Projects Update (Projects under Planning Stage) : 5th December, 2017.,,,,,.........,,,,....,,,,,,,,

31 views
Skip to first unread message

Industrial Directory Of India

unread,
Dec 6, 2017, 8:47:41 AM12/6/17
to industrialdir...@googlegroups.com
Industrial Directory of India.Com 

       Released

            "New Projects This Week" 
                RELEASED : ISSUE December  03/17
            Comprising  of  Total  81 New Project Enquiries  
            http://www.industrialdirectoryofindia.com/download
           ************************************ 
          Projects Update
            (Projects under Planning Stage) 
  Visit :    http://www.industrialdirectoryofindia.com/download  

(Helpline : +91-900 7158 600/ 900 7742 600)   

Project Update            5th December, 2017

Pharmaceuticals  :                      Project Cost :     Rs.28 Crore  

First Info: December 2017 
The company plans to set up a New Bulk Drugs manufacturing project .......    ..
The project is in planning stage.
As of  5th December, 2017, the company is waiting for necessary clearance.
**********************************************************************
The Main Scope of Supply includes:
**********************************************************************
Boiler : 3 TPH (Fuel : Natural Gas )            : 1 No. 
 Heat Exchangers, Air Pre-heater 
---------------------------------
Air Pollution Control :  Cyclone & Bag Filter
The source of flue gas emission will be from the stack attached to Boiler & Thermic Fluid Heater. Adequate StacK height of 3o Meters will be maintained both for Boiler & Thermic Fluid Heater.   ,  
Thermic Fluid Heater : 1 Lac/KCal : 1 No. ( Fuel :Natural Gas)
DG Set                        :    250 KVA  ( LDO)  
Other Equipments:
Reactor, Heat Exchangers, Centrifuges, Cooling Tower, Chilling plants, , Agitator, Weighing Balance. Fire Hydrant System, Water Treatment Plant etc., .
==============================================
Water Requirement after expanson126 m3/Day (Existing  12 m3/Day)  [Domestic : 3 m3/day + Process : 98 m3/day Boiler  : 11 m3/day  + Cooling Tower :11 m3/day + lab : 2 m3/day +  
   Washing : 2  m3/day + Gardening : 1 m3/day  ]
Effluent Treatment Plant : 100 KLD
Waste Water Generation :  93.10 KLD 
Industrial: 91.1 KLD + Domestic: 2 KLD.
Domestic Wastewater is 2 KL/day will be disposed off through Soak Pit/Septic Tank System.  Industrial Effluent of 91.1 KL/day will be sent to ETP for primary treatment .
Visit :    http://www.industrialdirectoryofindia.com/download

Chemical  :                        Project Cost :         Rs.115 Crore  

First Info: December 2017 

The company plans to set up New chemicals manufacturing Unit........    ..
The project is in planning stage.  As of  5th December, 2017, Pre-Project Activities are on.
**********************************************************************
The Main Scope of Supply includes:
**********************************************************************
Boiler : 2 TPH (Fuel : Natural Gas)            : 1 No. 
 Heat Exchangers, Air Pre-heater 
---------------------------------
Air Pollution Control :  
Air pollution control measures is proposed for the effective control of gaseous emissions within permissible limits. adequate Meter  to be provided to boiler to control particulate emissions.  
Thermic Fluid Heater : 10 Lac/KCal : 1 No. ( Fuel :Natural Gas)
DG Set  :  1000 KVA  :    2 Nos. ( Fuel : HSD ). 
Other Equipments:
Reactor, Heat Exchangers, Centrifuges, and Storage Tanks. To support the process equipment Boilers, Chilling plants, , Agitator, Weighing Balance. Fire Hydrant System, 
==============================================
Water Requirement 23 m3/ Day                                                                 
Waste Water Generation :  10.5 KLD 

Visit
 :    http://www.industrialdirectoryofindia.com/download

Pharmaceuticals  :              Project Cost   :               Rs.6 Crore    

First Info: December 2017 

The company plans to set up an  Active Pharmaceutical Ingredients manufacturing unit
....    ..
The project is in planning stage.The Project Work is likely to start in Early 2018.  Completion by End of 2018.
**********************************************************************
The Main Scope of Supply includes:
**********************************************************************
Boiler : 1.0 TPH (Fuel : Coal/Briquettes:) -  : 1 No. 
 Heat Exchangers, Air Pre-heater 
---------------------------------
Air Pollution Control :  Bag Fliter & Multi clone Separator 
The source of flue gas emission will be from the stack attached to Boiler.  Bag filter followed by cyclone separator with stack will be provided as APCM to prevent flue gas emission.
DG Set  :  125 KVA  : 1 No. ( Fuel : HSD ). 
Other Equipments:
Cooling Towers, Reactor, Heat Exchangers, Centrifuges, and Storage Tanks. To support the process equipment Boilers, Chilling plants, , Agitator, Weighing Balance. Fire Hydrant System, ,..
==============================================
Water Requirement 40 m3/ Day 
Effluent Treatment Plant :  
Waste Water Generation : 27 KLD 
Visit :    http://www.industrialdirectoryofindia.com/download

