,,,,,..........

14 views
Skip to first unread message

Industrial Directory Of India

unread,
Nov 2, 2017, 1:35:45 AM11/2/17
to industrialdir...@googlegroups.com
Industrial Directory of India.Com 

       Released

          "New Projects This Week" 
                RELEASED : ISSUE October  29/17
            Comprising  of  Total  81 New Project Enquiries  
            http://www.industrialdirectoryofindia.com/download
************************** 
Get Your FREE Trial Copy Today
    For All Sectors with All Contact Details)
=============================================
                       Projects Update
            (Projects under Planning Stage) 
  Visit :    http://www.industrialdirectoryofindia.com/download  

(Helpline : +91-900 7158 600/ 900 7742 600)   

Project Update             31st October, 2017

Pharmaceuticals :                      Project Cost :   Rs.9.0 Crore    

First Info: October 2017 

The company plans for expansion of its Bulk Drug intermediates Unit

The project is in planning stage.

As of  31st October, 2017, the company is waiting for necessary clearance.

**********************************************************************

The Main Scope of Supply includes:
**********************************************************************

Boiler : 3 TPH (Fuel : Coal)            : 1 No. 

Boiler : 2 TPH (Fuel : Coal)            : 1 No. 

Existing :  1 TPH (Oil Fired)

 Heat Exchangers, Air Pre-heater 

---------------------------------

Air Pollution Control :  

Multi Cyclone Dust Collector and Bag Filter
Air pollution control measures is proposed for the effective control of gaseous emissions within permissible limits. Cylcone Separator with Bag filter and Scrubber to be provided to boiler to control particulate emissions.   
DG Set       : 650 KVA( HSD)  :  1 Nos. (Existing : 250 KVA)  

Other Equipments:

Reactor, Heat Exchangers, Centrifuges, and Storage Tanks. To support the process equipment Boilers, Chilling plants, Cooling Towers, Agitator, Weighing Balance. Fire Hydrant System, Coal Handling System.c

==============================================

Water Requirement 120.30 m3/ Day                                                                   [Domestic : 4 m3/day + Process : 12.30 m3/day Boiler  : 36 m3/day  + Cooling Tower : 60 m3/day + Washing : 3 me/Day + Scrubber   : 2 m3/day.   Gardening : m3/day               

Effluent Treatment Plant :  

Waste Water Generation :  38.50 KLD 

Visit :    http://www.industrialdirectoryofindia.com/download


Agro-Chemical   :                         Project Cost :  Rs. 84 Crore  

First Info: October 2017 


The company plans to set up a New Agro-Chemical Intermediates manufacturing unit .

The project is in planning stage. 
As of 31st October, 2017, Pre-Project Activitis are on. 

**********************************************************************
The Main Scope of Supply includes:
**********************************************************************           Boiler :    8 TPH: 1 No. (Coal)  Working

Boiler :    5 TPH: 1 No. (Coal) Stand by

Heat Exchangers, Air Pre-heater.   

Air Pollution Control :  Dust collector & bag filter

The sources of air pollution in the plant are for proposed 1 x 8 TPH and 1 x 5 TPH Coal fired boiler. Backup DG sets  to energy requirement during load shut downs.. Dust collector & bag filter shall be provided with stack heights based on the CPCB formula for effective stack height..
Thermic Fluid Heater : 2 Lac/KCal : 2 Nos. ( Fuel :Coal)
Incinerator                 :  800 Lit/hr :  1 No. ( Fuel : FO)
DG Set                        :  1 X 500 KVA ( HSD)  
Other Equipments:
Reactor, Heat Exchangers, Centrifuges, and Storage Tanks, Chilling plants, Cooling Towers, Reactor, Centrifuge, Air Compressor, Effluent Treatment Plant, Pumps, Centrifuge, SS & HDPE Storage Tanks , Agitator, Weighing Balance. Fire Hydrant System  etc..

Water Treatment Plant

Oxidisation Chamber, Pressure Sand Filter / IRF, R.O. Plant,                             

Water Requirement 2118 m3/ Day                                                                    [Domestic : 20 m3/day + Process : 1418 m3/day Boiler  : 215 m3/day  + Cooling Tower :400 m3/day + Washing : 40 me/Day + others   : 10 m3/day.   Gardening : 15 m3/day      

Effluent Treatment Plant :   1500 KLD

Waste Water Generation :1578 KLD  ( Industrial :  1561 KLD + Domestic : 17 KLD)


Visit :    http://www.industrialdirectoryofindia.com/download

Pharmaceuticals       

First Info  : May 2016       Update :  January 2017

The company plans to set up a New Bulk Drug & Pharmaceuticals unit  in Maharashtra.

The project is in planning stage. 

The Project Work is likely Start by May, 2018. Completion Period : 12 –18 Months

********************************************************************

The Main Scope of Supply includes:

**********************************************************************

Boiler :  3 TPH  ( Fuel : Coal/ Biomass) 1 No

Heat Exchangers, Air Pre-heater/Economiser)  .

Air Pollution Control : 

Adequate stack height and common stack monitoring facility and  Multicone Separators will be provided as air pollution control system to control particulate matter..


DG Set  : 100 KVA  : 1 No. ( Fuel : HSD)

Other Equipments

Reaction Vessel Dryer, Chilling Water plant, Scrubbers(single stage, Cooling Tower, Heat Exchangers, Centrifuges, and Storage Tanks, Air Compressor, Solvents Pumps (SS/PP) ,HDPE Storage Tanks, Weighing Balance, Complete Laboratory Equipments, Fire fighting System as per TAC norms.

Water Treatment Plant:

Water requirement of the project for domestic and industrial activity during operation phase will be 70 m3/Day.

Effluent Treatment Plant: 

Total Effluent Generation  from the unit during operation phase will be 24 m3/Day.

Another 2 m3/ Day from Domestic Source.

1. Domestic wastewater (sewage) will be disposed into Septic Tank/Sock Pit system. 

2. The industrial effluent will be sent to ETP & treated effluent is discharged on land for irrigation/plantation/gardening within premises.


Visit :    http://www.industrialdirectoryofindia.com/download


Sugar & Power :                            Project Cost :        Rs.240 Crore.  

First Info: October 2017 


The company plans for expansion of existing Sugar Manufacturing unit  and Co-Generation Power Plant.

The project is in planning stage. 
As of 31st October, 2017, The company is waiting for necessary clearance. 

**********************************************************************

The Main Scope of Supply includes:
**************************************************************i********

Boiler :  32 TPH: 2 Nos. (Fuel : Bagasse)                                                                        Existing :   80 TPH & 120 TPH, each 1 No                                                                                       Heat Exchangers, Air Pre-heater.   

Air Pollution Control : ESPb & Wet Scrubber

ESP is installed on 120 TPH boiler with stack height of 65 m and wet scrubber on 80 TPH boiler with 50m stack height. Adequate stack height has been provided for the DG set. After Expansion, wet scrubber shall be provided with proposed 2 x 32 TPH boiler having 50m stack height.

Other Equipments

Milling Plant. Belt conveyor with t ramp iron separator, Swing Hammer Fibrizer.Fermentation plant, Distillation plant, Evaporation plant, Molasses storage tanks, Alcohol storage tanks, Spent wash storage tanks, Fuel system, Cooling Tower, Bottling Plant Dryer, Multiple Effect Evaporators.  

 Water Treatment Plant

Oxidisation Chamber, Pressure Sand Filter / IRF, R.O. Plant,Tube Settler, Pumps Valves, Custom Pipeline Work.Water Consumption after expansion: 10,571 m3/Day. ( Present Requirement : 6275 m3/Day)

Effluent Treatment Plant :  

Waste Water Generation :  3236 KLD 

 

Visit :    http://www.industrialdirectoryofindia.com/download


Chemical  :                 

First Info: October 2016        Update  : March 2017
 

The company plans to set up a Synthetic Organic Dyes production unit  in  Gujarat.

The project is in planning stage. 

The Project Work is likely to start by March, 2018 :  Completion Period : 18 Months

**********************************************************************
The Main Scope of Supply includes:
**********************************************************************

Boiler :  1 TPH: 1 No. (Agrowaste)   

Heat Exchangers, Air Pre-heater.  

Air Pollution Control :
The proposed air pollution control equipment for coal fired boiler is Bag filters/Multi Cyclone.. DG sets shall be provided with stack heights based on the CPCB formula for effective stack height.

DG Set                       :   65 KVA ( HSD)  : 1 No. 

Other Equipments

Reactors, Kettles, Heat Exchangers, Centrifuges, Storage , Chilling plants, 

Cooling Towers, Pumps etc.                         

Water Treatment Plant

Oxidisation Chamber, Pressure Sand Filter / IRF, R.O. Plant,

Tube Settler, Pumps Valves, Custom Pipeline Work.                                                                                         The gross fresh water requirement for various domestic, gardening & industrial activities                      will be 29 m3/Day..

************************************ 
Effluent Treatment Plant : 10 KLD

There will be wastewater generation from the manufacturing process as well as boiler blow down, cooling make-up, APCE and washing activities @ 6 KLD.


This effluent will be collected and treated in own Effluent Treatment Plant (ETP) comprising of primary, secondary & tertiary treatment followed by RO. 

Visit :    http://www.industrialdirectoryofindia.com/download


 

For More Projects Enquiries

               (Over 400 New Project Enquiries 

      + Over 150 Projects Update Every Month)

                  in All Sectors 

                    Visit :    http://www.industrialdirectoryofindia.com/download

*****************************************
            New Projects                       
      FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE   

                   http://www.industrialdirectoryofindia.com/download 

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

              with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                 Contact person's Name

                 E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit :http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

         RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”              



Oct2917.jpg