Sugar, Distillery & Power :                Project Cost :   Rs. 275 Crore 

First Info: December 2017

The company plans for expansion of its Sugar plant and Co-Generation Power plant along with a New Distillery

The project is in planning stage. As of 5th December, 2017, Pre-Project Activities are on. 
**********************************************************************
The Main Scope of Supply includes:
**************************************************************i********
Boiler :  100 TPH: 1 Nos. (Fuel : Bagasse/ Coal
Existing : 20 TPH and 32 TPH
Heat Exchangers, Air Pre-heater.   
Air Pollution Control : ESP
ESP will be provided to 100 TPH Boiler to bring down the particulate matter to below 50 mg/Nm3. The exhaust gases from the boiler will be discharged into the atmosphere through a stack of 80 m height for effective dispersion of gases into the atmosphere.
Turbine               :  20 MW- 1 No. 
Other Equipments
Milling Plant. Belt conveyor with t ramp iron separator, Swing Hammer Fibrizer.Fermentation plant, Distillation plant, Evaporation plant, Molasses storage tanks, Alcohol storage tanks, Spent wash storage tanks, Fuel system, Cooling Tower, Bottling Plant Dryer, Multiple Effect Evaporators.  Bagasse Handling system : 100 TPH & Coal Handling System : 45 TPH
==============================================
Water Treatment Plant
Oxidisation Chamber, Pressure Sand Filter / IRF, R.O. Plant,Tube Settler, Pumps Valves, Custom Pipeline Work.Water Consumption after expansion: 1208 m3/Day.
Effluent Treatment Plant :  
Waste Water Generation after Expansion: 1640 KLD .  
Visit :    http://www.industrialdirectoryofindia.com/download

Paper :                                Project Cost :         Rs.12 Crore 

First Info: March 2017  
The company plans to set up a New Mini  Paper Mill ...

The project is in planning stage. Project Work is likely to start by by February/ March, 2018
**********************************************************************
The Main Scope of Supply includes:
**********************************************************************
Boiler : 8 TPH       : 1 No. (Fuel : Rice Husk)
Heat Exchangers, Air Pre-heater 
Air Pollution Control : 
Bag Filters & Dust Collectors
Boiler will be equipped with bag filters with dust collectors for controlling air pollution and 30 M. height stack for wider dispersion of pollutants..    
                             
DG Set  :  125  KVA  : 1 No. ( Fuel : HSD) 
Other Equipments
Chemical Recovery Unit,  Pulp Machine ,,Cooling Tower, Air Compressor, Effluent Treatment Plant, Pumps, Centrifuge, SS & HDPE Storage Tanks , Agitator. Fire Fighting Equpments etc.
==============================================
Water Treatment Plant:   
Water Requirement : 1600 m3/day  
--------------------------------------------------------------------
RO Plant 
Effluent Treatment Plant      :  800 KLD
Waste Water Generation      : 780 KLD
PROCESS DESCRIPTION: 
Approx. 780 KLD of waste water will be generated from the proposed paper mill project. An ETP of 800 KLD capacity based on Activated Sludge Principle (ASP) will be installed for treatment of generated waste water of paper mill. Treated waste water will be 70% recycle and reuse in process and other activities inside the premises and balance 30% treated water will be discharge to govt. drains.
Visit :    http://www.industrialdirectoryofindia.com/download

For More Projects Enquiries

               (Over 400 New Project Enquiries 

      + Over 150 Projects Update Every Month)

                  in All Sectors 

                    Visit :    http://www.industrialdirectoryofindia.com/download
*****************************************
            New Projects                       
      FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES
                   Visit : http://industrialdirectoryofindia.com/FAQ
      GET NEW PROJECTS INFORMATIONS  ONLINE   
                   http://www.industrialdirectoryofindia.com/download 
We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.
                
              with all Contact Details:
                 Company's Name
                 Address/ Phone/ Fax
                 Contact person's Name
                 E-mail Id
 
We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.
 
We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY
GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .
 
Visit :http://www.industrialdirectoryofindia.com/registration
 
GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX
------------------------------------------------------------------------------------------------------------
 

Dec0317.jpg
Reply all
Reply to author
Forward
0 new messages